Gerald M. Campbell
Endicott, NY 13760
SUMMARY
Senior Engineering Professional with over twenty years of experience in all
phases of Printed Circuit Board (COB) Manufacturing. Expertise in Assembly
Process Development, Manufacturing Engineering, Cost Planning and
Management. Major strengths in Project Management, Program Management,
SPC, Design of Experiments and Pin in Hole Assembly. Result-oriented, well-
organized leader who is innovative and communicates effectively.
WORK EXPERIENCE
MASTER CLEANERS INC., Binghamton, NY 2003-2011
Plant Manager
Responsible for daily plant operations, workload planning and new business
development.
. Coordinated equipment upgrade to meet the NYS Department of Conservation
emission requirements.
. Justified new cleaning equipment which significantly reduced processing
chemical usage and cost.
LOCKHEED MARTIN, Archbald, PA 2000-2002
Naval Electronics & Surveillance Systems
Program Manager
Responsible for government contract negotiations and all phases of Rod
Control systems design, Manufacturing, Finance, Profit/Loss and Delivery.
. Improved product reliability testing by 6 months with the implementation
of parallel processing.
. Successfully negotiated with the US Navy to provide follow-on systems
valued at $20 million dollars.
. Generated Life Time Buys on obsolete components avoiding product redesign
cost and profit loss.
MASTER CLEANERS INC., Binghamton NY 1994-2000
Plant Manager
Responsible for the overall daily plant operations, workload planning,
capital expansion and profit/loss.
. Justified capital equipment expansion eliminating outsourcing and
improving year-end profit by 10%.
. Expanded service offerings significantly improving workload and equipment
utilization.
. Implemented and aggressive marketing campaign, increasing product
volumes by 15%.
IBM CORPORATION, Endicott, NY 1990-1994
Microelectronics Division
Assembly Program Manager
Responsible for sizing, planning and identifying resources required to
support development of new programs.
. Led task force which identified process changes in the raw material and
improved the process flow by 25%.
. Generated internal response for Request for Quotes (RFQ's) which
resulted in a one million dollar cost savings to the end user.
. Provided direction that enabled project to consistently meet or exceed
all commitments' to schedules and cost.
Assembly Engineer 1987-1990
Responsible for development and implementation of processes and equipment
into manufacturing.
. Developed vacuum assembly tool that increased the manual insertion of a
discrete component that resulted in a 50% unit hour savings.
. Implemented micro miniature coax cable backplane assembly process that
provided a 10% reduction in processor cycle time.
. Coordinated the development of a wire bonder that improved thru-put from
10 to 60
Wires per hour.
Department Manager 1984-1987
Responsible for department staffing, budgeting, personnel management,
production control and variance analysis.
. Implemented team concept philosophy in manufacturing. End results
yielded 25% reduction in cycle time and work in process.
. Facilitated training of 20 employees in group technology techniques and
quality circle participation. Department team received site recognition.
. Established chemical audit team which led to site compliance and zero
violations at year end.
Manufacturing Engineer 1978-1984
Responsible for test and inspection of printed circuit board sub-composites
and technology cost planning.
. Developed semi-automated circuit board inspection station resulting in a
25% reduction in labor.
. Implemented a defect forwarding technique which eliminated repair and re-
test operations resulting in a 10% reduction in Base Manufacturing Cost.
. Provided logistical solutions that reduced finish cost up to 20%.
Education
B.S., Finance, SUNY at Utica/Rome, New York.