Post Job Free

Resume

Sign in

Project Control

Location:
Batam City, Riau Islands, Indonesia
Posted:
April 18, 2015

Contact this candidate

Resume:

ABDUL RACHMAN

Perum Barcelona Residence Blok E No1,

Belian-Batam Kota,

Batam Kepulauan Riau,

INDONESIA,

Post code: 29464

Pasport No: A 6148836

Mobile Phone: +628**********(Indonesia)

+628**********(Indonesia)

aco803@r.postjobfree.com

aco803@r.postjobfree.com

abdul

Top of Form

Bottom of Form

PROFILE:

Current Position:

Dimensional Control Surveyor

Sector:

Operating/Oil Company

Age/Experience:

37/10

Career Level:

Experienced

Current Location:

Kepulauan Riau, INDONESIA

Nationality:

INDONESIAN

Authorised to work in:

Any

Highest Qualification:

Professional Education of Land Surveying ( With Certificate )

Summary:

For the last three years I have been working for Surveying companies involved in piping and structural dimensional control.

This allowed me to gain some knowledge within Oil and Gas Industry and encouraged me to go forward and develop my skills in this field. That is what I believe I would be given working for your department.

My background and experiences which are ten years working onshore on various platforms for different clients and knowledge of many programs supporting design and dimensional control of piping and structural will help me be an asset to your company.

Skills:

Dimensional Inspection, Able to work under pressure, Team Work, Willing to learn, Willing to travel, Autocad 2D&3D, Computer skills, Communication skills,MS OFFICE,Best Fit Software,MK3B Software, Quality Control, and Equipment of surveying: T0,T1,T2,T16, Automatic level,Total station (Leica TC 1600,Leica TC 1100,Leica TCRA 1103,Leica TS 09Plus,Leica TS30, Sokkia Set330R,Sokkia Set530RK,DTM Nikon 352,DTM Nikon 332 and 352).

Skill information above may not be complete. (For further details see full CV/Resume below)

CURRICULUM VITAE

PERSONAL DATA:

* NAME : ABDUL RACHMAN

* PLACE/DATE OF BIRTH : Manggar,24th April 1977

* NATIONALITY : Indonesia

* MARRITAL STATUS : Married

* PHONE NUMBER : +628**********

* Primary E-mail : aco803@r.postjobfree.com

EDUCATION:

1995 – 1996 : PAT BANDUNG-Bandung,Indonesia (Professional Education of Land Surveying)

1993 – 1995 : STM Negeri – Bangka,Indonesia (Technical Senior High School)

1990 - 1993 : MTS Negeri Manggar – Belitung,Indonesia (Junior High School)

1984 - 1990 : SD Negeri Manggar - Belitung,Indonesia (Elementary School)

TRAINING/COURSE:

1. Five day Safety Induction, Conducted by PT.Mc Dermott Indonesia (2002)

2. Heavy Equipment Course, Conducted by BLIP-BANDUNG (1998)

3. One day Safety Induction, Conducted by PT. Mc Dermott Indonesia (2005)

4. One day Safety Induction, Conducted by PT.SMOE INDONESIA (2006)

5. One day Safety Induction, Conducted by PT.Sempec Indonesia (2006)

6. One day Safety induction, Conducted by Kencana Hl Sdn Bhd (2007)

7. One day Confined Space Training, Conducted by Kencana Hl Sdn Bhd (2010)

8. Three days Safety Induction, Conducted by PT. Mc Dermott Indonesia (2011)

9. One day IIF Training, Conducted by PT. Mc Dermott Indonesia and TEAM Gorgon (2011)

10. One day Basic Sea Survival Training, Conducted by Transafe (2014)

INTEREST : Travelling, outbond avtivities, Sport and reading.

WORKING EXPERIENCES:

* September 2014 to March 2015 :PT.EXPLORA PRIMA

Position :Dimensional Control Surveyor

Responsibilities:

• To provide dimensional control services to the end client, BECHTEL. The project is to Fabricate PARs for onshore LNG plant at Onslow,WA- Australia, and good dimensional control is required to ensure correct placement of these module on site and that piping interfaces are in correct location to allow “single weld hook up” when the modules are placed in position.

