MARTHA ESTELLA TUBMAN
*** ***** ***** ** ** / Leesburg, VA 20176
HYPERLINK "mailto:acggaa@r.postjobfree.com" acggaa@r.postjobfree.com
CLEARANCES:
DOD: Secret
DHS: Secret
SUMMARY
** ***** ** ***erience as a QA Analyst, testing web base and client server
applications
2 years SAP testing implementations.
2 years Manual Penetration Testing for Web Applications
10 years experience infrastructure testing.
6 years Business Object testing.
3 years IBM Rational Tools-- Rational Quality Manager, Rational Functional
Tester and Rational Performance Tester.
Performed UAT: Select test cases, selected users to participate in testing,
monitor testing, acted as SME, reported results.
Experience testing billing systems. Creating test cases from requirements
and performing manual test. Experience with Billing System (ICOMS).
Developing Test Plans and Test Cases, Developing a test strategy including
acceptance criteria, testing scheduling, outlining need scenarios,
identifying testing environment.
Experience in conducting Stress testing (database, network and
infrastructure). Experience in conducting User acceptance testing.
Coordinating test execution and documenting results.
Experience coordinating issue resolution process and regression testing.
Experience conducting test readiness and weekly test status meetings with
developers and engineers.
Experience coordinating test bed set up with engineers and developers.
Experienced with all QA methods including IEEE.
Quality Center (QC), Quick Test PRO (QTP)
PVCS Tracker
Create test case data using SML
Report and track incidents (defects) in Clear Quest, DOORS
Documenting Product designs
Unit Testing, System testing, Functional testing, UAT
Documenting and reporting all discrepancies in the software using
Rational's Clear DTTS V4.5. Version control and management of all test
Steps/ABF's, procedures and documents using Rational's Clear DTTS V4.5.
Detail oriented and resourceful.
Problem solver, motivated self-starter and an excellent team player.
Excellent written and oral communication. Able to quickly acquire and apply
new skills. Organized, efficient and dependable.
ASAP: Accelerated Systems Application and Products in Data Processing
SDLC: Software Development Life Circle,
.net framework 4.0
SKILLS / TOOLS:
Software Development Life Cycle (SDLC)
Languages: Visual Basic, SQL, HTML 4.0, and Java Script, C, C++,
Basic, Cobol, SQL Queries
Software: Adobe Photoshop, DB Artisan and TOAD (Tool for Oracle);
DOORS
Database: MS Access 97, Sybase and Oracle
Hardware: BM PC's and Compatibles, Pentium PC, IBM and Unisys Main
Frame
OS: MS-DOS, MS Windows, Windows 95, Unix and Windows NT, XP.
Packages: MS Office '07, 00; S PowerPoint, Word Perfect 6.1.
Tools: Quality Center; QTP; Silk Test and Silk Performer;
PVCS Tracker SQA 5.0; Rational Robot, WinRunner Pro and Rational
Software - ClearDDTS Version 4.5 bug tracking tools; ClearCase to
manage all Testing documentation. Business Objects, Microsoft Projects
for Project lanning and Reporting Testing status. Clarify, FrontPage
98/2000, MS Visio 2000,Developer 2000, Ms Office 2000, Install Shield
Web Servers: IIS 4.0/5.0,Web Sphere Netscape, Explorer, AQUA DATA,
JXplorer, Tevoli, Metadata Repository.
EDUCATION:
Strayer University Master of Science, Information
Systems - June 2001
University of Georgia - Athens, GA Bachelor of Science, Consumer
Economics - June 1996
Dorsey Business School Taylor, MI Certificate in Computer Programming
(Cobol and Basic)
EXPERIENCE:
Sr. QA Analyst
SPS - HP - Herndon, VA Oct.
2012 to Nov.. 2013
TEST DOD
SPOT, TOPSS (Agile)
Review and Decompose high level requirements in Quality Center
Design and develop Test cases in Quality Center
Analyzed requirement to create testcases.
