Post Job Free

Resume

Sign in

Power Plant Engineer

Location:
Holbrook, NY
Salary:
25-27$ hr
Posted:
June 15, 2015

Contact this candidate

Resume:

EDWARDO NIEVES

**** ******** ****** *** *

Elizabeth, N.J. 07208

Cell # 908-***-****

Email acp8nn@r.postjobfree.com

OBJECTIVE: Seeking a challenging and responsible position where I can utilize my acquired professional skills and advance within my field.

QUALIFICATIONS:

N.J. Red Seal Refrigeration

Water Treatment

N.J Blue Seal Engineer License

Valve/Pump Repair

Chillers

Preventive and Corrective Maintenance EMPLOYMENT

2014 - Present:

Boiler Technician, Refrigeration, NH3 Systems AL & JOHN INC. Glen Rock Ham

3) water tube boilers total of 450 HP 6) GEA NH3 COMPS Total of 1,655 HP 30,000 pounds of NH3 low temp med temp HI temp system . Carrier Air Conditioning system Trane AIR Conditioning system Total of 80 TONS FOR cooling 10) RTU FOR cooling 51) AU Evaporators for cooling boxes High press themosyphon receivers Desuper Heater for DA Tank 6) cooling towers w/ free cooling (cold) water Chiller PC1 for tank room water chiller for storage tank PC2 also using NH3 for plates Chillers . 8) Propylene Glycol Heat Exchanger also NH3 suction @ 32 psi

2006-2014

Operating Engineer, H.V.A.C. DEPT. Izod Center,

Operating two mechanical enclosure hot water system, supply temperature 80 degrees, 46 psi. Chilled Water System, three carrier, one Teco Chillers 3000 tons CHW System, eight cooling towers. Ice Brine System, three screw carrier, one Teco Dual Engine total 600 tons, one cooling tower to maintain temperature for ice Glycol System. Dehumidify System, four Munter Units, space temperature and humidity, four High Bay Humidity Control (AHU). Pressure relief ventilators, four Energy Generators, fuel oil sump pumps.

2003- 2006 Boiler Technician, Refrigeration, NH3 Systems, Parmalat Dairies. Operating five boilers Cleaver Brooks Boilers 1,500 hp (total), Cooling Systems Three chiller R-22, also Glycol, cooling towers, maintenance, four Niagara NH3 System. Glycol use also, four fricks units, NH3, Hot Gas, One Chester Jenson Chiller, High Pressure Receiver NH3, High Suction Accumulator, four NH3 Compressors,, 1200 tons, five condensers

2002-2003

Boiler Technician, Rokeach Foods

Operator of tow 500 Hp Cleaver Bronsible for feed water unit 180F, chill water unit 44 F, Preparation of boilers, valves compressor and pumps for inspection.

2000-2002

Boiler Technician, Central Power Plant

Operator of four 1,000 HP Johnson fire tube boilers, Responsible for international boiler water treatment, four chillers, 1200

tons-cooling/four cooling towers, feed water unit D.A. tan, temperature over 1S0F Centrifugal pump maintenance, valve operation and maintenance.

EDUCATION

Date: Tozar Energy Systems S IO., (course Studied)

Date: Adam R. Bialer: Field Service Engineering

Date: Air Conditioning and Heating resource center: (Course Studied)

REERENCES:

Available upon request



Contact this candidate