CURRICULUM VITAI

Hermogenes D. Sabal

Address: Phase-1 Block-1 Lot-7 Villaleyson Subdivision, Bacayan, Cebu City,

Philippines, 6000

Tel. No.: 006**********

Mobile No.: 006*********** / 008***********

Email Address: acgswj@r.postjobfree.com

OBJECTIVE

Steam Turbine/Rotating Mechanical Field Service Engineer

Work Experiences:

1. Steam Turbine Mechanical Field Service Adviser

Company: Mitsubishi Hitachi Power System

Address: Nagasaki, Japan

Employment Date: June 1, 2014 up to Present

Project Attended: 1) LAL PIR Power Station, Lalpir, Pakistan; Project Specification:

High Pressure/Intermediate Pressure and Low Pressure

Turbine rotor and inner parts modification

Unit Capacity: 362 MW, Tandem Compound Reheat Regenerative,

Mitsubishi Steam Turbine

2) Sabiya Power Station, Kuwait, Ministry of Electricity and Water

Project Specification: Steam Turbine Overhauling and Inspection

Unit Capacity: 300 MW, Tandem Compound Reheat Regenerative,

Mitsubishi Steam Turbine

2. Boiler Mechanical Commissioning Engineer

Company: Marubeni Corporation/Japan Jurong Engineering Ltd.

Address: Nghi Son, Vietnam

Employment Date: December 15, 2012 up to March 31, 2014

Project Attended: Nghi Son 1 Coal Fired Thermal Power Plant, Vietnam (EVN)

Electrity of Vietnam National; Project Specification: Commissioning

For two units Foster Wheeler Power Boiler;

Unit Capacity: 300 MW x 2 Units

Boiler Type: Subcritical Reheat Boiler, Natural Circulation, Down Shut

Anthracite Coal Fired Boiler

3. Steam Turbine Mechanical Field Service Engineer

Company: General Electric International Inc.

Address: 504, Mazen Al-Saeed Towers, P.O. Box 2647,

Al-Khobar 31952, Kingdom of Saudi Arabia

Employment Date: July 19, 2011 up to Nov. 30, 2012

Unit Model: SNC 1-5 + 3BCL, SNC 1-6 + 2BCL, SAC 1-10 + 3BCL608,

SAC 1-15 + 3MCL1806, SAC 1-4 + 2MC1406 + DMCL1406 + DCL807

4. Thermal Power Plant Commissioning and Maintenance Shift Engineer

Company: Mitsubishi Heavy Industries Ltd.

Address: Nagasaki, Japan

Employment Period: May 31, 2004 up to May 15, 2011

Project Attended: 1) Shuqaiq-2 Independent Water and Thermal Power Plant Project,

Kingdom of Saudi Arabia; Project Specification: Full turnkey

Thermal Power Plant Project

Unit Capacity: 340 MW x 3 Units

2) Elbistan-B Coal Fired Thermal Power Plant, Elbistan City,

Kahramanmaras Province, Turkey; Project Specification:

Commissioning and Operation/Maintenance Warranty Engineer for

4 units steam turbine

Unit Capacity: 365 MW x 4 Units, Tandem Compound Reheat

Regenerative, Mitsubishi Steam Turbine

5. Power Boiler Commissioning and Maintenance Shift Engineer

Company: Mitsui Babcock Energy Ltd.,

Address: Hanoi, Vietnam

Employment Period: May 30, 2001 to October 22, 2003

Project Attended: 1) Pha Lai-2 Coal Fired Thermal Power Plant Project, North Vietnam