Tests executed to Verify and Validate SSO and CM patient data.
Test Business Objects 6.x.
Created Requirements Traceability between Requirements, Test cases, Test
Lab and Defects.
Defect Tracking and Retesting
Communicate with multiple teams during requirements decomposition.
Test case development and Test execution.
Performed UAT: Select test cases, selected users to participate in testing,
monitor testing, acted as SME, reported results.
Performed manual test for functional applications.
Performed infrastructure testing DOD applications.
Tested application on .net framework 4.0
QTP- recording and running scripts.
Use SQL to verify data enter into functional applications. Also used SQL to
get data for testing.
QA LEAD
Nov. 2011 to June 2012
EDC - DOD - McLean, VA
Provided test leadership for SAP Metadata Repository (Agile)
Writing test plan
Creating test strategy to test applications.
Analyzed requirements to create test cases.
Created Requirements Traceability between Requirements, Test cases, Test
Lab and Defects.
Defect Tracking and Retesting
Communicate with multiple teams during requirements decomposition.
Perform manual test for functional applications.
Performed UAT: Select test cases, selected users to participate in testing,
monitor testing, acted as SME, reported results.
Leading test, supervising 3 testers.
Monitoring testing activities and reporting on status and key issues to
project management.
Timely and accurately creating weekly Status Reports to submitted to the QA
manager.
Attend all status meetings for which I am the Primary tester.
Use SQL to verify data enter into functional applications.
QA TEST ENGINEER/ TIER II Help Desk
Synerfac - FEMA - Fairfax, VA Oct.
2010 to Sept. 2011
COTS Product
Responsibilities:
Review and Decompose high level requirements in Quality Center
Design and develop Test cases
Tests executed to Verify and Validate FEMA applications (Agile)
Perform manual test
Manual Penetration Testing of Web Applications
Test Business Objects
Performed UAT: Select test cases, selected users to participate in testing,
monitor testing, acted as SME, reported results.
Created Requirements Traceability between Requirements, Test cases, Test
Lab and Defects.
Automation testing using RPT
Defecting using Clear Quest, AQUA DATA, JXplorer, Tivoli
Defect Tracking and Retesting using QC.
Communicate with multiple teams during requirements decomposition,
QA TEST ENGINEER
N-tieractive - Reston, VA
April 2010 to Oct. 2010
DOD Health SSO-CM System
Currently working on DoD SSO-CM Program to validate the Single Sign On and
Context Management of various Military Health Systems. COTS Product
Responsibilities:
Review and Decompose high level requirements in Rational Quality Manager
Design and develop Test cases in Rational Quality Manager
Tests executed to Verify and Validate SSO and CM patient data.
Performed infrastructure testing.
Manual Penetration Testing
Test Business Objects reports.
Perform manual test on web-based applications.
Performed UAT, selecting users to participate, monitor testing, create UAT
results and reports
Created Requirements Traceability between Requirements, Test cases, Test
Lab and Defects.
Defect Tracking and Retesting using Rational Quality Manager
Communicate with multiple teams during requirements decomposition,
Test case development and Test execution.
TEST ANALYST
YOH/Lockheed Martin - Centerville, VA
Oct. 2009 to March 2010
Working on DoD IGC Program
COTS Product
Writing test cases, Manual testing, Data warehouse testing, White box
testing, Black box testing.
Teradata, Oracle, Informatica, Business Objects, PowerCenter, My
WebMethods, WebMethord
TEST ANALYST
Binary Group - Alexandrian
July 2008 to Oct. 2009
Army Contract- Testing GFEBS
COTS/GOTS Product
Conduct the Test Case Inspection - Verifies that all identified defects and
action items have been sufficiently resolved
Testing SAP - using HP Quality Center 9.2 (on Citrix server) for running
manual test and defect tracking.
