Summary of Experience
Achieved cumulative experience in various field of project management,
project implementation, construction management, construction, design
engineering, operation, and maintenance of various projects in oil, gas,
chemical, airports, buildings, commercial complex and power and
communication utilities, sanitary and waterways utilities, road and bridges,
earth moving and land development in different locations local and abroad.
Experiences:
November, 2011- June, 2014
Sr. Engineer, Electrical, Instrumentation, and Telecommunication
Southern Australia Northern Territory Oil Sources(SANTOS Ltd.)
Asian Star Bldg.,
Alabang, Muntinlupa City,
Philippines
Task to design review design engineering of EPC details but not limited to:
Package equipment( Gas turbine compressors, gas turbine alternator, air
compressors, nitrogen compressor, Tri-ethylene glycol, Flare,
RO/desalination, Brine transfer pumps and tanks, well pads/separators)
Electrical Distribution
Generator Control
Plant Blackstart System and Essential Power
Process control and instrumentation
Protective relaying and system protection
Process communication
Fire & Gas
Plant communication & security
DCS and Instruments
Construction Layout & model review
Technical review of relative disciplines for inter-coordination
Operation and maintenance review
Page 1 of 8
March 01, 2011 – July,2011
Lead Electrical Engineer
Pacifictech-Solutions Inc.
11th Floor Sun Plaza Bldg,
Shaw Blvd., Mandaluyong City
Philippines
Responsible to create electrical design for various overseas and local projects involving:
Utility power distribution system
Power Generation system
Power control and protective relaying
Building electrical
Illumination design
Earthing system
Lightning Protection
Fire Alarm system
Communication system
Process control and instrumentation system
Electrical control networks
Prepare material specifications and scope of works
Prepare project work volume/quantity
Conduct field survey, study, and coordination
August, 2008- December, 2010
Project Manager
Johnson Control IFM
4th Floor Tycoon Center
Pearl Drive, Ortigas Center,
Pasig City, Philippines
Initiates business development to achieve corporate goal.
In-charge of project engineering, procurement, and construction
Create case studies for energy cost solutions and continuous improvement of project
sites
In-charge of project scheduling, planning, and quality assurance.
Supports emergency solutions for site operation.
Project scope involves architectural, civil, mechanical, instrument and controls
Responsible for Risk Evaluation and Risk Management auditing and training of
field management personnel.
February, 2008– April,2008
Senior Electrical Engineer
Tekskil Construction Corp.
2/F Sycamore Annex Bldg.
Alabang-Zapote Road,Almanza 1,
Las Pinas City
Assigned to Technip France in Ras Laffan Gas for special project construction
planning and management.
Assigned to evaluate and prepare recommendation for design conversion of existing
facilities and systems.
Page 2 of 8
Report directly to the Facilites Manager.
November,2007 – January,2008
Project Manager
DEC Techno Resources,Inc.
2/F Sycamore Annex Bldg.
Alabang-Zapote Road,Almanza 1,
Las Pinas City
Responsible in implementing, developing, and managing the company domestic
projects involving waste water treatment, water supply system, housing facilities,
chemical and industrial plants.
Administer various tenders and proposals of subcontractors and procurement
suppliers
Oversee the company expenses and budget
Assist the Client in business planning and commercial development of projects
Manage and control the various engineering and construction Lead Supervisors
assigned at home office and project sites
December,2006 –October,2007
Sr. Electrical Engineer
DEC Techno Resources,Inc.
2/F Sycamore Annex Bldg.
Alabang-Zapote Road,Almanza 1,
Las Pinas City
(Assigned at
JGC PHILIPPINES, INC. Madrigal Business Park, Alabang
Muntinlupa City, Philippines
In-charge of electrical design for all buildings in which involves power
supply, lighting system, lightning protection, fire alarm system,
communication system, Building Management System and related HVAC
instrumentation
o Prepare Power System Conceptual design for Tender and detail
guidelines
o Initiate project specifications and material data for detail applications
o Calculate short circuit rating of system
o Calculate voltage and current transient application
o Calculate Impedance and voltage drop for conductor feeder
applications
o Calculate Lighting intensity and luminaire design parameter
o Prepare communication system block diagram for telephone,
intercom, broadband, paging system, and security
o Create design for Fire Alarm System and Monitoring
o Create and coordinate control design for Fire Protection System of
Mechanical
o Prepare design criteria and plan for detail design application of Bldg.
Management System for Mechanical, Electrical Power, Security,
Fire Life and Safety, and Communication System
o Lead testing event for Factory acceptance test and Inspection of
electrical materials.
o Co-lead the commissioning for Site Acceptance of various electrical
system.
Page 3 of 8
Prepare project technical and commercial bid proposal
Control the material quality of building electrical
Coordinate and evaluate project site field engineering
Assist the project site to facilitate the field engineering process
December,2005 –November. 2006
Chief Electrical and Air Navigation Engineer
Mechanical & Electrical Dept.
Takenaka-Itochu Joint Venture
New Bacolod(Silay) Airport Project
Silay City, Negros Occidental,
Philippines
Review and endorse approval all engineering design, material procurement,
quality control for Electrical, Aeronautical Ground Lighting, and Air
Navigation System.
Responsible for the general installation of Electrical Works ( Power Plant,
Exterior primary distribution system, bldg. electrical, communication
system, fire alarm, Flight Information system, & auxiliaries, civil works and
mechanical works )
Aeronautical Ground Lighting(PALS, SALS, Treshold, Wing Bar, RW
edge, Apron, CCR equipment & control)
Air Navigation System ( Control Tower equipment & devices, field
instruments like DVOR/DME, Instrument Landing System, Weather
Station, Glide Path, Ceillometer, Middle Marker, HF/VHF Radio, Satellite
Radio Facilities, Radio Antenna, relative civil, and structural works)
Controls quality assurance, inspection and commissioning activities
Manage and control project implementation, master and detail schedule,
coordination, and commissioning
Report directly to the department manager
May,2004 –October,2005
Sr. Construction Engineer
Construction Dept.
