Sarosh A. Siddiqui Tel: 786-***-****
nd
***** ** * ******, ******** Pines, FL 33025 E-mail: acgjho@r.postjobfree.com
OBJECTIVE: To obtain a position in an engineering/management field. Seek exposure to all projects, including
all phases of construction (planning, estimating, scheduling, cost analysis, safety, and management).
WORK EXPERIENCE:
CHARLIE FRYMYER PAVING, FLORIDA, USA August 2014- Present
PROJECT ESTIMATOR
FORT- LAUDERDALE INTERNATIONAL AIRPORT IMPROVEMENTS PROJECT
• Responsible for quantity take-offs on Division 2 (site work) for projects ranging for projects over $15
million.
• Quantity Take-Offs of projects ranging from $25,000 to $15 Million for site work, underground utilities,
concrete, landscaping and irrigation.
• Estimated projects according to codes and specifications of city, county, state, and FDOT.
• Identified the quality of materials and equipment from construction specifications.
• Prepared bid packages and proposals as a prime bidder or subcontractor for private and public owners.
• Sent drawings and specifications (ITB) to suppliers and sub-contractors for their proposals.
• Negotiated prices with sub-contractors to their satisfaction in order to perform a job successfully and build
the long lasting relationships.
• Reviewed proposal specifications, drawings, attended pre-bid meetings, etc. to determine scope of work and
required contents of estimate.
• Coordinates total estimating effort relevant to a particular bid/project as assigned using different Estimation
software.
• Reported to project manager in a weekly meeting for project estimation status, such as quantity take-offs,
budget, proposal issues, etc.
• Assisted Project manager with performance reviews.
• Reviewed design options and recommends best solution based on cost, engineering quality, or availability of
materials.
• Coordinated with other members of the estimation team to prepare and to confirm the complete scope of work.
• Partnered with other estimators to turn project over to execution team and worked as an APM later.
• Established and upstream schedule for introduction of technical documents in accordance with coordinated
planning.
• Established monthly plans.
• Established catch-up programs in case of delays.
• Coordinated with Client, Consultant and different sub-contractors. Also, ensured execution of drawings as per
standard and quality.
• Daily reporting of the progress report and co-ordination with the construction team.
• Supervised and monitored assigned site works as per the approved shop drawings and as per instruction of
project engineers to complete the project within stipulated time
• Submitted site daily reports, inspection requests, estimates and all applicable monitoring reports on regular basis
or as required by the project engineers.
• Managed directly and provide engineering and technical supports to all the civil work groups at site.
FRONTIER WORKS ORGANISATION, PAKISTAN DECEMBER 2011- AUGUST 2013
PROJECT ENGINEER
DHA PHASE VIII INFRASTRUCTURE DEVELPOMENT WORKS
Construction of Roads/Streets, Storm water drain, Utility Chambers, Pipe sleeves, Kerb Blocks, Pavement
Marking, Traffic Signs, Water Supply, Sewerage Network and pipe lines, outfall drain, and out fall Chambers
& Culverts
• Establishes overall coordinated execution plan for all sections.
• Obtains approval of project management of sequence and duration of activities.
• Provides detailed plans per section.
• Establishes and upstream schedule for introduction of technical documents in accordance with coordinated
planning.
• Performs site visits to monitor the plan follow up and to report blockages.
• Monthly report to the client with photos of the progress
• To establish proper and effective communication modes among different stakeholders involved in the project
and to streamline the dispelled components necessary for the project success.
• Involve in site execution, periodic reporting to higher management, co-ordination in design development,
verification of subcontractor's claims and payments.
• Coordination with Client, Consultant and different sub-contractors. Also, ensuring execution of drawings as per
standard and quality.
• Daily reporting of the progress report and co-ordination with the construction team.
• Supervising and monitoring assigned site works as per the approved shop drawings and as per instruction of
project engineers to complete the project within stipulated time
• Implementing the site work In accordance with issued for construction drawings.
• Submitting site daily reports, inspection requests, estimates and all applicable monitoring reports on regular
basis or as required by the project engineers.
• Assign the Foreman/Supervisors to smaller packages of the assigned work for effecting control.
PRECISE CONSTRUCTION PRIVATE LIMITED, PAKISTAN
INTERNEE- SITE ENGINEER Dec 2009 - Jan 2010
Experienced stress analysis and several strength tests. Cost and Quantity Estimation and Designing of the Building along
with different report submissions including laying of underground utilities and associated civil works.
NATIONAL ENGINEERING SERVICES PAKISTAN (NESPAK)
INTERNEE-ROADS AND BRIDGES June 2010 - July 2010
Surveyed traffic analysis report and worked on Drawing of Girders of Bridges and several site visits.
FINAL YEAR PROJECT
Norcheral Structures December 2010 – December 2011
Design Management Integration of building structures using Building Information Modeling (BIM) through TEKLA
software.To study the Impacts of different Project Management aspects on a real life industrial Project using software by
3D Modeling.Project Manager with Program Management
EDUCATION: Florida International University, Miami, FL, USA
Master of Science in Construction Management
GPA 3.7/4.0 Graduation: August 2014
NED University of Engineering & Technology, Karachi, Pakistan
Bachelor of Science in Urban Engineering
GPA 3.4/4.0 Graduation: December 2011
SKILLS:
Certified Course on Primavera Project Management (P6) from Pakistan Skill Development Council,
Karachi, Pakistan
Experience of using Timber line software
On screen Take off
VU 360 Estimation software
Plan swift Estimation software
Certified Course on AutoCAD Civil 3D Software Building Information Modeling (BIM) solution for Civil
Engineering Design and Documentation from NED University of Engineering & Technology Karachi,
Pakistan in collaboration with Auto DESK
Certified Course on ArcView GIS Analysis and Mapping; Spatial Distribution of Phenomena from NED
University of Engineering & Technology Karachi, Pakistan
Certified Course on Microsoft Project 2007 from NED University of Engineering & Technology Karachi,
Pakistan
Microsoft Word, Excel, Power Point, Outlook, Adobe Photoshop, MS Project and Windows OS.
Always motivated and eager to learn new software
MEMBERSHIP & CERTIFICATION:
Florida International University, Miami, FL
U.S. Department of Labor
Occupational Safety and Health Administration
OSHA-30 Hour Construction Industry Outreach Program, 2014(Expected)
American Society of Professional Estimators
American Society of Civil Engineer
Associate Member of ACI Technical Committee 347
Student Member of National Society of Professional Engineers
Student Member of Association of Building Engineers
Student Member of Institution of Civil Engineers
American General Contractors
Certified Engineer
Pakistan Engineering Council, 2012
ACTIVITIES/AWARDS
• International Peer Mentor Volunteer Fall 2013
• Associated General Contractors (AGC) FIU Media Manager Fall 2013
REFERENCES:
Available upon request.