Post Job Free

Resume

Sign in

Engineer Power Plant

Location:
Karachi, Sindh, Pakistan
Posted:
November 30, 2014

Contact this candidate

Resume:

MASOOD AHMED

MECHANICAL ENGINEER

B-** MADRAS CO-OPERATIVE HOUSING SOCIETY SECTOR 17/A, SCHEME-33 GULZAR-E-

HIJRI, KARACHI, PAKISTAN.

OBJECTIVE:

To amplify my engineering and managerial skills, exploring new

avenues of knowledge, which would eventually lead me to a post

of high responsibility in a well-reputed organization.

PROFILE:

Key Qualifications:

Mechanical Engineer with more than 31 years of professional

experience in the field of power plant construction, supervision,

project management, erection, testing, commissioning, plant

operation, performance, co-ordinating and managing the staff of

different departments for the rectification of technical

problems. Preparation of technical reports. Particular know how

in all types of boilers (Heavy oil and gas fired), different

types of combustion systems and applicable types of burners. Deep

Experience in water steam cycle and water treatment and flue gas

analysis.

Professional Education:

. B.E. Mechanical Engineering

N.E.D University of Engg. & Technology, Karachi. First

Class 1981

. B.Sc. University of Karachi First Class

1974

PROFESSIONAL

AFFILIATION:

. Professional Engineer (P.E), Affiliated Pakistan

Engineering Council; Mech.3575

Employment Record:

March 2006 Karachi Electric Supply Company Limited (Now is

to 11 May K-Electric),

2014 Deputy General Manager (Operations)

Aug 1994 - Karachi Electric Supply Company Limited (Now is

March 2006 K-Electric),

Operation Engineer

May 1984 - Karachi Electric Supply Company Limited (Now is

Aug 1994 K-Electric),

Assistant Operation Engineer

May 1983 - Karachi Electric Supply Company Limited (Now is

May 1984 K-Electric),

Apprentice Engineer (One year on job training in the

different department(Project, Maintenance and

Operation) of Bin Qasim Thermal Power Station, KESC

Limited (Now is K-Electric)

Relevant Working Experience

March 2006 - Deputy General Manager

11 May 2014

Leading an Operations Shift Team all 6 units of

210MW each (Total 1260 MW) of Bin Qasim Thermal

Power Station, K.E.S.C Ltd (Now is K-Electric

Limited.)

Responsibilities:

Reporting to General Manager Operations responsible

for:

Ensure safe and efficient operation of the Plant and

include responsibility for making accurate and

timely decisions on matters affecting plant

processes and performance.

Operating data analysis & interpretation, Plant

Management System Implementation, Fault Diagnosis of

Plant equipment's of Bin Qasim thermal power plant

210*6=1260 MW

Ensuring that operating procedures are adopted that

optimizes plant lifetime and performance, minimize

downtime and that accommodate planned maintenance

activities.

Playing lead role in Plant O&M during vacations of

Senior

Operation Plant personnel.

Analyzing, interpreting & presenting operating data

of 1260 MW Plant to the top Management for

O&M decision making.

Proposing short term operational measures to

improvement in heat rate / fuel savings.

Collecting plant reports, analyzing abnormalities

determining root cause / maintenance rectification.

Developing operating procedures for guidance of

operation staff

Submitting incident/trip reports and to provide

recommendations.

To records of equipment failures and provide needed

information and data to the Plant Manager

Responding to all station emergencies, like fire,

Loss of Generation/Water production plants, Black

out and any other incidents as per the set

Guidelines.

Ensure compliance of all relevant Heath & Safety

Standards.

Aug 1994 May Operation Engineer

2006 Shift operation Engineer of Two units 2*210=420 MW of

BQPS-1in Fossil power utility and familiarity with

Electrical Network & Equipment at Bin Qasim Thermal

Power Station of Karachi Electric Supply Company Ltd

(Now is K-Electric Limited).

Supervise start up, synchronizing, loading rates,

shutdown of the unit, and handing over for

maintenance requirements.

In case of tripping and other major fault investigate

the cause and to coordinate with maintenance sections

for rectifications of faults

In case of partial or total breakdown of supply, to

restore the station supply in minimum possible time.

Ensure the plant integrity, safety, and commercial

availability at optimum level.

May 1984 Aug Assistant Operation Engineer

1994

Assistant Operation Engineer of 2 units of 210 MW.

Thermal Power Plant at Bin Qasim Thermal Power

station, Karachi Electric Supply Company Ltd (Now is

K-Electric Limited).

. Foreign Technical Training JAPAN (Oct 1990 to Feb

1991)

(4 Months Advance Technical Training in Japan for

Turbine

(Hitachi Works), Boiler (Kure Works) and Pumps

(Torishima

Pumps)

COMMISSIONING EXPOSURE & PROJECT RELATED EXPERIENCE

Worked with consultant M/S Fichther for Hitachi Ltd.