Project Specification: Commissioning and operation for two units

Down Shut Anthracite Coal Fired Babcock Boiler

Unit Capacity: 300 MW x 2 Units

6. Combine Cycle and Thermal Power Plant Commissioning and Maintenance Shift

Engineer

Company: Mitsubishi Heavy Industries Ltd.,

Address: Nagasaki, Japan

Employment Period: May 15,1995 up to May 3, 201

Project Attended: 1) EVN Phu My 1 Combine Cycle Power Plant, Phu My, Baria

Vungtao, Southern Vietnam; Project Specification: Commissioning

And Operation three units Heat Recovery Boiler and one unit steam

turbine; Combine Power Capacity: 1,050 MW, Individual Shaft,

three Gas Turbine and One Steam Turbine

2) EGAT Rachabury Gas/Oil Fired Thermal Power Plant Project,

Rachabury, Thailand; Project Specification: Commissioning and

Operation two units Super Critical Boiler

Unit Capacity: 780 MW x 2 Units

3) AES Lalper Oil Fired Thermal Power Plant Project, Lalper

Pakistan; Project Specification: Commissioning and

Operation/Warranty Engineer for two units Steam Turbine and

Boiler; Unit Capacity: 360 MW x 2 Units

4) Pagbilao Caol Fired Thermal Power Plant Project, Pagbilao,

Philippines; Project Specification: Commissioning and Operation

For two units Steam Turbine and Coal Fired Boiler

Unit Capacity: 360 MW x 2 Units

7. Thermal Power Plant Senior Control Room Operator

Company Name: SCECO Saudi Consolidated Electricity Corporation / IPAMS(Industrial

Personnel and Management Services) Dhammam, Kingdom of Saudi Arabia.

Power Plant Name: Qurayyah Gas/Oil Fired Thermal Power Plant

Unit Capacity: 625 MW x 4 Units

Period of Employment: Aug. 1994 up to May 1995

8. Thermal Power Plant Senior Control Room Operator

Company Name: Mitsubishi Heavy Industries Ltd.

Project Name: Qurayyah Gas/Oil Fired Thermal Power Plant Project, Qurayyah,

Eastern Province, Kingdom of Saudi Arabia

Unit Capacity: 625 MW x 4 Units

Project Period: Feb. 10, 1988 up to Sept. 1993

9. Thermal Power Plant Rotating Equipment Technician

Company Name: Atlas Consolidated Mining and Development Corp.

Power Plant Name: Sangi Coal Fired Thermal Power Plant, Sangi, Toledo City, Cebu,

Philippines

Unit Capacity: 120 MW Total Capacities

10. Gas/Diesel Engine Maintenance Mechanic

Company Name: R & L Robles Enterprises, Leon Kilat Street, Cebu City, Philippines

Number of Unit: 10 Units Toyota Gas Engine, 15 Units Isuzu Elf Diesel Engine,

and 10 Units Mazda Gas Engine

Employment Period: June 24, 1973 up to Oct. 20, 1978

DUTIES AND RESPONSIBILITIES

1. Being Steam Turbine Mechanical Technical Field Service Adviser,

1) I shall be able to perform these tasks autonomously:

Steam Turbine Installation, Rotor centering and Shaft Alignment

Steam Turbine modification application

Steam Turbine major overhauling and inspection

Steam Turbine trouble shooting

Steam Turbine journal bearing alignment and thrust bearing clearance setup

Steam Turbine Valve Overhauling; Main Stop Valve, Governing Valve, Interceptor

Valve, Reheat Stop Valve and Extraction Control Valve

Steam Turbine Hydraulic and lube oil system oil flushing

2) Procedures; Review, modify and execute overhauling and inspection procedure

According to the site requirements

3) Health, Safety and Environment; Monitor and Implement the safety planning of site

Activities with regards the permit to work system as well as health and environment

4) Coordination; Coordinate the customer work requirement and safety management

Systems.

5) Evaluation and modify the steam turbine clearances as per design requirements

6) Engineering & Project; Carried out Steam Turbine Rotor clearances measurement

Radial/axial position and update the work schedule planning as per actual progress

That can be meet the target completion schedule.

2. Being Shift Charge Engineer for Coal/Oil/Gas fired Thermal Power Plant;

Autonomously execute the following activities:

2.1 Manage the Power Plant Operation at minimum to maximum load requirement of

the power system

2.2 Manage the following Commissioning activities as per planning schedule

1) Manage the Boiler Hydrostatic Testing as per design requirement

2) Steam Turbine lube/hydraulic control oil pressure adjustment

3) Steam Turbine Main Stop Valve, Governing Valve and Interceptor Valve

adjustment and setting up the valve opening and closing as per design curve.