Testing SAP modules: FI, CM, FM, RM SC, PPE
ASAP Methodology
The Test Analyst assists the GFEBS program by providing testing skills and
process management knowledge in support of ERP solution testing. The Test
Analyst supported the Test IPT Lead in providing support to the Functional
and Technical Teams in advising on proven testing practices and procedures
for an ERP implementation.
The Test Analyst supported the Test IPT Lead on thorough solution testing
confirming business requirements, DoD and Public Sector standards and
policies are met and satisfied. The Test Analyst updates and maintains
version control project office documents as part of a large Finance Systems
initiative within the US Army. The documents produced as part of this
position include a Test and Evaluation Master Plan (TEMP), Strategy
document, Working Integrated Product Team (WIPT) Contact List, T&E
briefings, and Minutes for all T&E meetings. The Test Analyst maintained a
catalog of over 2500 test scripts, the logs associated with the execution
of these test scripts and the test results for more than 2800 technical and
functional requirements tests.
Roles and Responsibilities:
Support the Test IPT Lead in overseeing all phases of testing.
Support the establishment of testing standards, procedures, documentation,
and tools for all phases of ERP Program testing.
System Integration Engineer
Edge Tech. Services - IBM (US Customs), Tysons, VA
Dec 2006 to Jun 2008
IPT Lead
Test Lead - supervising staff of 15
Provide ongoing guidance to testers.
Developed over all test Strategy.
Ensured 100% requirements coverage.
Conduct the Test Case Inspection - Verifies that all identified defects and
action items have been sufficiently resolved
Testing SAP PM, CRM
Writing Test Cases using Quality Center 9.2 for test and defect tracking
Defect reporting and tracking using Dimensions.
Used Load Runner 9.2 for stress and performance testing.
Use SQL to verify data enter into functional applications. Also used SQL to
get data for testing.
SR System Test Analyst
Fannie Mae, Herndon, VA Mar
2006 to Nov. 2006
Test Director, Quick Test PRO
Create test case data using SML
Report and track incidents (defects) in Clear Quest, DOORS
Unit Testing, System testing, UAT
Testing Financial Reports - Crystal Reports
Writing Test Cases using Quality Center 7.0
WinRunner 7.0 for regression testing
Defect reporting and tracking using Clear Quest
Writing accurate Test scripts and Test cases.
Use SQL to verify data enter into functional applications. Also used SQL to
get data for testing.
Performed UAT: Select test cases, selected users to participate in testing,
monitor testing, acted as SME, reported results.
Monitoring testing activities and reporting on status and key issues to
project management.
Timely and accurately creating weekly Status Reports to submitted to the QA
manager.
Attend all status meetings for which I am the Primary tester.
Lead QA Analyst
CACI, Chantilly, VA June
2004 to Feb 2006
Test Director, QuickTest PRO
Test Lead for DOD Application
Test Business Objects Reports.
Performed infrastructure testing
Developing test plans using Test Director (From requirements)
Writing Test Cases using TestDirector
Write Test Scripts using Quality Center and QuickTest PRO
Writing accurate Test scripts and Test cases.
Reporting Bug and regression testing
Use SQL to verify data enter into functional applications.
Monitoring testing activities and reporting on status and key issues to
project management
Timely and accurately creating weekly Status Reports to submitted to the QA
manager
Attend all status meetings for which I am the Primary tester
Lead QA Analyst
COTS Product
Sunrise Assistant Living - Fairfax, VA
April 2003 to June 2004
Test Lead for New Web Based Billing Software
Developing test plans (identifying resource requirements).
Writing accurate Test scripts and Test cases.
Reporting Bug and regression testing.
Work with project mangers to develop a test strategy including acceptance
criteria, testing scheduling, outlining need scenarios, identifying testing
environment.
Monitoring testing activities and reporting on status and key issues to
project management.
Compiled test reports and participated in all activities involved in
developing the software.
Timely and accurately creating weekly Status Reports to submitted to the QA
manager.
