Post Job Free

Resume

Sign in

Manager Construction

Location:
Alpharetta, GA
Posted:
April 18, 2015

Contact this candidate

Resume:

ANTONIA CHAMBERS

***** ********** *****, **********, ** 30005

aco86o@r.postjobfree.com

470-***-****

OBJECTIVE:

To gain the position of a Wireless Project Manager where my ten years of progressive

telecommunication wireless experience will contribute towards the growth of the organization..

SKILLS/KEYWORDS:

SPRINT-SITERRA, MS OFFICE, NSN, COP, DAS

ALU-FST, RRU, RBS 3106, 3206, GPS, CONSTRUCTION MANAGEMENT, PM

ERICSSON- SITE HANDLER, INTEGRATION, COMMISSIONING, LTE, SMALL CELL

TEMS, 4G, VOLTE, VOIP, NOC, SITE AUDITS, FIBER, LMR

WORK HISTORY:

NATIONAL CELL SITE CONSTRUCTION MANAGER (ALU/SPRINT) JAN. 2013-DEC. 2014

MPI INDUSTRIES, LLC – BOSTON, MA, REMOTE WORK FROM HOME IN GA

• Responsible for the overall planning, budgeting, and document keeping aspects of the cell site

closeout process for Sprint’s Network Vision and 2.5 Commissioning and Integration Project

• DEVELOPED AND EXECUTED STRATEGIC PLANS IN ORDER TO ENSURE THAT QUALITY COP (CLOSE OUT PACKAGES) WERE

DELIVERED

• EXTENSIVE KNOWLEDGE OF SPRINT’S SITERRA AND ART TOOL DATABASES

• WORKED CLOSELY WITH UPPER MANAGEMENT TO MAKE SURE THAT THE SCOPE AND THE DIRECTION OF OUR PROJECT WAS

ON SCHEDULE

• PROJECT BUDGETED AT 300M

• ASSISTED ALU FINANCIAL TEAM EACH MONTH WITH MANAGING BILLING AND RECEIVABLES, ALONG WITH PROCESSING

SAF

VENDOR SUBMITTED

• IDENTIFIED THAT ALL OOS SUBMITTED INVOICING WAS CORRECT AND APPROVED

• MANAGED TIGER TEAMS ON BLITZ CLEANUP PROJECT

• TRAINED FIELD CMS AND GC ON THE PROCESSES INVOLVED IN COMPLETING CLOSEOUT PACKAGES

• HELD QUARTERLY SAFETY AND QUALITY MEETINGS FOR THE NE REGION.

• CONDUCTED WEEKLY MEETINGS WITH PROJECT TEAM TO DISCUSS CHANGE ORDER REQUESTS, QUALITY ISSUES, AND ANY

RISKS, ASSUMPTIONS OR CONSTRAINTS IN REGARDS TO THE PROJECT

• BUILT STRONG SOLID WORK RELATIONSHIPS BY PROVIDING TIMELY, ACCURATE, AND HIGH QUALITY INFORMATION TO OUR

CUSTOMER AND UPPER MANAGEMENT

• REVIEWED AS-BUILT/RED-LINED CD’S AS NEEDED

FIELD CELL SITE CONSTRUCTION MANAGER (ALU/CSPIRE) MAY 2012-JAN.2013

MPI INDUSTRIES, LLC – JACKSON, MS AND BILOXI, MS

• SCHEDULED PRE-CONSTRUCTION SITE WALKS WITH GC’S TO IDENTIFY ANY PRE-EXISTING CONDITIONS PRIOR TO

CONSTRUCTION START

• HELD SAFETY MEETINGS, INSPECTED ALL PERMITS, AND MADE SURE THAT ALL EQUIPMENT USED ON THE TOWERS WERE IN

PROPER WORKING CONDITION

• SIGN COMPLETED JSA FORMS

• ATTENDED DAILY MARKET CALLS WITH ALU MARKET LEAD FOR SITE CONSTRUCTION STATUSES AND SAP APPROVALS

• OBTAINED ANY SPECIAL PERMITS/CLEARANCES NEEDED TO GAIN ACCESS TO GOVERNMENT RESTRICTED AREAS

• CREATED BOM’S ( BILL OF MATERIALS) FOR EACH NEW CELL SITE AND UPLOADED PDF TO FST

• REVIEWED ALL CLOSEOUT DOCUMENTS AND PHOTOS

• INFORMED RF TEAM OF ANY NEED CHANGES TO BE MADE TO THE SITE’S RFDS

• SCHEDULED POST-CONSTRUCTION SITE WALKS WITH GC, SIGNED ANY RED-LINED CD’S

COMMISSIONING ENGINEER/TEAM LEAD MAR.2012-MAY 2012

NEW WORLD TECHNOLOGY, INC. – DALLAS, TX

• NSN (NOKIA SIEMENS NETWORK) FLEXISWAP PROJECT

• PREFORMED INSTALLATION, COMMISSIONING, AND INTEGRATION OF NOKIA FLEXIBTS

• SOFTWARE AND HARDWARE UPGRADES

• CLEARED ON-SITE ALARMS

• MONITORED ANRITSU SWEEPS TESTING FOR VSWR, RETURN LOSS, AND DTF

• PERFORM FUNCTIONALITY TESTS (VIDEO CALLS, MMS)