4) Manage the Boiler Acid Cleaning as per required the plant chemistry

5) Manage the Thermal Power Plant start-up, shutdown and emergency operation

6) Manage the Boiler and Steam Turbine pipe steam blowing

7) Manage the Boiler operation for Combustion tuning

8) Manage the Boiler operation for safety valve testing and adjustment

9) Thermal Power Plant load Fast Cut Back testing

10) Thermal Power Plant Auxiliaries change over

11) Thermal Power Plant Performance Testing

12) Thermal Power Plant Reliability Testing

2.2 Procedures:

Suggest any improvement for operation procedure. Participate and review in system

modification and development. Manage and execute the modified operation

procedure approved.

2.3 Health, Safety and Environment

Attend safety, health, environment and accident/incident prevention seminar. Ensure

conformity to operation procedures and participates in plant safety inspection and

provides recommendation to maintain high level of plant operation reliability and

safety. Manage work permit issuance to each requester from different construction

section.

2.4 Coordination

Manage the Coordination of the Boiler, Water, and Steam Turbine/Generator on

various operational activities. Manage proper operation adjustment to ensure

optimum and reliable operation.

2.5 Maintenance shutdown

Manage the unit shutdown and turnaround program with our construction Planning at

system construction and commissioning/operation areas. Review shutdown reports

and equipment conditions as per approved maintenance request. Monitoring work

progress and liaison with appropriate construction personnel and advises accordingly.

2.6 Evaluation of modification proposal

Studies and analyses equipment/units operation, performance and execute in all types

of modification approved. Reviews modification of operation procedure, drawings

and issues comments on such modification and suggest improvement where

necessary.

2.7 Engineering & Project

1) Analyzed of contract document and correspondence including subcontractor

identification of possible trouble area.

2) Execution of all related commissioning/operation activities under Mitsubishi

Heavy Industries Ltd. Head office instruction.

3) Give technical advice to our client for proper operation and maintenance of unit

power plant.

4) Coordinate technical activities between client and Mitsubishi Heavy Industry as

well as consortium partner.

5) Monitoring and witness for equipment testing and inspection at site in a position of

Mitsubishi Heavy Industries.

6) Attending the meeting with the client and consortium/subcontractor.

7) Daily follow-up of Power Plant operation and maintenance technical submission.

8) Make a daily report to Mitsubishi Heavy Industries (MHI) office for current

Power Plant status and all problem occurred as well as causes/potential problem

that has given technical advices.

3. Being Boiler Commissioning Engineer for Coal/Oil/Gas Firing Thermal Power Boiler

and its Auxiliaries commissioning and operation, execute my duties and responsibilities

autonomously as follows:

3.1 Directing for safety Commissioning, Operational and Testing as per manufacturer

standard.

1) Boiler Hydrostatic Testing

2) Boiler Auxiliaries Heat Run Testing

3) Boiler Acid Cleaning

4) Boiler start-up, shutdown and emergency operation

5) Boiler Steam Blowing

6) Boiler Combustion Tuning

7) Boiler Safety Valve Testing and Adjustment

8) Boiler Fast Cut Back

9) Boiler Auxiliaries change over

10) Boiler and Turbine/Generator Performance Testing

11) Boiler and Turbine/Generator Reliability Testing

3.2 Procedures

Review and carried out boiler start-up, shutdown and Emergency operation

procedures. Suggest any improvement for operation procedure. Participate and review

in system modification and development.

3.3 Health, Safety and Environment

Attend safety, health, environment and accident/incident prevention seminar. Ensure

conformity to operation procedures and participates in plant safety inspection and

provides recommendation to maintain high level of plant operation reliability and

safety. Participates work permit issuance to each requester from different construction

section.

3.4 Coordination

Coordinate with Boiler, Water, and Steam Turbine/Generator on various operational

activities. Suggest proper operation adjustment to ensure optimum and reliable

operation.

3.5 Maintenance shutdown

Supervise unit shutdown and turnaround program with our construction Planning

Section at system construction and commissioning/operation areas. Review shutdown

reports and equipment conditions with commissioning/operation section head.

Approve maintenance request, monitoring work and progress in liaison with

appropriate construction personnel and advises heads accordingly.

3.6 Evaluation of modification proposal

Studies and analyses equipment/units performance and issues in all types of

modification request. Reviews and modification drawings, issues comments on such

modification and suggest improvement where necessary.

3.7 Engineering & Project

1) Analyzed of contract document and correspondence including subcontractor

identification of possible trouble area.