Attend all status meetings for which I am the Primary tester.
Preparing test strategy for UAT Test Cycle.
Performed UAT, selecting users to participate, monitor testing, create UAT
results and reports
Lead QA Analyst/Tester
Equant Communications - Herndon, VA
May 2000 to Feb. 2003
Role: Lead Test Analyst for Conducting Analysis and Functional Testing of
Custom Developed Equant Applications for
Customer Trouble Ticket Systems (CTTS), and Clarify an off the shelf
software that was customized.
Environment: Windows NT, Apache Web Server 1.1
Bug tracking using Rational's Clear DTTS V4.5
Lead Analyst/Tester for the following applications:
Performed infrastructure testing
Customer Trouble Ticket System (CTTS) Both Thick client (Java version) and
Thin Client (web based application)
Clarify an off the shelf software for trouble ticket both web bases and
Client server.
Team member for Testing all Equant Reports Using the Ad hoc Reporting Tool
InfoView/WebIntelligence - Business Objects
Team member for Testing Customer Work Station (CWS) Both Thick client (Java
version) and Thin Client (web based application)
Reported directly to the Sr. Manager of Quality Assurance.
Duties and Responsibilities included:
Managing two major projects that were both web and client server based with
over 2000 user all over the world. Work with project managers to develop a
test strategy including acceptance criteria, testing scheduling, outlining
need scenarios, identifying testing environment. Managed and supervised up
to 12 testers. Performing Risk assessments After verifications and
validations. Established and monitored the team testing procedures.
Monitoring testing activities and reporting on status and key issues to
project management. Coordinating and reviewing the writing of test
scenarios.
Managing, scheduling and coordinating test activities with software
projects managers and developers.
Developing test plans (identifying resource requirements). Ensuring
completion of all checklists were completed on time and within budget.
Creating and managing updates to test plan, scripts and script repositories
Compiled test reports and participated in all activities involved in
developing the software.
Security check, testing Firewall and other securities both internal and
external. Developed and revised Test Plans, Test Suites and Test Cases.
Experience with Microsoft Office including MS Project, MS Word, MS Access,
MS Excel Mercury Test Director 7.2, Load testing using LoadRunner 7.5 to
make sure the software could accommodate up to 5000 users. Verified using
Oracle's SQL plus 8.0 and TOAD (Tool for Oracle Database) against data in
QA Data Warehouse. Creating and Viewing Ad hoc Reports using InfoView /
WebLogic - Business Objects
Submitted Test Results and Analysis Documents on time. Documenting and
reporting all discrepancies in the software using Rational's Clear DTTS bug
tracking tool. Managed GUI and Functionality defect tracking process using
Test Director. Regression testing and reporting status, using Rational's
Clear DTTS. Timely and accurately creating weekly Status Reports to
submitted to the QA manager
Attend all status meetings for which I was the Primary tester. Preparing
test strategy for UAT Test Cycle.
SR. TEST ANALYST
TRW - Fair Oaks, VA Jan.
2000 to May 2000
Testing software for the Department of Defense travel/ transportation
systems.
Involved in preparation Phase and Testing.
Test lead for four testers. Analyzing technical specs to create test plans
and test case.
Responsibilities included:
Writing accurate Test scripts and Test cases. Managed the QA Team of 7
testers, implementing QA Practices standards and procedures. Writing
automated test scripts for WinRunner and LoadRunner. Testing on both Unix
and NT platforms. Performing Negative testing, Regression testing paying
close attention to details. Performed testing for Web, Telnet and Client
Server applications. Was responsible for Functional testing of large
multimillion dollars software.
SR. TEST ANALYST
DISCOVERY COMMUNICATIONS, Bethesda, MD June 1999 to
Jan. 2000
Role: Sr. Tester for Testing Analyst for SAP/R3 FI
Involved in Development and Testing Full Life Cycle of the SAP FI. Analyzed
company accounting system documented accounting procedures. Tested the end-
to-end functionality of the system. Stress testing the system using Load
Runner validate that the system can successfully accommodate an anticipated
workload.
