Post Job Free

Resume

Sign in

INSTRUMENT TECHNICIAN

Location:
Patna, BR, India
Posted:
April 11, 2015

Contact this candidate

Resume:

CURRICULUM VITAE

MONAZIR HUSSAIN

C/O JHUNNU HARDWEAR STORE

CHAURAHA MASJID ROAD

PHULWARI SHARIF

DISTT: PATNA 801505 (BIHAR)

Mob:-+919*********/+919*********

Email:-aco41n@r.postjobfree.com

Email:-aco41n@r.postjobfree.com

POST APPLIED FOR: - INSTRUMENT TECHNICIAN

OBJECTIVE

To understand the working environment and enhance the various skills and to

be a credential

Part by giving my trustworthiness, devotion and contribution towards an

organization.

EDUCATIONAL QUALIFICATION

S.S.C from Government of B.S.E.B in the year of 1999.

TECHNICAL QAULIFICATION

DIPLOMA IN INSTRUMENTTATION FROM BHAGALPUR ENGINEERING COLLAGE

BIHAR 2003.

EMPLOYMENT HISTORY

Having more than 8th year's Construction and Maintenance experience in Oil

& Gas Refinery,

Petrochemical, Construction, & Maintenance Commissioning Overhauling, and

Shutdown, Worked

As an Instrument Technician.

EXPERIENCE IN ABROAD

Organization Sharq 3rd Expansion Polyethylene Sabic

Saudi Arabia Kentz Co Ltd

Position Instrument Technician from Feb

2007 to April 2009

Organization Ibn zhar Co. Saudi European

Petrochemical Co. (Jubail)

Position Instrument Technician from 15th

Feb2007 to 20th Jun 2007

EXPERIENCE IN INDIA

Organization : Competent Instrumentations

(Engineers Contractors)

Position : Instrument Technician from

18th July 2013 to 3rd Feb 2015.

Organization : Ani Instrument Services Co.

Position : Instrument Technician from

24th Nov 2009 to 21st Sep 2012

Organization : I.O.C.L Refinery Barouni (Bihar)

Amar Construction Co Pvt ltd.

Position : Instrument Technician from

18th Oct 2004 to 30th Dec2006

JOB RESPONSIBILITIES HANDLED

Final loop check & functional check responsibility with client.

Responsible to see that the assigned job timely completed as per the

project time schedule.

Red linings the drawing termination schedules, instrument loop diagram

(ILD) data sheets and logic

Diagram etc. as per modification made on site Arrange for work permit for

work Inspection to be carried

Out in areas that are under commissioning department.

Instrument bench calibration according to project spec & implementing

approved (ITP) Inspection & Testing plant.

Also involved in Corrective and preventive Maintenance of Instruments.

Calibration Loop checking, Troubleshooting, Instrument in Running plant,

All types Instruments-Transmitter, Control valves, Installation, Removing,

etc.

USING OF EQUIPMENT

Hart Communicator Model 375, Milliamp Loop calibrator, Decade Box,

Temperature Bath, Multi function

Calibrator, Milliamp source calibrator, Druck calibrator, Hand Pump,

Minical, Deadweight Tester,

Presser calibrator, Cable check Mager Model Bm 15, Continuity tester, and

Multimeter.

NATURE OF WORK

Calibration knowledge different kind of electronics, pneumatics,

Instrument. Transmitter, Gauges,

Valves, I/P converters, RTD, Thermocouple, Level Transmitter, Instrument as

Well and well familiar of

All kinds of drawing P&ID/ILD/hook-up Bench calibration loop checking

Trouble Shooting all types of

Transmitter & Control valves etc.

Shut down plants, removal of instrument, servicing, replacement and re-

calibration, dismantling &

Reassembling and reinstallation of different kind of instrument. Loop

checking trouble shooting,

Pre-commissioning & commissioning of field instrument, all types of

transmitter control valves &

Bench Calibration loop check experience.

Work handle as an approval drawing layout P&ID, ILD, Panel and J.B. details

and use all

Approval documents etc. Calibration, Pre-Commissioning and Commissioning of

process control

Instrument Including Troubleshooting at Instrument to junction boxes,

Marshalling cabinets and

Final loop Checked of Field to DCS etc.

PLANT MAINTENANCE &TROUBLE SHOOTING ACTIVITY

Plant prevent maintenance activity Obtain a work permit form operation

department.

Visit on the job site area field operator to determine safe work

condition.

Responsible for trouble shooting the problems associated in the

instrument during commissioning.

Discuss with operation and resolve the problems associated with measurement

variables in the relevant

Documents with the process people.

SAFTEY SELF

Running and Construction plant carry on carefully and successfully without

hesitation. I have watching

Ever thing related to the jobs. I give the first priority Safety and

without loss any things

Well aware of the safety rules and regulations according to the industrial

safety.

PERSONAL DETAIL

Name : Monazir

Hussain

Father's Name : Mokarram

Hussain

Date of Birth : 08th August

1985

Place of Birth : Patna

Religion : Muslim

Nationality : Indian

Marital Status : Unmarried

Language Know : English, Urdu,

Hindi

PASSPORT DETAIL

Passport No : F-9214329

Date of Issue : 06/09/2006

Date of Expiry : 05/09/2016

Place of Issue : Patna

DECLARATION

I herby that all the information prouder in my curriculum vitae is

genuine and correct and I am sure

Having given an opportunity to work your organization. I will apply

myself certainly for

The benefit of the organization and achievement of it's over all

objectives.

Place: -

Date: -

Monazir Hussain



Contact this candidate