Post Job Free

Resume

Sign in

Project management and process improvement engineer

Location:
Houston, TX
Posted:
April 16, 2015

Contact this candidate

Resume:

Ahmid

D. Bullock

Citizenship: U.S.

aco74w@r.postjobfree.com

Phone: 516-***-****

**** *** **** **. ***. 2029 Houston, TX 77063

PROFESSIONAL SKILLS:

. Project Management- Lean / Six Sigma Project Lead, FMEA, Value Stream

Mapping, 5S, Kaizen.

. Technical writing- Vendor contracts, engineering specifications,

facility/equipment modification plans.

. CAD- AutoCAD, EM-Engineer, Mastercam, Catia, Autodesk Inventor, U.G.

4.03, Basic GD&T.

. Quality Cont Lead Inspector- dye penatrent, ultrasonic, mag. particle,

sheer stress, and torsional load.

. Statistical Analysis- O.E.E. calculation, Arena Simulation, Maple, Lindo,

EPIP, SPSS, Mini Tab.

. ENG. Operations. - SAP, Tops3, DART, Compas, GE Parts Pro, Sampro,

Oracle, Java coding.

. Microsoft- Excel, Visio, PowerPoint, Word, Project, Access, Outlook, Net

meeting.

EXPERIENCE:

Pacific Drilling 10/12-

Present

P.D.C. Houston, TX

- Project Manager / Project engineer

. Accomplishments include managing a select group of project work scopes

involving software and mechanical installations aboard offshore

drilling vessels to bring Dual Gradient Drilling technology to

functional readiness. My key management areas are mechanical and

piping system installation projects, including engineering evaluation

of related drawings, review and selection of resources, cost control,

scheduling and motivating project teams to successfully meet

milestones. This is done while liaising between PDC, Chevron, the rig,

and suppliers, effectively communicating with all parties to create a

detailed plan to support a safe and timely project implementation and

commissioning.

. Prior undertakings include managing fleet wide process improvement

initiatives including seawater pump filtration failure analysis and

modifications, waste water gravity filtration system feasibility study

and creation of installation plans to increase operational efficiency,

as well as managing various hull and cabin storage and safety

improvement projects.

. Managing the sourcing of project specific materials and resources as

well as supplier performance tracking. Creating and updating project

and procurement databases to increase effectiveness.

. Conducting failure analysis studies in the field and compiling test

results in a manner useful for training material for preventive

actions on other vessels and presentation to upper management.

. Creating process standards for engineering change operations and

technical documentation.

Vallourec & Mannesmann 11/10- 10/12

VAM Drilling USA, Houston, TX

- Project manager / Process Improvement Engineer

. Managing capital expenditure (CAPEX) project teams budgeted from $65-

600K at all stages including initial specification writing, vender

technical meetings and quote negotiation.

. Leading continuous improvement project teams reducing non-value added

time, implementing new manufacturing equipment, and testing and

qualifying new drill pipe manufacturing processes.

. Conducting testing and qualification of pre-commissioned equipment at

suppliers to assure compliance with acceptance criteria, and

international best practice sharing with sister companies.

. Writing technical specifications including CAD designs for facility

modifications, material-handling systems, and new manufacturing

equipment / process changes to increase production efficiency.

. Implemented O.E.E. in manufacturing work cells focused on tracking and

improving quality, availability, performance, and trained 38 operators

to track and report the O.E.E. data. This tool helped close a

communication gap between the shop floor and upper management.

Schlumberger 11/08- 11/10

Oil Field Completions Technology Center, Rosharon, TX

-Manufacturing Engineer

. Led kaizen events relocating several manufacturing work cells to meet

future capacity and logistical needs using CAD and lean manufacturing

principles to optimize the transition.

. Drove continuous improvement initiatives / cost savings through the

application of Lean Six Sigma Manufacturing techniques such as

reducing non-value added time, 5S, Error-proofing, and standard

operations saving more than $1.5M.

. Created and presented new product (NPD) commercialization plans

covering cost, lead-time, field test results, potential field markets,

and manufacturing feasibility.

. Final drawing and design review for manufacturing feasibility of new

products and altered existing designs, including Schlumberger's first

round of GD&T tolerance drawings.

. Manage a CAD designer and two assembly / testing technicians producing

$14M/yr in revenue while closely supporting the supply chain team.

General Electric 7/04 - 11/08

G.E. TURBINE REPAIR CENTER, Houston, TX

-Lead Engineer

. Researching, testing and implementing several pat. pend. brazing

compounds, ceramic gating, and EDM techniques for thin alloy turbine

components.

. Fielded engineering related requests from customers and G.E.

facilities on a global base and assured all serviced combustion

hardware met Engineering Specifications.

. Directed Lean events, reducing production cycle-time by 12%, and

trained 2 facilities in proper quality inspection procedures.

. Design of several tools and fixtures in CAD working directly with the

machining center to meet in house productivity and ergonomic needs.

. Led the inspection of turbine hot side components and created repair

plans consisting of work instructions for TIG welding, brazing, heat

treatment, and thermal coating procedures.

. Trained and mentored 9 interns a year in inspection procedures and

lean manufacturing techniques.

G.E AIRCRAFT SYSTEMS / LOCKHEED MARTIN, Middle River, MD

-Lean Leader / Composite Bonding Supervisor

. Orchestrated the final production of all bonded thrust reverser

components.

. Supervised 45 operators, in a union environment, that performed

autoclave cure, hand routing, CNC machining, and assembly operations.

. Lean initiatives consisted of conducting Kaizen events and balancing

production to an expedited Takt time. Also creating a bus schedule for

tools requiring batch processing, maximizing proper autoclave load

density, reducing tool change over and cycle time.

-Engineer

. Conducted in-depth time studies on the shop floor and implemented lean

manufacturing principles, such as value stream mapping, 5s, and work

cell design, ultimately reducing non-value added time and increasing

work cell efficiency

. Designed 3D tool prototypes in CAD.

. Design of a patented tool for indicating the locking rings of the trident

missile.

. Received Lean Six Sigma / Project Management training from G.E. and The

Shingijitsu Corp.

HONORS & ACTIVITIES:

2009 - Schlumberger Six Sigma Green belt Certified 2009 -

ATF explosives clearance

2007 - Project Manager + Risk Analyst

2007 - Houston G.E. EPIP Coordinator

2006 - G.E. Six Sigma Green belt Certified

2007 - G.E. Quality M.S. Certified

2004 - Design of patented tool for Trident Missile 2005

- S.M.E. Lean Manufacturing Certified

TRAINING & EDUCATION:

2/13 - 3/13

. Pacific Drilling - Drilling vessel thruster dynamic positioning

training

1/11 - 1/12

. Vallourec & Mannesmann - Project management training

6/08 - 1/09

. Schlumberger - Six Sigma Green belt certification

1/08 - 2/08

. G.E.- New Managers Business Leadership Training

4/06 - 12/06

. -G.E.- Six Sigma Green belt certification training

9/01 - 5/05

. MORGAN STATE UNIVERSITY- B.S., Industrial and Manufacturing

Engineering (2005)



Contact this candidate