Post Job Free

Resume

Sign in

PMP, Six Sigma

Location:
Palm Harbor, FL
Salary:
75000.00
Posted:
November 04, 2014

Contact this candidate

Resume:

To navigate between the fields below, press F**

NAME: Gregory J. Covetz Employee # DATE: August 12th

2014

acgl4z@r.postjobfree.com

***/***/****

POSITION TITLE Asst. Superintendent Unit

#2

ORGANIZATION Power

LOCATION Prairie Energy Campus,

Lively Grove, IL.

CITIZENSHIP United States of America

CONTINUOUS SERVICE 11 Mos.

SPOUSE'S NAME Lynda Covetz Deceased

8/28/11

CHILDREN'S DETAILS 3 adult children

PROFESSIONAL LICENSES AND SOCIETIES

. Notary Public, State of Florida, # DD 989756, by appointment of the

Governor

. Crematory Operator, State of Florida, regulated by the State Medical

Examiner

EDUCATION AND PERSONAL DEVELOPMENT PROGRAMS

Degree, Certificate, etc., School Major (or Subject) Date

T. Roosevelt HS Math & Science 1966

BM Apprentice Welding, rigging, 1968-1973

print reading, OSH

10, certified welder

OTHER SIGNIFICANT INFORMATION

(Examples of relevant information that might be included here)

Duties & Author: Steel erection guide lines for the FGD Project, SCS

Responsibilities Safety, and Contractor guide lines for H1N1 2009-2010.

Attendee Pre-Bid meetings, holder of all Boiler clearances

during outages.

Rad Worker Trained, AlARA, FME trained. OSHA 10 Certified

welder, stick, Mig, Tig, Automatic

WORK HISTORY

COMPANY, DIVISION OR POSITION HELD, SUMMARY OF

DATES DEPARTMENT, RESPONSIBILITIES AND

FROM TO LOCATION AND SUPERIOR SIGNIFICANT ACCOMPLISHMENTS

6-10 Present Bechtel Construction Co. 800 MW B&W Super Critical Coal Fired

Prairie State Energy Unit

Campus Boiler Superintendent responsible for

Lively Grove, Il Boilermaker Safety, productivity, and

Ed Donahue, Toby schedule. Responsible for erection of

Tobiason all major boiler components: water

walls, steam headers, and steam

elements. Provided daily reporting of

quantities, i.e. components installed

and welding completed. Excellent

working relationship with Union

Boilermakers and all other Union

Crafts. 100+ tradesmen, no recordable

injuries.

8-07 4-10 Southern Co. Services Precipitator Rebuild

Alabama 188 MW,190 MW & 800 MW Coal Fired

Scott Jackson Units

Discipline Coordinator, Primary

Discipline Lead

Responsible for removal and

replacement of all collector plates

(CP) and electrodes (RDE) (GE-BHA

Collector Plates and Rigid Discharge

Electrodes). Devised a method to hang

all CP'S & RDE's as one lift which

resulted in time and cost savings to

the project.

Supervised multi craft union work

force. 150+ tradesmen, no recordable

injuries.

800 MW B&W Coal fired unit

Responsible for fabrication and

erection of FGD duct work, including

tie in to unit. Supervised

fabrication, transportation and

erection of FGD duct work to Scrubber

Island. All work was completed and

turned over to Startup on schedule.

Supervised 100+ tradesmen, no

recordable injuries.

880 MW B&W Coal fired unit

Trona Injection System

Supervised the erection of theTrona

storage silos, stair towers, pipe

bridges, cable trays. Also oversaw the

erection of the Blower & MCC Bldgs.

Multi Craft, 100 + tradesmen, no

recordable injuries.

12-02 4-03 Gem Ind. Contractor 900 MW Combustion Tangential Fired

Trenton Channel P.P. Boiler

Trenton, Mi. Boilermaker GF, directed replacement

of the Super Heat Element Section and

Economizer Sections at the Trenton

Channel P.P. for Detroit Edison. This

outage was the first to use Orbital

welders on a Super Heat replacement.

.

3-01 12-01 Kvarner / Songer 900 MW Westinghouse Co-Gen Units

Jackson, Mi. Boilermaker GF directed the erection

of six Combined Cycle Units. This

included all stair towers and

platforms and all stacks and

silencers.

100 + tradesmen, no recordable

injuries.

9-99 5-20 Bechtel 1048 MW Westinghouse PWR Reactor

Bridgeman, Mi. Foreman and then promoted to GF.

Duties were to direct the off loading

and transporting of four Steam

Generators to a temporary facility in

preparation of placement in

Containment. Also on this project the

Steam Domes were removed and taken to

the Turbine Deck to have the internals

replaced. After Steam Generator and

Steam Dome were fit, CB&I completed

the weldment. Other duties included

coordinating the Stress Relief crew

and Fire Watch in Containment.

200 Tradesmen, no recordable injuries



Contact this candidate