Designed all Test documentation.
Documenting product designs.
Coordinated the QA process between QA Team, UAT Team and IT department.
Responsibilities included:
Test coordinator for SAP/R3 FI for one of the largest communication
companies in the US.
Participated in the customization of SAP FI. Was responsible for defining
test objectives, and tracking all test activities. Wrote Business Process
Procedures (BPP). Wrote Reference Manuals for FI users.
Created accurate test scenarios, Wrote detailed Test scripts and Test cases
and Executed manual Test cases in a timely manner, writing test incidents
and doing batch testing.
Oracle, dB Surfer.
Unix and NT platforms.
Programming WinRunner, Programming LoadRunner, WinRunner Quick Test for R/3
Regression testing using WinRunner. Managed - tracked, evaluated and
optimized testing processes.
Participated End-of-phase reviews. Managed user acceptance test (UAT).
Mercury WinRunner 5.01, LoadRunner 5.0
SR. TEST ANALYST
SOURCE SERVICES (AMS), Fair Oaks, VA March
1999 to June 1999
Involved in Testing Full Life Cycle of a multimillion Financial software
development project for the State of Mississippi tax systems. Test Lead for
Six testers.
Responsibilities include:
Planed and Designed timely Test strategy
Created accurate and Detailed Test plans. Accurately Programming WinRunner
for regression testing
Accurately Programming LoadRunner for stress testing and load testing.
Writing Test cases using Lotus Notes for manual testing. Writing test
incidents or bugs and making sure they were resolved and retested.
Batch testing Oracle, dB Surfer, Unix and NT platforms. Mercury WinRunner
5.01, LoadRunner 5.0
TEST COORDINATOR
IRS - Fairfax, VA Sept
1998 to Dec. 1998
Role: Involved in Testing IRS Main Frame when new Main Frame computers were
in install at IRS computer centers all over the country.
Responsibilities include:
Participated in writing system test plans.
Involved in testing the IRS computers for Y2K bugs. Conducted detailed
needs analysis.
Monitored test for problems and reported problems in a timely manner to IRS
managers and developers.
Wrote post-test reports outlining the different issues and their solutions.
IBM & UNISYS Mainframes, Mercury WinRunner 4.01, LoadRunner
TECH WRITER / TRAINER / TESTER for SAP FI
ROMAC INTERNATIONAL, Atlanta, GA Jan.
1998 to Aug 1998
Lead tester for SAP FI. Designed and development test cases, test plans and
training document for SAP FI
Responsibilities include:
Participated in the customization of SAP FI.
In-house SAP R/3 FI training.
Automation testing and Manual testing of SAP FI. Developed training Manuals
for SAP R/3 FI to train over 100 users. Responsible for Accounts Payable
using SAP R/3 FI. Analyzed freight accrued. And coded accounts. Created
spreadsheets showing accrued freight, actual freight and the variances.
Converted currency from Deutsche Mark to US dollars. Determined duty
accrued for imports.
Expense out accrued duty. Responsible for coding and entering invoices to
be paid.
Unix and NT platforms.
Mercury WinRunner, LoadRunner.
SENIOR ENGINEER / SUPERVISOR
SPECTRONICS CORP., Atlanta, GA April
1997 to Dec. 1997
Responsibilities include:
Analyzed customer requirements. Outlined the option for a new cable system
upgrade, rebuilt and new design. Evaluated customers current plant
configuration with the assistance of Application engineer. Created spread
sheets for Bill of Materials totaling over $5,000,000.
Assisted in the preparation of bid proposals for multi million dollars
contract. Performed feasibility studies for proposed cable systems. Drafted
strand and design maps for CATV using Bentley Microstation and Cableview
software. Performed quality control on multi-million dollar design project.
NT platforms.