RAYMOND LEVINE
Master Electrician
****** Highway 101 West
Port Angeles, Washington,
98363
Home: 360-***-****
Cell: 360-***-****
Email: acgh0m@r.postjobfree.com
OBJECTIVE
To obtain a position in the electrical/ maintenance/ supervision field
which will offer long term career growth and challenge, while utilizing my
established electrical skills for the overall enhancement of the
organization.
QUALIFICATIONS
. Over 27 years of progressive electrical experience.
. Has served in every capacity as an Electrical Industry Tradesman
ranging from: Electrical Inspector, Electrical Superintendent,
Electrical General Foremen, Electrical Foreman, to an Electrical
Journeyman Worker.
. A hard-working, conscientious, safety minded individual who will take
the initiative.
. Years of experience laying out and running work, bending and
installing all conduit, cable tray, duct-bank, re-lock, armored cable
of all trade sizes, fabricates pipe racks & panel stands, wire feed
welds, pulling cable and wire of all trade sizes (to include fiber
optic cable). Installs switch gear, transformers & pads, disconnects,
sub-panels, panels and any type of junction box or condulet.
WORK HISTORY
Site Manager/ Waste Handler Supervisor
Nov 2013-Sep 2014
Parsons SCWEP Project
100 West Walnut Street
Pasadena, Ca. 91124
Office-626-***-**** (Andrea Sobel, TM)
Cell-240-***-**** (Stephen Depew, SCWEP PM)
Cell-360-***-****
acgh0m@r.postjobfree.com
. This position consisted of being the Parsons POC in direct support of
ECBC on the SCWEP Project while deployed on the MV Cape Ray for
destruction and disposal of the Syrian Chemical Weapons.
. Executed all orders as assigned by the Parsons PM (Mr. Stephen Depew).
. Effectively communicated between ECBC Management and Parsons
Management to meet Project Goals, Time Lines as well as to help
develop solutions to problems and schedules.
. Supervised 13 Waste Handlers in direct support of ECBC (Edgewood
Chemical and Biological Corporation), transferring, accurately
recording chemical quantities and pumping (confined space) effluent
from FDHS's to the titration tanks down to lower decks storage
chemical storage tanks.
. Supervised IT SCWEP Communications (Provided by Triple Canopy) in
support of the SCWEP, MV Cape Ray Crew and Project Personnel deployed
on the MV Cape Ray.
. Worked in support as needed as independent third party for the weekly
accountability of Prescription Medication Counts.
. Participated in all ship board drills and alarm conditions as
required.
. Supervised and managed shift leads, verified all Parsons Daily Project
Reports, verified time cards, safety meetings, and personnel issues as
required.
Journeyman Electrician
Sep 2013 - Nov 2013
Straits Electric
PO Box 2914
Port Angeles, Wa., 98362
President/ Owner: John Tucker
. While employed with Strait's I've performed generator and transfer
switch installations; along with the associated installation of
conduit, flex, breakers, pulling and termination of all conductors
related to each project.
. At Strait's we've routinely provided shore power to merchant vessels
in access of 800ft in length when pulling into Port Angeles for
maintenance. We've performed preventative maintenance on these ships
such as the meggaring of 118 individual motors (located throughout the
vessel) from theirs motor control center (MCC) to each motor. All work
is routinely performed under a compressed time schedule and
successfully completed within the ships allotted time frame.
. Additional projects at Strait's include the electrical installation of
"Logging Truck Lifts" and all the associated electrical components
(Panels, pcv conduit, fittings, disconnects, transformers, reversing
contactors, pendant controls and limit switches), Exterior Commercial
Building Illumination jobs, Parking lot lighting; as well as New
Custom Home Electrical Installations.
Journeyman Electrician
Aug 2013 - Sep 2013
CLP
13028 Interurban Avenue S., Suite 112
Seattle Wa., 98168
Lead Trade Recruiter: Kevin Johnson
acgh0m@r.postjobfree.com
. Lakeview Elementary School, Auburn Washington: Installed conduit and
other raceway systems, pulled branch circuit conductors. Installed
raceway and branch circuitry for walk-in coolers and walk in
refrigeration units, pulled, terminated and tested all new LED parking
lot lighting. Reworked existing branch circuitry to accommodate
remodeled areas of the school. All work was executed and completed
within a compressed time schedule enabling the facility to open on
time for the new school year.
