NAME : AGUS TRANG WINARNO
PLACE & DATE OF BIRTH : JAKARTA, 29 AUGUST 1974
PASSPORT NO : A4841635
NATIONALITY : INDONESIAN
* ***** : acgv42@r.postjobfree.com
MOBILE : +601********
LANGUAGES : ENGLISH / BAHASA
HIGHER EDUCATION AND QUALIFICATION:
Bachelor in Metallurgical Engineering
2 University of Indonesia
3 PRESENT WORKING EXPERIENCE:
LABUAN SHIPYARD AND ENGINEERING SDN BHD
June 2013 to date:
Attached to Welding Section, Technical Service Department assigned as
Position Title: Welding Engineer
4 Reference: Mr. Mohd Safian (QA QC Manager) mobile: +601********
5 Job Duties and Responsibilities:
. Manage welding section effectively.
. Develop and review welding procedure specification (WPS) for
structural according to AWS D1.1 Code and client's specification.
. Develop and review welding procedure specification (WPS) for piping
according to ASME IX Code and client's specification for wide range
material grade such as low carbon steel to high tensile carbon steel,
stainless steel to super duplex stainless steel, CuNi, Inconel,
Titanium, etc.
. Develop and review welding procedure specifications for raiser
pipeline comply with API RP 1104 and client's specification.
. Prepare welding sequence and work instruction.
. Review welder certificate, welder pass, and its renewal.
. Review Welding Procedure Qualification Test (WPQT) proposal.
. Review and monitoring weekly welding performance.
. Witnessing or review mechanical testing of WPQT.
. Prepare and conduct training for subordinate.
. Assess sub ordinate's KPI (Key Performance Indicator) and self KPI as
well annually.
. Assist Contract department to review welding specification of next
incoming project.
. Assist Procurement department to review welding consumable.
. Assist Expeditor to review vendor's WPS.
Project Involvement:
Engineering, Procurement, Construction, Commissioning (EPCC) of Permas
Production (PR-PA) Substructure and the Interim Production Facility (IPF)
(June 2013 to August 2013)
Client: Murphy Sarawak Oil Company
Assist production team to supervise welding activity. All welding activity
finished within 60 working days. Overall repair rate is 0.5% of total
length tested.
PREVIOUS WORKING EXPERIENCE
MALAYSIA MARINE & HEAVY ENGINEERING SDN BHD
June 2007 to May 2013:
Attached to Welding Section, Welding Department, Offshore Business Unit
Position Title: Lead Welding Engineer
Reference: Mr. Mohd Said Hamid (Welding Manager) telephone +607******* ext
3421
Project Involvement:
Damar-A Jacket-Topside ( November 2012 to February 2013)
Client: EMEPMI (ExxonMobil Exploration and Production Malaysia Inc.)
Assist procurement department to review vendor's welding specification.
Develop welding procedure specification for structural which comply MPDS
(both prequalified or new WPQT)
OSX-3 External Turret (November 2011 to February 2013)
Client: SOFEC Inc.
Reduce project cost by utilize previously qualified WPS.
Telok-A and Telok B Jacket-Topside ( December 2011 to April 2013)
Client: EMEPMI (ExxonMobil Exploration and Production Malaysia Inc.)
Assist contract & commercial department to review welding specification
that impact on cost.
Develop welding procedure specification for structural which comply MPDS
(both prequalified or new WPQT)
Tapis-R and Tapis-Q Topside (June 2011 to May 2013)
Client: EMEPMI (ExxonMobil Exploration and Production Malaysia Inc.)
Assist contract & commercial department to review welding specification
that impact on cost.
Develop welding procedure specification for structural which comply MPDS
(both prequalified or new WPQT)
Successfully reduce repair rate from 1.44% at beginning project to 0.90% by
length tested.
FSO Cendor Phase II Topside (June 2011 to date)
Client: Malaysia International Shipping Company (MISC) Berhad
Develop welding procedure specification for structural and piping.
Kinabalu NAG phase I Topside (March 2010 to April 2012)
Client: Petronas Carigali Sdn Bhd
Overall repair rate 0.64% for structural and 0.30% for piping
Develop welding procedure specification for Super Duplex Stainless steel
UNS 32760
Develop welding procedure specification for high tensile carbon steel for
riser
BP Angola External Turret (May 2009 to November 2010)
Client: Sofec - Modec - BP
Achievement:
. Qualified additional properties (HIC and SSCC properties) for existing
welding procedure for API 5L grade X80.
. Introduce Welder competition program to gain quality awareness among
the welders.
. Qualified welding procedure of duplex stainless steel 31803 comply
ASTM 923 as corrosion test method.
Jubilee External Turret (March 2009 to January 2010)
Client: Sofec Inc.
