CURRICULUM VITAE
MONAZIR HUSSAIN
C/O JHUNNU HARDWEAR STORE
CHAURAHA MASJID ROAD
PHULWARI SHARIF
DISTT: PATNA 801505 (BIHAR)
Mob:-+919*********/+919*********
Email:-aco41n@r.postjobfree.com
Email:-aco41n@r.postjobfree.com
POST APPLIED FOR: - INSTRUMENT TECHNICIAN
OBJECTIVE
To understand the working environment and enhance the various skills and to
be a credential
Part by giving my trustworthiness, devotion and contribution towards an
organization.
EDUCATIONAL QUALIFICATION
S.S.C from Government of B.S.E.B in the year of 1999.
TECHNICAL QAULIFICATION
DIPLOMA IN INSTRUMENTTATION FROM BHAGALPUR ENGINEERING COLLAGE
BIHAR 2003.
EMPLOYMENT HISTORY
Having more than 8th year's Construction and Maintenance experience in Oil
& Gas Refinery,
Petrochemical, Construction, & Maintenance Commissioning Overhauling, and
Shutdown, Worked
As an Instrument Technician.
EXPERIENCE IN ABROAD
Organization Sharq 3rd Expansion Polyethylene Sabic
Saudi Arabia Kentz Co Ltd
Position Instrument Technician from Feb
2007 to April 2009
Organization Ibn zhar Co. Saudi European
Petrochemical Co. (Jubail)
Position Instrument Technician from 15th
Feb2007 to 20th Jun 2007
EXPERIENCE IN INDIA
Organization : Competent Instrumentations
(Engineers Contractors)
Position : Instrument Technician from
18th July 2013 to 3rd Feb 2015.
Organization : Ani Instrument Services Co.
Position : Instrument Technician from
24th Nov 2009 to 21st Sep 2012
Organization : I.O.C.L Refinery Barouni (Bihar)
Amar Construction Co Pvt ltd.
Position : Instrument Technician from
18th Oct 2004 to 30th Dec2006
JOB RESPONSIBILITIES HANDLED
Final loop check & functional check responsibility with client.
Responsible to see that the assigned job timely completed as per the
project time schedule.
Red linings the drawing termination schedules, instrument loop diagram
(ILD) data sheets and logic
Diagram etc. as per modification made on site Arrange for work permit for
work Inspection to be carried
Out in areas that are under commissioning department.
Instrument bench calibration according to project spec & implementing
approved (ITP) Inspection & Testing plant.
Also involved in Corrective and preventive Maintenance of Instruments.
Calibration Loop checking, Troubleshooting, Instrument in Running plant,
All types Instruments-Transmitter, Control valves, Installation, Removing,
etc.
USING OF EQUIPMENT
Hart Communicator Model 375, Milliamp Loop calibrator, Decade Box,
Temperature Bath, Multi function
Calibrator, Milliamp source calibrator, Druck calibrator, Hand Pump,
Minical, Deadweight Tester,
Presser calibrator, Cable check Mager Model Bm 15, Continuity tester, and
Multimeter.
NATURE OF WORK
Calibration knowledge different kind of electronics, pneumatics,
Instrument. Transmitter, Gauges,
Valves, I/P converters, RTD, Thermocouple, Level Transmitter, Instrument as
Well and well familiar of
All kinds of drawing P&ID/ILD/hook-up Bench calibration loop checking
Trouble Shooting all types of
Transmitter & Control valves etc.
Shut down plants, removal of instrument, servicing, replacement and re-
calibration, dismantling &
Reassembling and reinstallation of different kind of instrument. Loop
checking trouble shooting,
Pre-commissioning & commissioning of field instrument, all types of
transmitter control valves &
Bench Calibration loop check experience.
Work handle as an approval drawing layout P&ID, ILD, Panel and J.B. details
and use all
Approval documents etc. Calibration, Pre-Commissioning and Commissioning of
process control
Instrument Including Troubleshooting at Instrument to junction boxes,
Marshalling cabinets and
Final loop Checked of Field to DCS etc.
PLANT MAINTENANCE &TROUBLE SHOOTING ACTIVITY
Plant prevent maintenance activity Obtain a work permit form operation
department.
Visit on the job site area field operator to determine safe work
condition.
Responsible for trouble shooting the problems associated in the
instrument during commissioning.
Discuss with operation and resolve the problems associated with measurement
variables in the relevant
Documents with the process people.
SAFTEY SELF
Running and Construction plant carry on carefully and successfully without
hesitation. I have watching
Ever thing related to the jobs. I give the first priority Safety and
without loss any things
Well aware of the safety rules and regulations according to the industrial
safety.
PERSONAL DETAIL
Name : Monazir
Hussain
Father's Name : Mokarram
Hussain
Date of Birth : 08th August
1985
Place of Birth : Patna
Religion : Muslim
Nationality : Indian
Marital Status : Unmarried
Language Know : English, Urdu,
Hindi
PASSPORT DETAIL
Passport No : F-9214329
Date of Issue : 06/09/2006
Date of Expiry : 05/09/2016
Place of Issue : Patna
DECLARATION
I herby that all the information prouder in my curriculum vitae is
genuine and correct and I am sure
Having given an opportunity to work your organization. I will apply
myself certainly for
The benefit of the organization and achievement of it's over all
objectives.
Place: -
Date: -
Monazir Hussain