Eric Petersen

*** ****** **. ******* *******

705-***-**** / acn0rg@r.postjobfree.com

General Construction Project Superintendent

Focus: High Rise Residential Construction & ICI

Over 15 years of industry experience, directing full scope of Construction Projects that

include New Construction, Renovation and Restoration Projects. A Proven Track Record in

Achieving Time, budget and Quality Goals on a Broad Range of Multi-Million Dollar

Projects.

PROJECT MANAGEMENT: A Strong background in supervision of large and complex projects.

Possess knowledge of federal and provincial building practices with a good understanding of

regulatory issues. Qualified to review and evaluate bid documents, estimate costs, chart

projections, write and negotiate contracts, and lead cross functional project teams. Coordinate

effectively with responsible parties regarding guidelines, scope.

RELATIONSHIP DEVELOPMENT: Excellent leadership, communication and relationship building

skills. Work effectively with engineers, architects, client representatives, project management

teams, building officials, contractors and other industry officials. Work jointly with clients and

consultants to review job progress and address any and all outstanding issues: provide the

highest level of service to client and firm, in doing so earned frequent commendations as a result.

Knowledge & Skill Areas

-Commercial/industrial Development - Construction Team Supervision

- Cost & Risk Analysis/Evaluation - Change Orders / Contract negotiations

- Architectural Evaluation & Review - Construction Trade & Practices

- Contractor/Subcontractor Supervision - Team Building, training & Leadership

- Health and Safety review & implementation - Dispute & conflict Mediation/Resolution

- Fluent in Microsoft Office, Project & AutoCAD - Shop Drawing Review & Analysis

Construction & Management Background

Tilt up, Block, Mid & High-Rise, Multi-Use, ICI, Hospitality, Medical, Business Parks, Design

Build, Building envelope, Site Works and Insulated Concrete and Cast in Place Concrete

Experience

Education & Training

- Secondary School Graduate - 3yrs Engineering & Applied Sciences, Queens

Eric Petersen

253 Spruce St. Stayner Ontario

705-***-**** / acn0rg@r.postjobfree.com

- Trowel Trades Gold Certification - Red Seal Certification Carpentry & Applied

- Construction Management George Brown - Heavy Equipment Operators Training

- H&S – Basics of Supervision - First Aid, Fall Arrest, Confined Space, WMIS

- LEED Certified - ICF Trained – Estimation, Design, Installation

Professional Experience

Kappeler Group of Companies - 2011-2014

General Contractor Project Superintendent

Hired to build multi level and family high rises over the duration of my employ. All projects involved

Base building structural concrete, underground parking, all site services including connections,

landscaping and driveways, sidewalks and scheduling of trades.

Selected Projects/Accomplishments;

-197 Albert St. Waterloo 8 Storey residence apartment building, (completed in 7 months)

Base building – ICF and Cast in Place concrete and Core slab Masonry exterior(8M)

-12 Storey Condominiums, Cambridge. (Completed in 14 months)

Base building – ICF and Cast in Place concrete, Core slab and Masonry exterior (27M)

-395 Albert St. Waterloo 5 Storey residence apartment building, (Completed in 8 months)

Base building – Concrete and ICF Foundations and Modular Wood framed structure with Masonry

exterior. (6.6M)

Met time and budgets schedules on all projects.

Retained by the company based on performance and effort despite widespread layoffs for much of

the industry ; earned excellent recommendations from owner and consultant for future

employment

Identified multiple issues with architectural drawings with the building envelope and suite layouts

by issuing RFCN based on my recommendations.

Eric Petersen

253 Spruce St. Stayner Ontario

705-***-**** / acn0rg@r.postjobfree.com

Harvis Barklay Consulting Inc. 2011 -2012

General Contractor Project Superintendent

Hired and invested in the building and managing of all on site construction needs for 8600 SF

single family dwelling including wood framed base building and all site services including

connections, landscaping and driveways, sidewalks and scheduling of trades.

Selected Projects/Accomplishments;

* 358 Indian Valley Trail, Mississauga – 2 storey wood framed with concrete foundation, partial

natural stone exterior and Board and Batten above. (construction cost per square foot without

property was $330.00)

Met with very few problems on this project other than owner taking to much time in choosing very

high end finishes that generally came from overseas.

