SUMMARY OF QUALIFICATIONS

I am a results-oriented construction industry professional and project management specialist with over thirty years of work

experience as a Project Manager and Estimator. I have been directly involved in contract negotiations, bi dding, budget development,

quantity take-offs & cost estimates, document control, scheduling, change orders, RFI, subcontracts, submittals, project supervision,

quality & cost control, and able to meet my employers’ expectations to realize profit in all pr ojects I have handled.

EMPLOYMENT HISTORY

I. February 2003 To February 23, 2009: ROEL CONSTRUCTION

3366 Kurtz St.

San Diego, CA 92110

2/5/03 to 12/11/05 – Assistant Project Manager

Position:

12/12/05 to 2/23/09 - Project Manager

o Reviewed estimates with attention to adherence to cost control system, equipment requirements and utilization,

constructability, materials, and manpower, among others.

o Coordinated the means and methods required for the successful execution of the work.

o Managed the orderly, timely transition of projects from the estimating to the field which included project review

meetings, review of contract requirements, general conditions, schedules, budgets, subcontracts, and purchase

order agreements.

o Analyzed and approved CPM schedules monthly and makes sure that as many levels of detailed schedules are

prepared and distributed as required to support the project schedule, with special attention to prevention and

documentation of delays or changes.

o Prepared the monthly progress report in coordination with the Superintendent(s), used available reports to manage

costs and prepare accurate cost projections.

o Reviewed and executed all change orders, supplements and cost control budget adjustments.

o Managed all billings to ensure timely submission of payment applications and receipt of payments from the Owner

in order to maintain a positive cash flow position. Managed the overall payment process with the subcontractors.

o Managed subcontracts with respect to insurance certificates, bonds, and the appropriate lien waivers.

o Completeds close-out requirements and punch lists in a timely manner, handled warranty call backs promptly to

maintain Owner/Client relationships.

o Attended regular periodic project meetings with the Owner, Architect, and Construction Manager.

II. June 1999 to July 19, 2002: HALLMAN & HALLMAN, INC.

13624 Floyd Circle

Dallas, Texas 75243

Position: Project Manager / Estimator

III. March 1997 to February 1999: AES CONSTRUCTION, INC.

1350 N. Marine Drive

Tamuning, Guam 96911

Position: Project Manager (RESIGNED TO RELOCATE TO TEXAS)

IV. February 1996 to February 1997: PRIVATE PROFESSIONAL PRACTICE, GUAM

IV. October 16, 1995 to January26, 1996: GUAM AIRPORT AUTHORITY

P.O. Box 8770

Tamuning, GU 96931

Position: Engineer II (Civil)

V. January 1994 to April 1995: FLETCHER PACIFIC CONSTRUCTION CO

P.O. Box 23068

1/5

11/21/2014

BENJAMIN B. PIA, JR

1944 Reo Drive

San Diego, CA 92139

Ph. 619-***-****

acgszy@r.postjobfree.com

GMF, Guam 96921

Position: Superintendent

VI. May 1989 to January 1994: INLAND BUILDERS CORPORATION

P.O.Box 2767

Agana, Guam 96932

Position: Project Manager

VII. February 1986 to April 1989: Private Professional Practice - Philippines

VIII. November 1980 to January 1986: MULTI DEVELOPMENT & CONSTRUCTION CORPORATION

Makati City, Metro-Manila, Philippines

Position: Vice President for Operations

IX. April 1973 to October 1980: R.C. GONZALEZ CO. INC.

Mandaluyong City, Metro-Manila, Philippines

Position: Head, Buildings & Structures Department

Concurrently Project Manager

X. September 1967 to March 1973: AVECILLA BUILDING CORPORATION

Manila, Philippines

Position: Civil Engineer / Works Engineer

TRAINING / SEMINARS ATTENDED & COMPLETED:

o CAL / OSHA 10-HR Construction Safety & Health Training Course, Completed Fe bruary 10, 2009

o Technical Training Courses conducted by Roel Construction

Key Scheduling Concepts “Suretrak”, February 2008

o

Professional Supervision Skills Seminar, Dallas, TX – May 2001

o

o OSHA 10-HR Construction Safety & Health

Sponsors - Black Construction and Fletcher Pacific Construction

July 1994, Pacific Star Hotel, Tamuning, Guam

o The First Annual Contractors / Developers Convention Seminar on Safety

Sponsor - Guam Contractors Association

October 1991, Guam Hilton Hotel

SKILLS

Proficient with MS Office (Word, Excel, Project), Primavera Expedition Project Management, Suretrak Scheduling, Use of Digitizer

for quantity take-offs, Quantity & Cost Estimating

EDUCATIONAL BACKGROUND

Graduate: Bachelor of Science in Civil Engineering

Mapua Institute of Technology

Manila, Philippines

Special Course Attended & Completed:

Management & Application of PERT-CPM

University of the Philippines

Institute for Small-Scale Industries

Diliman, Quezon City, Philippines

2/5

11/21/2014

BENJAMIN B. PIA, JR

1944 Reo Drive

San Diego, CA 92139

Ph. 619-***-****

acgszy@r.postjobfree.com

Civil Service Eligibility:

Registered Professional Civil Engineer - Philippines

LIST OF PROJECTS UNDERTAKEN & COMPLETED

I. HOTEL, with Roel Construction :

o Agua Caliente Casino & Resort Hotel - Rancho Mirage, CA

o The 552,000 square-foot project consists of a 16-story, 340-room hotel next to the existing casino, with meeting

rooms, pre-function convention space, complete spa, and back of house areas. I was assigned as the PM in charge of

the M.E.P. & Equipment component of the project worth aprrox. $45Million. The project was completed in April

2008. Approx. Cost - $175Million.

II. HEALTHCARE FACILITY, with Roel Construction:

o El Centro Regional Medical Center - El Centro, California

This 65,000 SF modernization and expansion project was completed in two phases. Phase 1 included a two -storey

structure housing a 20-bed emergency room, a 12-room ICU wing with five isolation rooms, a 48 -bed

medical/surgical wing with eight isolation rooms, and an ambulatory surgery center with five operating rooms and

two procedure rooms. It also includes a new central plant and emergency generator that augments the existing

systems. Phase 2 included the demolition and rebuilding of a 50 -year old section of the hospital that houses an

emergency room and surgery rooms. The new 6,000 SF structure includes a lobby/regi stration area, gift shop,

chapel, and a 25-foot water feature. Site work included demolition, earthwork, paving, and underground utilities.

The project was completed in October 2004 at a cost of $28Million.

II. TIMESHARES, with Roel Construction:

o Aviara Timeshares Phase 5A - Carlsbad, California

A 25,254 SF project consisting of two new timeshare buildings and adjacent site work

for Four Seasons Resort Club. The wood-frame and stucco finish buildings are 3 -level villas with two units per

floor.

The project was completed in July 2005 at a cost of $7Million.

III. TENANT IMPROVEMENT, with Roel Construction:

6th St., San Diego, CA

o ICON Presentation Center

This one-of-a-kind, fully constructed and furnished showcase model ho me allows individuals to explore the interior

elements and designer finish packages of the future ICON Condominiums in downtown San Diego. It also includes

a state-of-the-art interactive virtual tour. It was completed in April 2004

Estimated Cost- $0.5 Million.

IV. OFFICE BUILDING, with Roel Construction:

o Qualcomm Building WT - 5751 Pacific Center Blvd., San Diego, CA

A new 415,000 SF, 12-storey office building with a partial basement, which includes over 50,000 SF of lab space, a

fitness center, and a full-service cafeteria. Scheduled for final completion in October 2006.

Estimated Cost - $80Million

3/5

11/21/2014

BENJAMIN B. PIA, JR

1944 Reo Drive

San Diego, CA 92139

Ph. 619-***-****

acgszy@r.postjobfree.com

III. CUSTOM-BUILT RESIDENTIAL SEMI-CONCRETE BUILDINGS:

A. PHILIPPINES:

o Two-Story 350 Sq. M. Residence for Ms. Dulce Vergara in New Intramuros Subd ivision, Quezon City.

o One-Story 400 Sq. M. Residence for Mr. Ricardo Dizon in New Alabang Subdivion, Muntinlupa City.

o Two-Story 600 Sq. M. Residence for Mr. Eduardo De Los Angeles in Ayala Alabang Subdivision, Muntinlupa City.

o Two-Story 550 Sq. M. Residence for Mr. Carlos Syquia in Greenhills Subdivision, San Juan City.

o Two-Story 420 Sq. M. Residence for Mr. Wilfrido Vergara in Mira -Nila Subdivision, Quezon City.

o Two Story 240 Sq. M. Residence for Mr. Patricio De Guzman in Caloocan City.

o Two-Story, 700 Sq. M. Residence for Mr. Ramon C. Gonzalez in Mandaluyong City.

o Two-Story 650 Sq. M. Residence for Mr. Antonio Garcia, Jr. in Dasmarinas Village, Makati City.

o Two-Story 450 Sq. M. Residence for Ms. Zenaida Tongco in Greenhills Subdivision, San Juan City.

o Two-Story 500 Sq. M. Residence for Ms. Carolina Llamanzares in Greenhills Subdivision, San Juan City

o One-Story 400 Sq. M. Residence for Ms. Antoinette Santos in Greenhills Subdivision, San Juan City.

IV. TRACK RESIDENTIAL SEMI-CONCRETE BUILDINGS:

PHILIPPINES

o Ten Units of One-Story 200 Sq. M. Residential Houses for the Provident Fund Housing Project of the Philippine

National Bank in Lucena City.

