PHONE US 843-***-****
E-MAIL acgh3u@r.postjobfree.com
acgh3u@r.postjobfree.com
Date of birth: Oct 7th 1977
Mobile phone 843-***-****
Eng. Moises Augusto Garcia Perez
Objective To get more experience in the working sector and to develop in
o
the field.
Education 1995 – 2002 ITESM Campus Cd. Juarez & Campus Laguna
BS Degree IIS, Industrial Engineer
2008 - 2010 ITESM Campus Sonora
Master - Quality and Productivity
Work experience Nov 2012 – To present UTC / OTIS (Elevator Manufacturer)
o
Florence SC New Products – General Supervisor for
Mechanical Engineers
Sep 2008-2012 UTC / OTIS (Elevator Manufacturer)
o
Nogales Sonora New Products –Sr. Project Manager
May 2002 – Sep 2008 GENPACT / EDM
o
(EDM- General Electric) Cd. Juarez Ch.
Operations Manager. Pre roles: Production Supervisor and Black Belt
Dec-May 2002 Sigo Forwarding El Paso, TX
o
Logistics Supervisor- General supervisor
Jun-Dec 2001 Saturn Electronics de Juárez Cd. Juárez, CH
o
Internship- Six Sigma, Times and movements, Line balancing
Courses Jan 2001 - “Systems Design Course” (USI) Lugano, Switzerland
March 2003 - Leadership course GE Mexico city, Mexico
Sep 2003 - Project Management course GE Mexico city, Mexico
Aug 2004 - GE DMAIC Training for Black Belts GE Juarez city, Mexico
Oct 2004 - World Class Supervisor course GE Juárez/UTEP
Jul 2006 - GE BEL’s (Building Essential Leadership Skills) GE Atlanta, US.
Jul 2009 – MOST Training UTC – Nogales, Mexico
Languages Spanish – Native Language English – 95% verbal, 95% grammar
New Product Project Manager (UTC – Otis – Nogales & Florence)
Summary of skills
Manage a team of 10 mechanical engineers to increase efficiency
through new changes implemented and operational process savings.
Support/coordinate the implementation following NPI projects 2013:
As NPI member, led transition of Mex mechanical factory plant
o
(80+ FTE) to Florence SC in less than 3 months implement 50%
of processes during time frame and budget consider.
Implement new product G2S R1/R2 during timeline and with
o
cost saving projection of 33% at factory base on last cost model
comparing with G2L. (1 contract reduce price from $47k to
$33k) G2S 2012 EAU- 150 contracts – x $14k estimated saving
= $2.1M
Implement 3 projects on 2009 by re-design elevator concept
o
getting cost benefit of $10MM. Project requirements on sheet
metal, cut, bend, clinch, weld and paint process.
- G2S R1/R2 (Cost savings Full Year Material & Labor $2.1M:
- CA's Implemented:48 affecting 280 parts lines for plant 2.
- Test files validation:10/10 - PFMEA – 8/8 Implemented
- Ship 1st mfg pilot on Nov 2011 - PQCS – 70% for make & buy
- Process flow diagrams and BOM loaded per CN’s released
- Tooling and fixtures implemented not exceeding CAR budget
- Ensure long and short lead time material for pilots build
- G2S-Rel 2(Cost Savings):Full Year Material $228K Labor: $1.8M
-PP3-4 Meeting with Nogales staff on 3/8. With Otis staff on 3/11
-Ship 1st mfg preseries on 2/19 to Bloomington test tower
-CA's analyzed: 14 impacted 83 parts and 160 arragements approx
-Test files validation:6/6 - FMEA/Control plan: 8/8
- Updated Work Instructions: 12/12 - Turnbacks: 16/26
- PQCS: 83/83
- Hydro LC Cab (Design changes for single mechanic installation, cost
savings = $150k- $200k)
- Build prototype and stop due focus on G2L 350fpm project
- Hydro LC Car frame (annual savings = $250k- $300k.)
- CA affecting 22 new parts and change arrangements
- Build prototype and stop due focus on G2L 350fpm project
- Expected to build preseries on May 2011
-G2L Phx concept (36% mtrl, 40% installation cost reduction
“No Touch” configuration in CLC)
- Build 1 prototype duty 3000 at end Nov2010
- As team member support NPI team by achieve 25 success ACE stories
including 1 implemented through the packaging event were 1 crate is
eliminates getting savings of $105k
Operations – Process Manager – (Genpact, Juarez Chih.)
Managed operation team (174 direct associates and 13 indirect
o
between Caborca Sonora & Juarez) and running production lines
for multiple customers within General Electric Money
Corporation ($3.4M Annual Revenue-2007).
My team is directly responsible to capture cardholder
o
information from application requests for different worldwide
stores such as: WalMart, JCP, Lowes, Gap Inc, Chevron just to
mention a few. Part of the service is 24 hrs response time
delivering with 99.75% quality level in data entry. In addition,
we provide 10% of previous year revenue in productivity
projects
Actively promoted and applied Lean methodology in the process,
o
mentoring teams to produce bottom line impact. On 2007 we
deliver $525K productivity on different projects worked jointly
with GE.
Implement OCR technology for data entry. Tool recognizes 70%
o
of characters. Project provides annual cost savings of $225K to
GE.
Increase 200%productivity for Keying POR/Application forms
o
using IT technology of packets between GE/Genpact platform.
124-rate/hour increases to 800. Project provides annual cost
savings of $173K to GE/Genpact
Processes ends with 38.2% in margin thanks to the cost
o
reduction and process control implemented by the team across
the service-process to different customers.
Works with Finance team to assign costs for new process
o
introduced and opportunities identified by GE.
Customer evaluation is done through the voice of the customer
o
survey every 6 months and we consistently been up to 90% of
acceptance about our performance for past 3 year.
Black Belt Role-Completed requirements for BB certification;
o
Projects delivered visible and tangible results for Genpact and
facilitated customer price reduction. Cost reduction project focus
to reduce idle time (Result: $228K annual cost reduction)
Productivity gains helped the business accommodate resources
o
to new incoming projects with out impacting existing
performance and with no new hiring- 12 FTE reassigned and 2
Supervisors.
Supported difficult transitions applying Six Sigma rigor to control
o
variation. Visit customer sites to map/document and develop
FMEA for businesses like NISSAN, NBC, GE CEF, eBay in
conjunction with members of GENPACT Americas & India .
Reference
Eng. Luis Castillo - Industrial Engineer & NPI Mgr
UTC Otis
mobile: US 520-***-****
acgh3u@r.postjobfree.com