PROJECT ASSIGNED:

* PROJECT :Fab Of PAR’s for WHEATSTONE Project-LNG PLANT

CLIENT :Chevron Australia PTY.LTD

CONTRACTOR :BAM CLOUGH

SUB CONTRACTOR :PT.Mc Connell Dowell Services-Batam.

* September 2014 to September 2014 :PT. BLUE OCEAN SERVICE

Position :Dimensional Control Surveyor

Responsibilities:

• To provide dimensional control services to the end client, PERTAMINA PHE WMO. The project is to Dimensional Check of Verticality and Levelness of PHE-38A for offshore Platform on Sea Madura,East Java-Indonesia.

PROJECT ASSIGNED:

* PROJECT :PHE-38A

CLIENT :PERTAMINA PHE WMO

* December 2011 to May 2014 :FUGRO Spatial Solution PTY.LTD

Position :Dimensional Control Surveyor

Responsibilities:

• To provide dimensional control services to the end client, KJV Gorgon. The project is to Fabricate PARs and PAUs for onshore LNG plant on Barrow Island, Australia, and good dimensional control is required to ensure correct placement of these module on site and that piping interfaces are in correct location to allow “single weld hook up” when the modules are placed in position on Barrow Island

PROJECT ASSIGNED:

* PROJECT :Fab Of PAR’s And PAU’s for GORGON Project-Barrow Island LNG PLANT

CLIENT :Chevron Australia PTY.LTD

CONTRACTOR :KJV Gorgon

SUB CONTRACTOR :PT.Mc Dermott Indonesia-Batam

* November 2009 to November 2011 :Kencana Petroleum - Malaysia

Position :Dimensional Control Surveyor

Responsibilities:

• To carry out all mandatory checks and verifications on dimension and leveling, alignment and straightness of platform fabricated during relevant stages of fabrication and erection as directed.

• Perform dimensional survey upon fit-up and subsequent after welding for primary structures of jacket and deck (offshore platform).

• Verify that jacket and deck legs are correctly laid out.

• Issue Acceptance/Rejection surveillance reports C/W sketch reflecting actual dimensions against approved engineering drawings and allowable tolerances as stipulated in client specifications or codes/standards.

• Liaise with Production to ensure that all critical work points per engineering drawing are fully adhered to and maintained.

• Ensure all precision surveillance instruments are calibrated, handled with care and properly maintained and stored in a suitable manner.

• Maintain record related work.

PROJECT ASSIGNED:

* PROJECT :FABRICATION OF BERANTAI TOPSIDE AND JACKET PROJECT

CLIENT :PETROPAC ENERGY DEVELOPMENT INTERNATIONAL LIMITED

* PROJECT :FABRICATION OF DEEN DAYAL FIELD DEVELOPMENT PROJECT WELL HEAD PLATFORM DDW-1 (JACKET 6 LEGS)

CONTRACTOR :LARSEN & TOUBRO,LTD

CLIENT :Gujarat State Petroleum, Corporation Ltd Gandhi Nagar ( GSPC )

* PROJECT :FABRICATION OF 04 WELL PLATFORM FOR MHN RE-DEVELOPMENT PROJECT ( JACKET )

CONTRACTOR :LARSEN & TOUBRO,LTD

CLIENT :Oil And Natural Gas Corporation Limited, India (ONGC)

* PROJECT :FABRICATION SERVICES OF INITIATION/RESTRAINT PILES FOR GUMUSUT KAKAP PROJECT

CONTRACTOR :SAFURA ACERGY SDN BHD ( SASB )

CLIENT :Sabah Shell Petroleum Company,Ltd ( SSPC )

* PROJECT :FABRICATION SERVICES OF FPS AND FLR ANODE RING/CHAIN TABLE FOR GUMUSUT KAKAP PROJECT

CONTRACTOR :SAFURA ACERGY SDN BHD ( SASB )

CLIENT :Sabah Shell Petroleum Company,Ltd ( SSPC )