Electrical Inspector - USACE Contract -Task Force Power Oct
2011- Apr 2013
TENG & Associates
205 N. Michigan Ave.
Chicago, Il.,60601
Afghanistan Kandahar Office: 703-***-****
Project Manager/ President: George Bouris
Site Lead: Shane Deek
. Working as a part of a two man crew to Inspect, Report and Correct LHS
(Life, Health & Safety) issues for Task Force Power at FOB Kandahar
Air Base, Afghanistan and the surrounding US Military Regional Command
South's FOB's and COB's.
. Reviews all Task Force Power's current Technical Directive Bulletins,
the 2008 NEC and executes electrical inspections, reporting and
performs immediate corrections of any identified LHS at Kandahar
Airfield and surrounding RC South AO as assigned.
. Some of the major priorities of this project that are inspected,
identified and immediately repaired to protect U.S. and Coalition
Forces are: Grounding and Bonding, Impedance Testing of GFCI & RCD/
RCBO circuit breakers, GFCI & RCD/ RCBO protection in all Wet
Facilities, Equipment Compatibility, Locations and Wiring Methods are
also inspected and corrected as required.
. Examples of Structures and Equipment Inspected and Repaired are: Joint
Operation Centers, Tactical Operation Centers, Dining Facilities,
MWR's, Hospitals, Airfields, Fuel Farms, Sewage Lift Stations, Water
Pumping Facilities, Billeting, Offices and Maintenance Areas,
Generator Load Terminations, Transfer Switches (MTS), Main
Distribution Panels (MDP's), Sub Distribution Panels (SDP's) to
Consumer Distribution Panels (CDP's).
Electrical Superintendent-LOGCAP 4 FOB Shank
Jan 2009- Oct 2011
Fluor Government Group
100 Fluor Daniels Drive
Greenville, South Carolina, 29607
703-***-**** Afghanistan Office
. Working as an Electrical Superintendent; and in its earlier stages
charged with the assessing, designing and over seeing all of the
electrical O&M and construction build out on FOB Shank East in
Afghanistan.
. Functions as the Electrical subject matter expert for FGG on FOB Shank
East.
. Developed and executed time lines required to successfully complete
electrical work within the given time lines. Supervises and
prioritizes the electrical material and man power needs for various
ACL's, CO's and LOTD's issued by the government.
. Prepares and maintains all "as build" electrical distribution system
drawings of any electrical work installed by the FGG on FOB Shank
East.
. Interacts daily with the different U.S. Army representatives to
formulate electrical solutions and safely execute electrical solutions
to accommodate their desired needs.
. Over sees all O&M electrical services on FOB East Shank.
. Effectively communicates with the Engineering and Procurement
departments to ensure the timely ordering and arrival of electrical
parts and materials.
. Performs electrical technical inspections to identify deficiencies
requiring correcting prior to assuming O&M operations on various
structures and facilities.
. Performs Electrical Phase Inspections (as directed by Army Contracting
Office's Letter of Technical Directions) on electrical work being
performed by U.S. Army Troop Labor, Local National Contractors and
other U.S. Army Sub Contractor's. Record and submit all NEC
deficiencies on the provided Phase Inspection Form.
. Coordinated, ordered all electrical material and executed the
electrical construction phases of LSA's (Life Sustainment Areas) and
1500 man DFAC's (Dining Facilities) on FOB Shank in Afghanistan.
. Coordinates, performs and records the electrical inspections required
by contract as needed; to include all of the O&M departments meter
calibration dates.
. Continually performs and monitors ohms to ground readings over all
areas of FOB East Shank; and ensures ground readings remain within
tolerances as required.
. Actively participated in the construction of over 505,000 sq ft of
Expeditionary Airfield runway, taxi ways, and maintenance bays and
parking hides.
. Required to attend and provide subject matter expert direction in the
expansion of FOB Shank up and coming projects.
. Provides "boots on the ground" field information to the FGG
Engineering Department when required.
