Post Job Free

Resume

Sign in

journeyman pipefitter welder

Location:
Fort Payne, AL
Posted:
December 03, 2014

Contact this candidate

Resume:

N ICOLAS ROBISON

J o u r n e y m a n P i p e w e l d e r / f i t t e r .

A D D R E S S : 3 8 6 2 C O . R D . 12 7 F O R T PAY N E A L . 3 5 9 6 7

P H # 2 5 6 9 9 6 418 4 E M A I L : T R U C K I N 8 0 S T Y L E @ YA H O O . C O M

S.S.# 417 29 3115 D.O.B. 11 02 1982

O BJECTIVE

Based on my experience as a pipe fitter/welder and mechanical background

including, but not limited to the installing of new hydraulic and hi pressure steam

lines. Being involved in multiple shutdowns and outages at everything from

nuclear power houses to the smallest paper mill. I would like to obtain a

permanent position with a growing company with opportunity to advance.

SUMMARY OF QUALIFICATIONS

I graduated from Fort Payne High School in 2001 with a general

diploma and an additional technical credit in welding and

agriculture.

Completed my journeyman Pipefitter/steamfitter training in 2008.

Which included welding certifications in tig, stick, and mig.

OSHA 10 hr safety course, that included training on fall protection,

initial opening of systems, ladder safety and the importance of

P.P.E. and its proper use.

8 hr. rigging and crane operation certification thru OSHA and on

the job.

Electrical safety LOTO/live dead live OSHA 40 hr training, this

included circuits and breaker testing on equipment.

40 hr. Blueprint detail and mechanical systems certification. This

included hi pressure pump systems including steam, hydraulic

and water.

I have been involved with many shutdowns and upgrades on

plants. Which has given me invaluable experience.

EMPLOYMENT

Pipefitter/Welder

6-13-13 present Flour Maintance Service

Boiler shutdown at steam generating power plant (coal burner)

4”-- 36” schedule 40 thru xxx heavy wall welds tig root and hot

pass up to ” thickness then fill out with 7018 X-ray

Vessel change out and intake rebuild for old cooling systems

Natural gas change over on unit 1 this included removing all old

coal feed pipe and replacing with natural gas lines to feed boiler

operations

Pipefitter/Welder/Electrician

*-**-**-*-**-** Day and Zimmerman contractors U.S.A.

Steam generator change out for TVA at there Sequoia nuclear

power plant

Glycol chiller modifications for TVA at Sequioa Nuclear

Mechanical outage at Browns Ferry Nuclear

Fire sprinkler upgrade at Sequoia nuclear

Mechanical outage at Browns Ferry Nuclear Power

Pipefitter/Welder

8-1-12 6-1-11 Mc Abee construction

Main feed water pump change out for the Bowater paper mill.

Cleveland TN.

Burner change outs at U.S. Steel Birmingham al.

Hydraulic/Electrical system upgrades at the mead west vaco

paper mill in Phoenix city al.

Pipefitter/Welder

6-1-11 4-12-2008 Flour Maintenance

Jet bubble reactor build at Wilsonville coal burning power plant for

Alabama power in 2008-2010

Boiler upgrades and rebuilds at almost every Alabama power plant

in alabama 2010-2011

Construction of the Mox nuclear bomb facility in savannah ga.

2011

EDUCATION

Fort Payne high school graduated 2001

Completed journeyman training in 2008

Various other training modules throughout my carrier as stated in qualifications.

REFERENCES

Jamie Goodwin fort Payne al. ph# 256-***-**** Goodyear

Wade Colvin Rainbow City AL. ph# 256-***-**** pipe welder/fitter

Michael Hutson Fyffe AL. ph# 256-***-**** Heil



Contact this candidate