V. RESIDENTIAL CONDOMINIUM REINFORCED-CONCRETE BUILDINGS:

PHILIPPINES:

o Seven-Story 120-Unit Midland Mansions Condo minium in Makati City.

VI. COMMERCIAL / OFFICE BUILDINGS:

PHILIPPINES:

o Multi-Purpose & Recreation Building and Site Development for the PNOC Energy Development

Corporation Geo-Thermal Plant Complex in Tongonan, Leyte.

o Two-Story Computer Systems Building for the Philippine National Oil Company in Makati City.

o Canteen Building for the Philippine National Oil Company in Makati City.

o Public Market Building & Site Development in Tarlac City.

o Special Market Buildings & Site Development in La Trinidad, Benguet .

o Architectural Interior Finishing Renovation of 4 -Three Story Buildings for the Philippine National Oil

Company in Makati City.

o Complete Finishing Works for the new Two-Story Building of the Philippine National Bank Branch Building in

Lingayen City, Pangasinan.

o Two-Story Regional Office Building of the Bureau of Internal Revenue in San Fernando City, Pampanga.

o 3-Two Story Buildings for the Sta. Ana Elementary School in Manila.

o Planetarium Building for the National Museum in Rizal Park, Manila.

o Two-Story Branch Office Building for the Filipinas Life Assurance Company in Cagayan De Oro City.

o Two-Story Branch Office Building for the Filipinas Life Assurance Company in Batangas City.

o Three-Story Commercial Apartment Building for Martinez -Leyba, Inc. in Binondo, Manila.

o Finishing Works for the Nine-Story Office Building for Bank of the Philippine Islands in Makati City.

o Five-Story Office Building for the Central Bank of the Philippines in Manila.

o Two-Story Office Building and Site Development for the Base Works hop Complex of the Bureau of Equipment

in La Trinidad, Benguet.

GUAM:

o $2.5M Two-Story Reinforced-concrete Facility Building for the Guam Mental Health &

Substance Abuse Dept. of Guam in Tamuning.

4/5

11/21/2014

BENJAMIN B. PIA, JR

1944 Reo Drive

San Diego, CA 92139

Ph. 619-***-****

acgszy@r.postjobfree.com

$ 0.60M Two-Story Office Reinforced-concrete Building for the Amparo’s Foreign Exchange

o

in Tamuning.

o $0.50M Display & Office Building for AK Motors in Tamuning.

o $6M Finishing Works for the Six-Story Sirena Plaza Office Building in Agana.

VII. INDUSTRIAL STRUCTURAL STEEL BUILDINGS:

PHILIPPINES:

o Meat Processing Plant Building for the Vitarich Corporation in Marilao, Bulacan.

o Warehouse Building for the Pepsi Cola Bottling Co. (Phils) in Calamba, Laguna.

o Warehouse Building for the Pepsi Cola Bottling Co. (Phils) in Lipa City, Batangas,

o Warehouse Building for the Pepsi Cola Bottling Co. (Phils) in San Fernando City, Pampanga.

o Enamelling & Assembly Plant Building for the Friction Materials Corporation in Pasig City.

o Factory Building & Site Development for the Friction Materials Corporation in Pasig City.

o Kiln Drying Plant Building for G.E.C.Mears, Inc. in San Pedro, Laguna.

GUAM, with Inland Builders:

o Two-Story Warehouse Building for M.V. Pangilinan Enterprises ( Ace Hardware ).

VIII. HOTELS:

PHILIPPINES:

o Finishing Works of the Five -Story 100-Room Mayon Imperial Hotel in Legazpi City.

o Renovation Works of the Tradewinds Hotel in Makati City.

GUAM, with Inland Builders:

o $ 25M New Ten-Story Park Hotel in Tumon.

IX. ROADS:

PHILIPPINES:

o 1.2 Km. Concrete Roadway of M. De La Fuente St., in Manila.

o 1 Km. Concrete Roadway of Dagohoy St. in Caloocan City.

o 1.50 Km. Concrete Roadway in Caloocan City.

o 10 Km. Concrete Highway in Tuguegarao City, Cagayan.

X. OTHERS:

DALLAS, TX, with Hallman & Hallman:

o $2.5M Concrete & Structural Steel Works for DM4 Scrubber Yard of Texas Instrument s.

o $2.1M Architectural & Concrete Works for DM6 3 -Storey Building of Texas Instruments.

o $1.2M Concrete & Structural Works for the South Building Scrubber Yard of Texas Instruments.

o $0.6M Clean Tunnel & Interlink Structural Steel Structure of Atmel Corporat ion.

o $0.9M Replacement of Cooling Tower of Texas Instruments.

o Various interior renovation works in fabrication areas / clean rooms for Texas Instruments