2) Execution of all related commissioning/operation activities under Mitsui Babcock

Head office instruction.

3) Give technical advice to our client for proper operation and maintenance of unit

power plant.

4) Coordinate technical activities between client and Mitsui Babcock as well as

consortium partner.

5) Monitoring and witness for equipment testing and inspection at site in a position of

Mitsui Babcock Energy Ltd..

6) Attending the meeting with the client and consortium/subcontractor.

7) Daily follow-up of unit Boiler and its Auxiliaries operation and maintenance

technical submission.

8) Make a daily report to Mitsui Babcock office for current unit Boiler and its

Auxiliaries status and all problems occurred as well as causes/potential problem that

has given technical advices.

4. Being Mechanical Power Plant Mechanic for 7 units boiler, 5 units steam turbine, 1 unit

gas turbine, 1 unit power barge with its auxiliaries, execute my duties and responsibilities

as follows;

4.1 Mechanical Maintenance

1) Carried out preventive maintenance for the unit boiler, unit steam turbine, gas

turbine as well as its auxiliaries by mains of monitoring its operating hours for there

proper lubrication application, and monitoring rotating equipment bearing vibration to

prevent sudden wear of rotating parts.

2) Carried out corrective maintenance for the unit boiler tube thickness inspection,

boiler steam drum internal inspection, unit steam turbine/generator, and gas

turbine/generator as well as its auxiliary shaft coupling alignment, shaft bearing

inspection, and equipment overhaul.

3) Procedures

Review and carried out boiler, steam turbine/generator, gas turbine/generator and its

auxiliaries manufacturers maintenance procedures.

Suggest any improvement for maintenance procedure to make plant operation reliable.

Participate and review in system modification and development.

4) Health, Safety and Environment

Attend safety, health, environment and accident/incident prevention seminar. Ensure

conformity to maintenance procedures and participates in plant safety inspection and

provides recommendation to maintain high level of plant operation reliability and

safety. Participates work permit issuance to each requester from different section.

5) Coordination

Coordinate with Power Plant Operation section, Electrical section, Instrument and

control section on various mechanical maintenance activities. Suggest proper

operation adjustment to ensure optimum and reliable operation to minimize possible

mechanical maintenance.

6) Evaluation of modification proposal

Studies and analyses equipment/units performance and issues in all types of

modification request. Reviews and modification drawings, issues comments on such

modification and suggest improvement where necessary.

6. Being Automotive Maintenance Mechanic, execute my duties and responsibilities as

Follows:

6.1 Maintenance

Carried out engine trouble shutting and overhauling as well as its accessories.

Personal Data:

Name: Hermogenes D. Sabal

Address: Phase-1 Block-1 Lot-7 Villaleyson Subdivision, Bacayan, Cebu City,

Philippines, 6000

Tel. No.: 006********** House

Cell No.: 006*********** / 008***********

Email Address: acgswj@r.postjobfree.com

Date of Birth: July 13, 1960

Place of Birth: Lucsoon, Cebu City, Philippines

Civil Status: Married

Name of Spouse: Mrs. Ponciana G. Sabal

Name of Children: Kristina Mae G. Sabal, Kuennie Marie G. Sabal, Kathleen Meldrid G. Sabal

Educational Attainment: Bachelor of Science in Mechanical Engineering Graduate

Year Graduated: Class 1998 October

University Graduated: University of the Visayas, Colon Street, Cebu city, Philippines

QUALIFICATION: Certified Plant Mechanic with License no. 0008809

Philippine Professional Regulation Commission of Mechanical Engineer

Training: 1. Steam Turbine Overhauling, Mitsubishi Hitachi Power System Training Center,

Yokohama, Japan

Date of Training: July 1- 19, 2014

References:

Ms. Yumiji Fukasawa

Senior Manager

Human Resource Division

Japan Jurong Engineering Co., Ltd.

Mr. Phil McManus

Commissioning Manager

Mitsui Babcock Energy Ltd.

Pha Lai 2 Thermal Power Plant Project

Pha Lai, Chilinh District, Hai Duong Province, Northern Vietnam

Mr. Antonio C. Cuyos

Power Plant Manager

Atlas Consolidated Mining and Development Corporation

Sangi Thermal Power Plant

DAS Toledo City, Cebu, Philippines



Contact this candidate