• SITE ACCEPTANCE

Dec.2011-Mar.2012

CONSTRUCTION MANAGER (ERICSSON/T-MOBILE/CLARO)

Tangent International – San Juan, PR

• Supervised equipment delivery and installation

• Antenna and RRU swaps

• Integrated 1st and 2nd carrier UMTS equipment

• Coordinated the day-to-day activities of both the contractors and the vendors while they finished up

final punch lists and site walks

• QC/QA

• Maintenance window site cut-overs

Field Test Supervisor (Ericsson/AT&T)

ASTRON CONSULTING – NEW YORK CITY AND THE SURROUNDING BOROUGHS, NY JAN. 2011-JULY 2011

• FOLLOWED ERICSSON MOPS, TEST PLANS

• INSTALLED RAX/TX60 BOARDS INTO 3206 UMTS CABINETS ALONG WITH 2 ND

CARRIER RADIOS AND FILTERS

• REPOSITIONED RF LTE JUMPERS

• INSTALLED SIAD, MU, FIBER, GPS AND GPS RECEIVERS

• EMAS, SITE HANDLER, DAM, DUL SCRIPTING

NETWORK INTEGRATION CARRIER ADD ENGINEER (ERICSSON/TMO) JULY 2010-JAN 2011

AVENGER ENGINEERING – BILOXI, MS

• INTEGRATED BOTH 1 2 UMTS 3206 CABINETS

ST ND

AND CARRIER

• INSTALLED RAX/TX60 CARDS FOR NATIONWIDE LTE UPGRADE

• PROVIDED DETAILED DRAWING OF ALL THE OTHER CARRIERS IN THE CELL SITE COMPOUND

• TOOK PRE AND POST INSTALL PHOTOS IF THE EQUIPMENT AND THE COMPOUND

MICROWAVE PATHING TECHNICIAN (NEW WORLD TECHNOLOGY/CLEARWIRE) FEB.2009-MAR.2010

TEKSYSTEMS – GREENSBORO, HIGH POINT, WINSTON SALEM, NC

• RESPONSIBLE FOR THE INSTALLATION AND PROGRAMMING OF DRAGONWAVE’S HORIZON DUO MODEM, CERAGON

MODEM, ORTHOGONS, PTP600/400 MICROWAVE EQUIPMENT

• RAN -48V POWER CABLES FROM BREAKER BOX TO THE EQUIPMENT CABINET

• CLEARED TROUBLE TICKETS DURING THE MAINTENANCE WINDOW WITH THE NOC

• LOADED SCRIPTS CONTAINING FREQUENCY, CAPACITY, AND TX POWER INFORMATION

• ACHIEVED TARGET RSL LEVELS THAT WERE WITHIN A -2DBM ERROR MARGIN

• WORKED WITH COMMISSIONING TEAM TO BRING NEW SITE BUILD ON AIR

• CPP CERTIFIED

• PROVIDED CUSTOMER SUPPORT BY GOING OUT ON TRUCK ROLLS TROUBLESHOOT CLEARWIRE MODEM ISSUES

SWITCH SITE AUDITOR (BRIDGE NETWORKS/SPRINT) APR.2008-JAN.2009

TEKSYSTEMS – CHARLOTTE, NC AND NORFOLK VA

• PERFORMED SWITCH AUDIT ON ALL CONNECTED EQUIPMENT

• RESPONSIBLE FOR LOCATING DSX1/DSX3/ODX

AND DOCUMENTS ALL BAY POSITIONS ALONG WITH

LEC/MANRING LOCATIONS

• INPUT RELAY RACK, PATCH PANEL, AND PORT LOCATIONS OF THE EQUIPMENT ASSOCIATED WITH THAT SWITCH

• DOCUMENTED ALL OC3/OC12 MOTOROLA INFORMATION

• T1 AGGREGATORS

• SPM, VPU, MGX, DTC, VM NORTEL

• GATHERED ALL ONSITE INFORMATION AND CREATED A PLAN THAT WOULD ENSURE THAT THE SWITCH WAS ENERGY

EFFICIENT

EDUCATION:

SURRY CENTRAL HIGH SCHOOL – DIPLOMA 2002

10+ YEARS OF TELECOM EXPERIENCE IN VARIOUS ROLES

CERTIFICATIONS:

CPR

CPP CONNECTORS

ERICSSON HS1/B3

REFERENCES:

AVAILABLE UPON REQUEST



Contact this candidate