* PROJECT :FABRICATION OF ICP-R & ICP-F3 JACKET AND PILES

CONTRACTOR :AFCON-GUNANUSA JOINT VENTURE

CLIENT :Oil And Natural Gas Corporation Limited, India (ONGC)

* PROJECT :CILI PADI GAS FIELD DEVELOPMENT PROJECT CONSTRUCTION OF F28DR- A-TOPSIDE

CLIENT :Sarawak Shell Berhad Shell Oil and Gas ( Malaysia ) LLC

* PROJECT :CILI PADI GAS FIELD DEVELOPMENT PROJECT CONSTRUCTION OF CPDR-A TOPSIDE

CLIENT :Sarawak Shell Berhad Shell Oil and Gas ( Malaysia ) LLC

* PROJECT :FABRICATION OF SERAMPANG-A (SEPA) PRODUCTION TOPSIDE FACILITIES PHASE 1 SK-309/SK-311 sSARAWAK GAS DEVELOPMENT PROJECT

CLIENT :Murphy Sarawak Oil Co,Ltd

* July 2007 to September 2009 :CTN MEGAH ( ManPower Supplies)

Location : Kencana HL SDN BHD - Malaysia

Position : Dimensional Control Surveyor

PROJECT ASSIGNED:

* PROJECT :PROCUREMENT AND CONSTRUCTION (PC) OF KINABALU DRILLING JACKET PLATFORM C (KNJT-C) TOPSIDE AND JACKET FOR KINABALU NON-ASSOCIATED GAS (NAG) DEVELOPMENT PROJECT

CLIENT :Petronas Carigali Sdn.Bhd

* PROJECT :FABRICATION OF D30 & DANA WELLHEAD SUPPORT FRAME (WHSF) AND D35 DECK EXTENSION AND PIPELINE AND MANIFOLD (PLEM) FOR D1 CLUSTER DEVELOPMENT PROJECT (TOPSIDE AND JACKET)

CLIENT :PCPP Operating Company Sdn.Bhd

* PROJECT :TANGGA BARAT DRILLING RISER PLATFORM (TBDR-A) TOPSIDE AND JACKET FOR TANGGA BARAT CLUSTER DEVELOPMENT PROJECT

CLIENT :Petronas Carigali Sdn.Bhd

* PROJECT :FABRICATION OF OFFSHORE PLATFORM TOPSIDE FACILITIES AND LINK BRIDGE OF SK-309/SK-311 PHASE I GAS DEVELOPMENT PROJECT GOPA AND GOPB TOPSIDE

CLIENT :Murphy Sarawak Oil Co.Ltd

* PROJECT :FABRICATION OF JACKET AND TOPSIDE WELLHEAD PLATFORM (EPCC) FOR J4 FIELD DEVELOPMENT PROJECT

CLIENT :Petronas Carigali Sdn.Bhd

* PROJECT :HEERA REDEVELOPMENT PROJECT HI/HJ/HSC/B134A,(JACKET AND TOPSIDE)

CONTRACTOR :PT.SEMPEC INDONESIA-A PUNJ LLOYD COMPANY

CLIENT :Oil And Natural Gas Corporation Limited, India (ONGC)

* PROJECT :FABRICATION OF SUBSTRUCTURE OF PHASE 1 SK-309/SK-311 GAS DEVELOPMENT PROJECT. (JACKET GOPA,GOPB,GORA,SEPA, MEPA AND NEW PLEM )

CLIENT :Murphy Sarawak Oil Co.Ltd

* October 2006 to December 2006 : PT. YOOA-KORIN INDONESIA

Position : Dimensional Control Surveyor

Responsibilities:

• To carry out all mandatory checks and verifications on dimension and leveling, alignment and straightness of platform fabricated during relevant stages of fabrication and erection as directed.

• Perform dimensional survey upon fit-up and subsequent after welding for primary structures of jacket and deck (offshore platform).

• Issue Acceptance/Rejection surveillance reports C/W sketch reflecting actual dimensions against approved engineering drawings and allowable tolerances as stipulated in client specifications or codes/standards.