. Works daily with MAXIMO opening and closing work orders, ordering
materials for jobs and MRF's.
Master Electrician-Parsons CMC Project, Iraq
Sep 2005-Dec 2008
Parsons
100 West Walnut Street
Pasadena, Ca. 91124
626-***-**** (Ca. Office)
256-***-**** Iraq Office
256-***-**** Iraq Office
acgh0m@r.postjobfree.com
. Tasked with accessing, designing, ordering and providing all
electrical installation oversight on the CMC Camp Victory Compound's
new 2400amp Electrical Distribution System. The work in this
particular project included the installation of a 1 megawatt generator
and associated equipment ranging from: setting of fuel tanks,
transfer switch, MDP, SDP's, Sub-panels and all cabling, cable trays
and fabrication, terminating and testing. Maintains all "up to date"
site "as built" drawings and the "new" Electrical Distribution
System's One Line Diagram.
. Coordinated (between Fluor Daniels and Parsons) the installation of
Prime Power (Fluor Daniels) to the CMC Camp Victory Compound; while
simultaneously coordinating the Synchronization of 4-500kva generators
to the compound with another subcontractor (IAP). All this work was
performed with minimal to no down time to the client (U.S. Army Corps
of Engineers).
. Effectively communicates all CMC Camp Victory Compound's electrical
distribution work with the Victory Base Utilities Director. The
Victory Base Utilities Department requires "up to date drawings" at
all times.
. Actively participates in the assembly and break down of mobile team
camps (LSA's-Life Sustainment Areas) and assets.
. Field designed and installed a Static Grounding Discharge System for
the de-arming missiles warheads at CMC Camp Arlington.
. Performs all "TCN Electrician Interview's" and hiring for mobile team
electrical staffing.
. Provides all field electrical oversight on the initial setting-up and
breaking down of the CMC Projects mobile team sites electrical
equipment (for relocation).
. Performs Mobile Team "site visits" to identify and over see any
electrical issues that require "immediate" correction.
. Performs and provides CMC Project electrical "technical" information
(to include load calculations, related materials and equipment).
. Tasked with the drafting of "Task Specific" SOP's (Standard Operating
Procedures).
. Tasked with drafting and reviewing "Task Specific" SOW's (Scopes of
Work) for equipment and structures utilized for "Life Support" on the
CMC Project.
. Performed Quality Control inspections on structures in Kuwait prior to
shipment into theater.
. Works in support of the "CMC Project Safety Manager" on all electrical
related issues. Ensues all monthly, quarterly and annual electrical
inspections are disseminated throughout the project.
. I have supported the CMC Camp Victory Compound by serving as Site
Manager/ Coordinator for R&R and Emergency Leave coverage since 10 Sep
05.
. Planned and supervised the set up of the new COE's CMD (Coalition
Munitions Disposal) Compound at the US Army's FOB Hammer (10 Sep 08 -
23 Sep 08). This work included power generation w/shade structures
over generators, latrine plumbing requirements, water storage and
distribution, living units, offices, mwr, relocation of force
protection as required in the LSA itself, exterior compound
illumination, the construction of a lay-down yard/ vehicle maintenance
area; and the construction of approximately 2200 linear feet of HESCO
baskets to secure the areas.
. I have completed all the required Parsons University "On Line Safety
Training" for 2005, 2006 and for 2008. I've completed the Parson's
PACE Courses that was identified as one of my goals; on the latest
2008 Employee Performance Review.
. Continues to serve the CMC Project in whatever capacity may be
required; to the best of my ability. I have supervised the
construction of 60'L x 60'L x 27' H maintenance tents; complete with
all utilities.
. I continue to support the client in any way possible; while never
compromising Parson's best interest.
Electrical Foreman - Halliburton KBR, Baghdad, Iraq
Oct 03 - Sep 05
601 Jefferson Street
Houston Texas, 77002
. Supervised American, TCN and LN Electricians in O&M, re-modeling and
new construction installations at U.S. Army forward operating bases
throughout the Baghdad area of operation.
