Boilermaker/Pipe-fitter /Welder
GLENN ROBINSON
* ********** **** ******, ******* 6167.
Western Australia
Phone: 043*-***-***
acp3tm@r.postjobfree.com
As a quality conscious tradesperson with a strong work ethic, I have amassed a wealth of experience in a variety of settings, both country and metropolitan. This strong work ethic, along with my diligence in regards to Occupational Health and Safety Issues and many other areas of personal strengths, make me an asset to my employers. I am keen to continue using my strong skill base in order to further my career with a reputable organisation such as yours
Personal information
Age; 36
D.o.b; 11 April 1979
Place of birth; Perth Western Australia
Material status; Partner and 3 children
Drivers licence; C-class,no. 4100962,expires 16/12/2018
Education
1992-1995; Christian Brothers college completed year 11
1996; horticulture pre vocational training. (pre app)
1996; Fitting and Machining pre vocational training. (Pre app)
1997-2000; CCI (migta) Boilermaker/welder apprenticeship
Certificates attained
;Certificate III in Engineering ( fabrication)
;trade Certificate engineering tradesperson
Additional certificates and courses
;Bluewater power station: 2015
;First aid :2013 valid
;Working at heights :2013
;project management certificate skill portal (part time study,ongoing)
;C.S.B.P,brown fields inducted 2012
Current WA Driver’s Licence Class C – MDL No. 4100962
;Maritime Security Identification Card – 2012
;Fremantle Ports – Operational 2011
;Enter Confined Space - 2012 .
;BHP nickel west Kwinana/Kalgoorlie induction 2012
;wagaup alumina inducted 2011
;Worsley brown fields inducted 2009.
;Port headland port induction /BHP Neilson point
;Mine Employees Health Surveillance Card - 2009.
;Fatigue Management Certificate Course - 2009.
;Blue Card – 2007.
;nf17 welding certificate theory A -2000
;nf62 wedding certificate theory B-2000
;nbbo5 quality concepts-2000
INDUSTRIAL EXPERIENCE
• Pipe fitting and welding
• Maintenance technician boilermaker/welder
• Structural steel,6g Pipe welder
• Plant fabrication
• Detailed drawings
• Instrument fitting experience
• Drilling rig boilermaker/welder
• Gas plant construction
• Mine plant construction, new and old
• Plant maintenance
• Stainless steel fabrication
• Guillotine work
• Pipe bending
• Heat treatment and straightening
• Repairs to all mining equipment
• Hydrogen plant maintenance
• Repair on acid lines
• Cyclones rebuild/refit
Pressure vessels, tank building
WELDING EXPERIENCE
MMAW – Welding mild/high carbon steel; structural and pipe coded welding; 5p Pipe stove welding (water, slurry / diesel/oil gas,heavy wall thickness 4"pipe onwards,tank repairs,floor plates iron powder
GMAW – Flux core,Solid wire, 211,232 inner shield
GTAW welding all positions, carbon steel, stainless (Purge & TGX) super alloy Inconel,duplex, copper nickel.
SAW,Automatic submerged machines (ATW & AGW)
N
• Plasma cutting
• Air arc gouging
C.C.R
April 2015/may 2015
Bluewater power station collie
2 week shutdown coal burner
Boilermaker welder maintenance
Downer E.D.I
Nov 2012/Dec 2014
Ammonia nitrate plant
C.S.B.P construction An3 project
Pipe fitter on nightshift
UNITED RESOURCES (U.G.L )
Sep 2012 /October 2012
B.P shutdown outage
Pipe fitter / boilermaker
.Boiler and pipe change
CRISP ENGINEERING August 2011 / ongoing on and off when needed
CRISP ENGINEERING (part-time)
• Bolt or arc-weld pressure vessel structures and parts together
coded Welding on floating barge in Henderson
BHP Kwinana nickel refinery shutdown
Transfield services ( workshop ;closed down)
Feb 2012/July 2012
Coded welder and checker (Kwinana workshop)
(c.s.i) mineral resources
BOILERMAKER/WELDER/Supervisor
Sept 2011 to Feb 2012
Construction of ship loader and iron ore train,screen house,
Supervisor of team to punch list and commissioning
UNITED RESOURCES (U.G.L )
BOILERMAKER/WELDER
April 2011 /Sept 2011
–VERVE ENERGY Kwinana power station shutdown outage
• Boiler tube inspection/rebuild inconel ash hopper
Replace inside skin, pipe fit and weld.