PROJECT ASSIGNED:

* PROJECT : KDC PPP EPC PROJECT,JACKET.

MAIN CONT : PT.SEMPEC INDONESIA

CLIENT : Korea Development Company,Ltd

* June 2006 to September 2006 : PT. SMOE INDONESIA

Location : Batam - Indonesia

Position : Dimensional Control Surveyor

Responsibilities:

• To carry out all mandatory checks and verifications on dimension and leveling, alignment and straightness of platform fabricated during relevant stages of fabrication and erection as directed.

• Perform dimensional survey upon fit-up and subsequent after welding for primary structures of jacket and deck (offshore platform).

• Issue Acceptance/Rejection surveillance reports C/W sketch reflecting actual dimensions against approved engineering drawings and allowable tolerances as stipulated in client specifications or codes/standards.

PROJECT ASSIGNED:

* PROJECT :KERISI-WHP DEVELOPMENT TOPSIDE PROJECT

CLIENT :Conoco Philips Ind Inc ltd

* August 2005 to June 2006 : PT. Mc DERMOTT INDONESIA

Location : Batam-Indonesia

Position : Dimensional Control Surveyor

Responsibilities:

• To carry out all mandatory checks and verifications on dimension and leveling, alignment and straightness of platform fabricated during relevant stages of fabrication and erection as directed.

• Perform dimensional survey upon fit-up and subsequent after welding for primary structures of jacket and deck (offshore platform).

• Issue Acceptance/Rejection surveillance reports C/W sketch reflecting actual dimensions against approved engineering drawings and allowable tolerances as stipulated in client specifications or codes/standards.

PROJECT ASSIGNED

* PROJECT :WEST BERANI,Pontoon Project Keppel Fels Ltd

CLIENT :Keppel Fels,Ltd

* PTTEP ARTHIT FIELD DEVELOPMENT – Process Platform

* WOODSIDE ENERGY Ltd,NWS LNG Phase V PROJECT

* March 2002 to May 2004 : PT. Mc DERMOTT INDONESIA

Location : Batam-Indonesia

Position : Dimensional Control Surveyor

Responsibilities:

• To carry out all mandatory checks and verifications on dimension and leveling, alignment and straightness of platform fabricated during relevant stages of fabrication and erection as directed.

• Perform dimensional survey upon fit-up and subsequent after welding for primary structures of jacket and deck (offshore platform).

• Issue Acceptance/Rejection surveillance reports C/W sketch reflecting actual dimensions against approved engineering drawings and allowable tolerances as stipulated in client specifications or codes/standards.

PROJECT ASSIGNED:

* MAERSK OLIE DG GAS AS PROJECT.

DAN FG Field Development,Jacket.

* FPSO PROJECT CONOCO BELANAK INDONESIA MODULE IN HULL

* DOMINION SPAR HULL. Mississippi Canyon 773.

* WELLHEAD PLATFORM “ A “ CONOCO INDONESIA INC

Belanak field development. Jacket & Topside.

* WELLHEAD PLATFORM “ B “ CONOCO INDONESIA INC.

Belanak field development. Jacket & Topside.

REFERENCES:

1. Mr. Jon Indra ( DC Superintendent ) E-mail:aco803@r.postjobfree.com

2. Mr.Yuda Raharja( Snr DC Surveyor ) E-mail:aco803@r.postjobfree.com

3. Mr.Syed Mohd Azahar ( Lead DC Surveyor ) E-mail:aco803@r.postjobfree.com

4. Mr.Nugroho ( Snr DC Surveyor ) E-mail: aco803@r.postjobfree.com

5. Mr. Akhmad Haeruddin ( Snr DC Surveyor ) E-mail: aco803@r.postjobfree.com

6. Mr. Ritchie Mulholland (FSS Dc Manager) E-mail: aco803@r.postjobfree.com

7. Mr.Greg Richard (Snr DC Surveyor ) E-mail: aco803@r.postjobfree.com

I declare the details stated to be true and completed.

Batam,24th March 2015

Yours truly,

ABDUL RACHMAN

CV of ABDUL RACHMAN



Contact this candidate