. Duties included; but not limited to the initial camp set-ups, breaking
down camps and assets, installing MDP's, transfer switches, SDP's, sub-
panels and all related equipment on Camps Dragoon (D-8), Baghdad
Island (D-10), and War Eagle (D-1A).
. During my tenure with KBR I have also served in the capacities of Camp
Manager and Chief of Services; while covering for R&R's.
. Promoted to Incineration Group Site Supervisor in November, 2004 at
Camp Liberty, Iraq. As Incineration Group Site Supervisor I was tasked
with supervising the assembly of 2-30 ton per day municipal
incinerators.
. I attended and passed the Victory Base Camp's "Fire Warden Class" in
January 2005.
. Promoted to Incineration Group Manager for D, F and I Sites in June 04
after the commissioning of the Liberty Incineration Site. While
Incineration Group Manager I planned and managed the erecting of the
Site "I" 30 ton per day incinerator. Developed the Incineration Site
SOP and the 30 ton per day incinerator SOP.
Owner / President, Levine Electric, Inc.
2001-2003
7065 Kaitlin Court
Colorado Springs, Colorado, 80922
. This company was established in May 2001. Levine Electric's work
ranged from; but was not limited to the commercial electrical industry
down to residential electrical work.
. As the Owner and President I performed all the company's estimating,
work and billing.
General Foreman / Foreman, Berwick Electric, Inc.
1996-2000
. Originally hired as an Electrical Journeyman and was promoted to a
Foreman and then on to a General Foreman.
. When employed with Berwick I served in the Service Department, worked
in the Contract Department as an Journeyman Inside Wireman on various
projects, promoted to an Electrical Foreman working in Computer
Processing Plants, Computer Room "Hot-Sites", Fabrication Floors and
Labs, promoted to Electrical General Foreman where I ran electrical
work in access of 1.5 million USD (8 story loft apartments/ commercial
retail/ mixed use and parking structures).
Journeyman Electrician, Ludvik Electric
1996-1996
. When employed with Ludvik I worked on the Rockwell Project (now known
as Intel). I worked as a member Ludvik's switch gear crew installing
two of the four 2400amp Main Distribution Systems. We set the gear,
ran the conduits exiting the Main Electric Room for feeding: cable
trays, sub-fabrication floor buss ducts, MCC Centers and
transformers.
Journeyman Electrician, Bechtel Inc.
1996-1996
. When employed with Bechtel I worked installing communication cable
tray, conduit and motor control branch circuitry on the Hermiston,
Oregon Co-generation Project.
. Additional employment information available upon request.
I.B.E.W. Local Union 113
1985-Present
2150 Naegele Road
Colorado Springs, Colorado, 80904
EDUCATION
. Seacor Anaerobic Fiber Splicing Certified
1995
Berwick Electric, Colorado Springs, Colorado
. Certified Arc Wire-feed Welder and High Voltage Splicer
1990
Falcon AFB, Co.
. National Apprentice Joint Training Program
1985-1989
I.B.E.W. Local Union 113
414 West Pikes Peak
Colorado Springs, Colorado, 80904
. Roy J. Wasson High School
Graduated-1978
Colorado Springs, Colorado
LICENSES AND CERTIFICATES
. Journeyman Electrician - Colorado License #9758 - September 1989 to
present
. Journeyman Electrician - Washington License EL01 #LEVINRL055RB - July
2013 to present
. Master Electrician - Colorado License #26435 - March 2001 to present
. TWIC - Valid to April 2018
. OSHA 10 - February 2013
. OSHA 40hr HAZWOPER Training, January 2014
. OSHA 8hr HAZWOPER Supervisor Training, February 2014
. OSHA Confined Space Awareness Training, February 2014
. OSHA Hearing Conservation Training, February 2014
. OSHA PPE Program and Selection Training, February 2014
. OSHA Respiratory Protection Training, February 2014
MILITARY
. USN Active Duty 1980-1984 "Honorably Discharged"
USS Nassau, Air Department, V-1 Division, ABH-3
Graduated Aircraft Firefighting and Rescue School, NAS
Millington, Tennessee
1981.
. USNR 1987-1991 "Honorably Discharged" as a CE2
Naval Construction Battalion 2, Ft. Carson, Colorado