S.D.R Australia (Tenix )
PIPE FITTER/PIPE WELDER/Boilermaker-CONSTRUCTION
Jan 2009 / feb 2011
;BHP NELSON POINT, PORT HEADLAND
Construction of 8km diesel pipeline and two storage tanks in
Neilson point fuel storage facility Port headland
Stove welding /inner shield/.
;Worsley E&G expansion project
Welder/Pipe fitter-CONSTRUCTION
Storage tanks and precipitator towers / pipe work
UNITED RESOURCES (U.G.l )
PIPE FITTER – MAINTENANCE
Sept 2008 /Dec 2008
Major shutdown, Worked on alkali rebuild and cracker,dismantled inside,replacement, repair
Ensign Energy (Orlando Drilling Enterprise)
Rig welder /Roughneck
• Welding and design on Ensign Dreco Rig 48
• Infill Drill Program (Oil and Gas)
PIPE FITTER/BOILERMAKER/CODED WELDER
FEB 2007 /JUNE 2008
MAINTENANCE/Design
(Acid plant management) formally weldtronics Australia
Feb 2007 on and off ongoing contract work
BHP Nickel West – Kwinana Refinery, Kalgoorlie Smelter (Hydrogen and acid plant),reduction Claves
• Alcan, Gove Alumina Refiner, Northern Territory (Arnonland)
Bibra Lake workshop
Q.A. Welding trainer 2012 / welder pipe fitter /leading hand
H.P.S ENERFLEX
PIPE FITTER – CONSTRUCTION
AUG 2006 / FEB 2007
Located at Maitland, Karratha
construction of LNG gas plant
MONADELPHOUS
BOILERMAKER/WELDER – CONSTRUCTION
April 2006 to / 2006
• Located at BHP Finucane Island, Port Hedland
• Car Dumber No 4 (iron ore),tanks and pipe work
AGC (ausclad industries )
PIPE FITTER/PIPE WELDER - CONSTRUCTION
APRIL 2005 / AUG 2005
Located at Dampier Port upgrade (
Diesel pipeline and screen house)
PIPE FITTER/CODED WELDER – MAINTENANCE
Located at Murrin Murrin nickel (
Repair on autoclaves and hydrogen plant,Acid plant
SOUTHERN CROSS ELECTRICAL
BOILERMAKER/WELDER – CONSTRUCTION
FEB 2004 /March 05
LOCATED AT RIO TINTO HI smelt PROJECT, KWINAN A FABRICATION AND INSTALLING OF CABLE LADDER & instrument tubing working under electrical
AIM MAINTENANCE (Formerly western mining Now B.H.P)
BOILERMAKER/WELDER/PIPE FITTER/MAINTENANCE TECHNICIAN leading hand,sub supervisor
sub supervisor
Feb 2002 / Mar 2004
• LOCATED AT BHP, FORMERLY WMC KWINAN A NICKEL REFINERY
SDR Australia –( TENIX)
CODED WELDER – CONSTRUCTION
AUG 2001/ FEB 2002
• Located at Rio Tinto Argyle Diamond Mine, Kununurra, WA
Screen house,hopper,tanks,pipe work
REFEREES
Mr Bill Henry
Manager
C.b.i
Mr joe Reid
Supervisor
Downer c.s.b.p an3
Mr Dave Osman
Managing Director,
Australia/
Acid Plant Management
M: 043*-***-***
P; 9434 7150
Mr Aaron Bails
Superintendent for AGC and UGl
M: 041*-***-***