Babcock Werke AG during commissioning and trial run

of all 6 units of 210MW of client Karachi Electric

Supply Company Ltd (Now is K-Electric Limited).

To supervise the erection, testing & commissioning

activities of the contractor. The details of the

work which I have performed are briefly described as

under.

Design, review and approval of mechanical system

drawings and documents submitted by

contractor/manufacture as per project

specifications.

Project Management, Site supervision and

coordination.

Ensure successful completion of the project well in

time.

Monitoring of project, Execution of schedules.

Punch list preparation

Checking of details and drawings for various

equipment and systems submitted by Contractor

Review of commissioning check list submitted by the

manufacture/Contractor

Preparation of erection check list to ensure the

safe and as per specification installation of the

plant equipment with the provision for maintenance

and removal of equipment for overhauling/ Parts

Replacement

Perform inspection of incoming material as per

project requirement

Inspection of in structural fabrication work

according to codes and standards. Possesses Contract

management, client negotiations, and vendor

management skills.

Plant equipment Specification Preparation and

Technical Evaluation.

Power Generation project studies, identifying

rehabilitation requirements of the 1260 MW Station

components, to offset ageing, obsolescence of

equipment in the plant or technological advancements

in the industry. Make & Implement proposals.

1989-1996

Worked as Mechanical Engineer (Commissioning):

As a part of project team took active part in

fraction installation of commissioning of Unit # 3,

4, 5 & 6 at Bin Qasim plant. KESC having 210 MW.

Capacity each 680 t/h MCR, Boiler pressure 140 bar.

Unit 3 & 4, Steam turbine generator and control make

of Hitachi Ansaldo Italy and steam generator of M/S.

Dutch Babcock. Unit # 5,6 of M/S. Marubeni

Corporation.

Involve with contactor and consultant in

installation and commissioning activities HP-LP,

boiler feed pumps lube oil and hydraulic line

flushing and commissioning Boiler, turbine generator

and feed water system pre-commissioning work eg.

Hydro test, boiler chemical cleaning, steam purge,

turbine lube oil.

Inspection and commissioning of rotating equipment's

including horizontal and vertical centrifugal pumps

and reciprocating compressors. Supervising

activities as

Under.

Boiler Erection Checks

Flashing of Piping, Steam blowing

Hydraulic testing of boiler

Cold and Hot test of Forced draft fans and GR Fans.

Erection test of Regenerative, Soot blowing system

Performance test

Condensate pump

Erection checks, Alignment, Flashing of piping

Cold and Hot test

Boiler Feed Pump

Erection and Alignment

Cold/ Hot Function test

Civil Work of cooling water basin

Filtration system, course and fine screen and

traveling band screen, installation and

commissioning.

Installation and commissioning of main cooling water

pumps and auxiliary cooling water pumps and

performance test.

Main condenser foundation work check.

Performance tests and load rejecting tests at

different loads.

Supervisory and coordination functions during major

overhauling of 210MW 19 Stages, Tandem compound

Hitachi Japan Turbine. During this overhaul, blades

of 18th and 19th stages were replaced.

Supervisory and coordination functions with Black &

vetch International, Marubeni and Halliburton during

Chemical cleaning of 680-ton/hr steam boiler ( of

210 MW turbine) the job included the internal

chemical cleaning of steam drum, water walls, down

comers and economizer.

Participated in the installation of Debris Filter at

the condenser inlet to prevent the condenser tubes

from choking associated with Marubeni Power

Development.

. Bin Qasim thermal Power Station

Successfully completed

the training on POS30 (Process Operating

Station) for the operation of 210 MW power

generating station

Associated with the ASEA Brown Boveri (ABB)

Successfully

Completed the job training and demonstration

(Sep 15, 2003 to Sep 20, 2003)

Knowledge of System application Product (SAP-ERP-ECC

5.0 Module of plant) for data processing for the

computerized Notifications (Work Permit) (SIEMENS

PAKISTAN)

(Mar 2007 to April 2007)

The spirit of annual performance appraisal Pakistan

society for training and development.

(Dec 11, 2013 to Dec 12, 2013)

. Additional Qualification

Certificate of Appreciation from CEO:

In recognition of Outstanding contribution towards the

successful, timely and within budget completion of BQPS-I

Annual Maintenance Plan 2010-11

PERSONAL DATA:

Father Name : Manzoor Ahmed

Date of Birth : May 12, 1954

C-NIC No : 42201-9878497-5

Religion : Islam

Nationality : Pakistani

Martial Status : Married

Landline No (Res) : +922*********

Cell No : +92-333-*******

Passport No : YW1154971

Email Address : acgvuh@r.postjobfree.com



Contact this candidate