Achievement:
. Qualified new welding procedure for API 5L grade X80 (high tensile
material with heavy wall thickness)
Tangga Barat Central Processing-A Topside (December 2008 to October 2010)
Client: Petronas Carigali Sdn Bhd
Achievement:
. Overall repair rate: 0.43% for structural and 0.33% for piping
. Develop welding procedure for Inconel 725, Titanium grade 2, and low
temperature carbon steel A333 meet F65.
. Develop GTAW - SAW process for heavy wall thickness of stainless steel
pipe.
. Re-qualified all 6G and 6GR welding procedure to comply client
requirement.
Tangga Barat Central Processing-A Jacket (December 2008 to January 2010)
Client: Petronas Carigali Sdn Bhd
Achievement:
. Reduce overall repair rate from 0.70% down to 0.26%.
. Re-qualified FCAW-SS procedure to expedite production for out-position
welding process.
FPSO Ruby Topside (October 2009 to February 2010)
Client: Malaysia International Shipping Company (MISC) Berhad
Achievement:
. Delivery good quality product within tight schedule.
Committee of Good Welding Practice MMHE, May 2008, team leader for
demonstration and exhibition
Achievement: Educate audience with class tutorial & demonstration. Audience
gains their technical welding knowledge from presenter who comes from 5
difference welding company.
FPSO Ruby External Turret (June 2008 to April 2009)
Client: Single Buoy Mooring (SBM)
Achievement:
. Delivery good quality product within tight schedule.
B11-KA Topside (July 2008 to August 2009)
Client: Shell Sarawak Berhad
Achievement:
. Successfully made a packet of WPS both for cladding pipe and solid
Incoloy pipe.
Prefabrication of MCR-A Topside (March 2008 to August 2008)
Client: Petronas Turkmenistan Carigali Sdn Bhd
Achievement:
. Overall repair rate 0.42% for structural.
. Develop new WPS for pipeline riser with material ISO 8130 grade 450
Prefabrication of MCR-A Gravity Base System (February 2008 to August 2008)
Client: Petronas Turkmenistan Carigali Sdn Bhd
Achievement:
. Develop new welding procure for high carbon equivalent and comply with
Technip - Arup design specification ( -40oC Charpy properties for
prone to earthquake operation area)
. Using FCAW-GS and combination of SAW and overhead SMAW to expedite
production
. Overall repair rate 0.51% for structural
CPOC Jacket (November 2007 to October 2008)
Client: JDA Petronas Carigali - PTTEP Operating Company
Achievement:
. Delivery production 0.85% repair rate within 8,828,599mm length tested
. Using all prequalified WPS for cost saving, including WPS with CTOD
requirement
B11-KA Jacket (January 2008 to July 2008)
Client: Shell Sarawak Berhad
Achievement:
. Zero punch list with extremely low repair rate 0.26% within
8,363,919mm length tested
. Using all prequalified WPS for cost saving
PC4 Drilling Topside and Jacket (July 2007 to October 2008)
Client: Petronas Carigali Sdn Bhd
Achievement:
. Overall repair rate 0.74% for structural and 0.18% for piping
. Successfully made welding procedure for API 5L X65 clad with Incoloy
625
MOPU Storage (June 2007 to April 2008)
Client: Single Buoy Mooring (SBM)
Achievement:
. Successfully delivery product with repair rate 0.46% of 12,410,969mm
length tested
. All WPS comply with DNV specification.
Su Tu Vang External Turret (June 2007 to December 2007)
Client: Single Buoy Mooring (SBM)
Achievement:
. Delivery good quality product within tight schedule.
. Successfully perform welding process for casting steel.
PT. Edaran Profab - Batam telephone no: +627********, Subcontrator for
structural project
Position Title: QC Inspector
February 2005 - May 2007
Project involvement:
Helideck for FPSO Raroa, client: Jurong Shipyard Singapore
Railway structural for CPP Kerisi Topside, client: PT. SMOE Batam
Lifting frame structural for Bohay Topside, client: PT. SMOE Batam
Slug Storage tank, client: Vetcogray Batam
Achievement:
Delivery product on tight time schedule.
PT. Jay Kay Files - Sidoarjo telephone no: +623******** Files & Drill
manufacturing
January 2004 - January 2005
Position Title: Metallurgist for heat treatment area
Achievement:
. Installation new microscope to gain accuracy of micro structure
analysis after heat treatment process.
PT Ispatindo - Sidoarjo telephone no: +623******** Wire rod manufacturing
Position title: QC Engineer for steel melting shop area
October 2000 - December 2003
Achievement:
. Delivery 1536 wire as new special grade.
. Develop grade 1005 wire with addition Boron for Davis Wire.
. Coordinate with production team to develop semi-automatic report
(level 3) for steel melting steel shop
. Participate on GKM (Gugus Kendali Mutu) for modification of
interchange heat signal to avoid mix up during steel casting sequence.
Note: all those effort made by teamwork
January 1999 - September 2000: Free-lance private teacher for senior high
school students.
Course: Teamwork at December 1994 held by P3M and PT. USI Jaya/IBM
Personal information: male, married, and have good health stamina