Post Job Free

Resume

Sign in

Project High School

Location:
Culver City, CA
Salary:
130,000 - 160,000
Posted:
November 24, 2014

Contact this candidate

Resume:

ROBERT C. MORRIS RESUME OF QUALIFICATIONS

*** **** ******

Newport Beach, Ca 92663

H-949-***-****/ C-949-***-****

acgt18@r.postjobfree.com

* ************ **********

** ***** ********** *n Construction

20 Years Experience with Health Construction and OSHPD Jurisdiction

General Superintendent/ Project Superintendent/ Carpenter Foreman

QUALIFICATIONS

Create, Update & Maintain Construction Schedules (Projects, Suretrak, P3 &

P6)

Proficient with Microsoft Office, Expedition, Prolog, CMIC & Oracle

Expert in OSHPD Procedures (Permits, Deferred Approvals, Change Orders,

FLSO & DSE Sign-Off, with Occupancy) and Personnel (IOR, DSE, ACO & FLSO)

Extensive Experience in Site Logistics and working in and adjacent to 24/7

Health Care Facilities, with coordinating with owner on pedestrian access,

deliveries and shutdowns.

Complete Understanding of Ground Up Construction, with demo of existing

structures, excavation, trucking and stockpiling spoils. Coordinating large

concrete pours, structural steel staging, erecting, building enclosures,

site utilities and improvements.

Coordinate All job site activities, ability to maintain flow of work for

maximum project safety, productivity and quality for the project

Oversee / Manage, and Mentor Superintendents, Foreman, PE's & Cost

Engineers

Extensive Knowledge of ICRA Type, Risk, Class and systems required for a

dust free environment for construction in occupied areas

Accountable for Project Scope, Schedule and Budget from Pre-Construction to

Close-Out

Lead Job Site Safety: IIPP's, Daily JHA's and Lead from Strong Safety Mind

Set

Performed Pre-Construction Services- Client Interviews, Scheduling, Site

Logistics, Participate in Buy-Out and Estimating General Conditions

Proficient in leading job-site safety meetings, subcontractor meetings and

reporting project status in OAC meetings

CERTIFICATIONS

California Contractors B License

OSHA 30

First Aid/ CPR

Microsoft Software Training Courses

Trench and Shoring Competent Person

PROJECT HISTORY

Irvine Valley College, A-400 Building: $10 million, Relocate Utilities, re-

feed adjacent building, demo existing building/ Build New 26,000 s.f. Lab/

Classroom with new Site improvements and re-work parking lots.

City of Hope Wing 1: $8 million, Remodel in Occupied Cancer Center, Patient

Rooms, Nurse Stations, with Infrastructure Upgrades. Completed 2 months

ahead of original schedule.

Kaiser South Bay Annex Building: $43 million, 108,000 sf. New OSHPD

Building, with Radiology Department, OSHPD Med. Surg. Patient Floor and Out

Patient Services.

PROJECT HISTORY- Continued

South Region High School #7: $80 million, 160,000 sf New 3 level School,

with grandstand, administration, food service, dining buildings and

gymnasium with 2 pools

CHOC Hospital Tower II: $300 million, 425,000 sf New Tower consisting of 8

floors 200 Bed Addition, Tie-Ins to Existing Tower I & Central Plant

Saint John's Diagnostic and Treatment Tower: $228 million, 375,000 sf. New

Tower, consisting of 5 story addition to Medical Center, with OR's,

Emergency Room Suite, Radiology Floor, Cath. Labs and Patient floors. New

Base Isolated building tie-ins to existing patient tower

Los Angeles County + University of Southern California Medical Center

Replacement Project, Los Angeles, California: $620 million, 1,500,000 sf.

replacement hospital for Los Angeles County consisting of 693,000 sf.

patient tower, 430,000 sf Diagnostic and Treatment, 325,000 sf. outpatient

tower, 53,000 Central Plant and site work.

Kaiser Tri-Central Misc Projects:

Kaiser Bellflower Medical Center Replacement Project, Bellflower, CA: $10

million

Kaiser Bellflower Medical Center Infrastructure Project: The project

included new chillers, pumps, automatic transfer switches, with associated

equipment and a computer building management system upgrade.

Environment of Care Remodel, $2.2 million, Remodel of Kaiser Imperial

buildings (A,B,C,D) multi-phased project running concurrently in all four

buildings. The project introduced the new "Thrive" branding theme for the

service area. The scope included public areas to receive casework,

ceilings, doors, wall finishes and flooring. Project required daily dust

containment and working off hours in occupied areas.

Commerce Construction Project:

Hadley Trucking Facility/ Union Pacific Land Lease (Design/ Build:

The Project included 4 buildings with a central plant on 25 acres. The site

received new railroad track access, test drive track and car wash for

vehicle delivery. The project was performed on a very aggressive schedule,

with many owner changes, due to new technology.

Work History:

November 2011 - November 2014, Swinerton Builders: Senior Superintendent

January 2011 - September 2011, HBE Corporation: Project Superintendent

May 2006 - December 2010, McCarthy Building Companies: General

Superintendent

July 1992 - April 2006, Kaiser Permanente: General Superintendent

August 1989 - July 1992, Commerce Construction: Carpenter Foreman

Educational Background

Riverside Polytechnic High School

Riverside City College

Reference Letters and Contacts Available by Request



Contact this candidate