Monteith Building Group Inc. 2010- 2011

General Contractor Project Superintendent

Hired on contract to complete a public School project that fell into multiple problems due to issues

ignored and/or misunderstood by previous Site Superintendent. This project was an addition and

renovation to an existing School. I was required to work with Project Management team to fore fill

all construction needs and repairs. Base building of addition was concrete foundations with

Masonry structure and a steel flat roof. built up multi layer hot roofing and sloped insulation. The

renovation had Asbestos removal and demolition and the reworking of masonry walls for new

classroom layouts. Finally the existing Mechanical rooms were to be relocated to new Addition

with all new tie in to old services trunks.

Selected Projects/Accomplishments;

-James St. Public School Addition and Renovation, Orillia (7.8M)

Retained by company to fix, schedule and identify issues ignored by previous super and work

together with consultants and project management teams to correct them. Their or to many to list

but I am going list a couple major issues and effects they had on the project so as to clarify;

Addition was laid out incorrectly by 4.5” or 110mm. Solution was to build extra concrete foundation

wall to the east to rectify this issue. Following this, three structural exterior and interior walls were

removed that were not scheduled for removal and caused significant structural issues that were

resolved by adding several steel columns and beams.

Was asked to remain after project completion but already had new position with another firm and

had committed to it before offer from MBG.

Eric Petersen

253 Spruce St. Stayner Ontario

705-***-**** / acn0rg@r.postjobfree.com

Outcome of project after my commencement of duties was that the project actually was finished

on time to allow students to attend and recaptured $145,000.00 of budget due to previous issues.

Paramount Group 2001-2010

General Contractor Project Superintendent/Project Management/General Manager

Was originally hired by this firm as a masonry foremen, but after 2 years was moved to their

General Construction Division. During the next 4-5 years I as a project superintendent completed

multiple projects from schools and additions to waste water treatments and commercial building.

The following years I was then promoted to Company General Manager with dozens of additional

tasks to complete: Estimation, Field supervision, Office management and staffing, Accounting and

finally union negotiations.

As there is so many projects that I had completed with this firm, I am going to list several for them

with their values and construction methods;

Cont’d

-Alcona Glen P.S. Innisfil ON

Base Building was 2 storey Masonry Structure With Flat built up roofing. (11.3M)

-Nantyr Shores S.S.

Base Building was 3 storey Masonry Structure With Flat built up roofing. (19.8M) –

-Sutton District Water Pollution Control Facility

Multi building and purification facility. (22M)

-Monte Carlo Inn, Barrie ON

Base Building was 5 storey Masonry Structure With Steel Pitched Roof. (6.8M)

-Kirland Lake Dry Gold Mining Buildings

Multi Building and new Mining shaft With steel structure and Siding (4.6M)

-North Bay Forensic Identification Facility

Base Building was 2 storey Masonry Structure With Flat built up roofing. (11.3M)

-Monte Carlo Inn, Brampton

Eric Petersen

253 Spruce St. Stayner Ontario

705-***-**** / acn0rg@r.postjobfree.com

Base Building was 8 storey Masonry Structure With Steel Pitched Roof. (8M)

Atlas Corporation 1994-2001

General Contractor Project Superintendent

Brought on board with this firm to take on the Upper Canada Mall Toys R Us Additions and Interior

Renovations. This project was a very labor intensive project as the existing commercial facility

was to remain in use as the construction process continued. This was an almost 30 million dollar

project and I had to work with two other site superintendents, onsite consultants and inspectors.

Managed numerous factors and challenges on this nearly 30 Million dollar project,

Including working in confined areas, ensure public safety and minimal impact on existing tenants,

overseeing night/weekend/double shifts, coordinating activities with other site superintendents.

Time line and budgets were meet by all teams involved.

References

Gary Kappeler, President, Kappeler Group – 519-***-****

Ronnie Maggar, Project & Construction Manager, SOMA Architects - 519-***-****

Steve Greer, President, Harvis Barklay Consulting, - 416-***-****

Will provide more upon request.



Contact this candidate