Technoserve Const.Co.,Inc.(an affiliate of JGC Corp.)
19th Floor, Export Bank Plaza, Don Chino Roces Ave.,
Makati City, Philippines
Prepares design conceptual plans and details for inquiry,bid proposal and
construction planning.
Review ITB and prepare technical/commercial plans and documents for
subcontracting
Evaluates/clarify subcontractor technical and commercial proposal.
Provide engineering support to Mechanical/Electrical/Instrument of Project
Task Force
Attend project planning coordination with other affiliate companies abroad
Project Participated:
ADGAS LNG – Abu Dhabi, UAE
Dolphin LNG – Qatar
Rio Tuba Nickel Refinery - Palawan, Phils.
Page 4 of 8
October, 2001 – October, 2003
Sr. Electrical Engineer
Nationwide Air Navigation Modernization Phase III
Air Transportation Office/DOTC
Construction Dept.
Tomen/ Toshiba Corporation
Bayview Plaza, Roxas Blvd., Parañaque City,
Philippines
Assistant to the construction manager for the installation of Air Navigation
equipment such as DVOR, HF/VHF radio system, NDB, RCAG, Operation
Buildings and support facilities like power generating stations, Power
Overhead Distribution Lines, Fuel stations, Electrical facilities,
Instrumentation & Control, and Civil/Structural facilities. Report directly to
the Construction Manager.
Responsible to construction activities, quality control & assurance and
project control.
Initiates field engineering design changes to comply client’s requirement
and to suit field conditions.
Conduct routine inspection for 25 sites in different locations in Northern
Luzon, Visayas, and Mindanao ( Tuguegarao Airport., Cauayan Airport,
Cabanatuan DVOR & Support Facilities, Plaridel Airport, Ninoy Aquino
International Airport, Tagaytay RCAG & ASSR, Laoag Intern’l Airport,
Baguio Airport, Jomalig Island DVOR & Support Facilities, Naga Airport,
San Jose, Mindoro Airport, Tagbilaran Airport, Roxas Airport, Iloilo
Airport, Kalibo Airport, Caticlan Airport, Masbate Airport, Mactan
International Airport, Cagayan Airport, Zamboanga Airport, Davao Airport,
Basilan RCAG, Palawan Airport, Tacloban Airport, and ATO Manila
Technical Center
Assist the Client for commissioning and warranty.
July, 2000 – November, 2000
Senior Engineer (Electrical, and Instrumentation &Control)
C & E (Chiyoda & EEI Corporation)
Meralco Ave., cor . Gen. Araneta St.,
Ortigas Center, Pasig City
Jetty Expansion Project-JEP, CBI, Liquigas France/ Total Petroleum
Alas-Asin Mariveles, Bataan
Philippines
Field Design Engineering of Electrical and Instrumentation involving
pipelines and storage for LPG, diesel, gasoline, bitumen, fire protection,
and blenders.
Provides detail design engineering assistance for Civil, Mechanical, Piping,
and Process instrumentation
Participate in the commissioning of Jetty and Terminal Facilities
February, 1998 – May, 2000
Construction Manager
Proposed Construction of Light Railway Transit Expansion to Cavite (LRT1) &
Reclamation of Manila Bay/Roxas Blvd.
Page 5 of 8
Omega Builders Corp.
Enterprise Bldg., Ayala Ave., Makati City,
Philippines
Facilitate the construction development and strategy of the project
Responsible to prepare bid technical and commercial proposal
To be in-charge of the implementation, coordination, project control and
monitoring
March, 1991 – March, 1998
Supervisor
Construction Management Department
Chiyoda Corporation
Tsurumi, Yokohama,
Japan
Chiyoda Corporation is an EPC contractor engaged mostly in energy
development, engineering, and construction for Petro-chemical plants like LNG,
aromatics, also for other non-hydrocarbon (petrochemical) industrial/energy plants.
Prepares construction plan for various disciplines such as Civil, Equipment
installation, Piping, Steel Structures, Electrical and Instrument,
Painting, Fireproofing/Insulation, and Temporary Facilities
Create electrical design for power generation, and MV/LV distribution
Provide conceptual design for instrumentation of Utility Plant( Water
Desalination, Water Distribution, and Waste water Disposal )
Creates development program for construction management tool & monitor
to enhance computer-aided construction management
Responsible for design engineering of Plant and support Facilities
Prepares bid documents for technical and commercial proposal of
Permanent Works
Team player in overseas business development such as project study, Front-
End Design Engineering, Definitive estimate, and Probability study
Prepare electrical design for various plant applications:
o Prepare Power System Conceptual design for Tender and detail
guidelines
o Initiate project specifications and material data for detail applications
o Calculate short circuit rating of system
o Calculate voltage and current transient application
o Calculate Impedance and voltage drop for conductor feeder
applications
o Calculate Lighting intensity and luminaire design parameter
o Prepare communication system block diagram for telephone,
intercom, broadband, paging system, and security, microwave
system requirement for project operation.
o Create design for Fire Alarm System and Monitoring
o Create and coordinate control design for Fire Protection System of
Mechanical
o Prepare design criteria and plan for detail design application of Bldg.
Management System for Mechanical, Electrical Power, Security,
Fire Life and Safety, and Communication System
o Lead testing event for Factory acceptance test and Inspection of
electrical materials.
Page 6 of 8
o Co-lead the commissioning for Site Acceptance of various electrical
system
Project Participated:
Melamine Project, Indonesia (DKM)
Aromatics Project, Malaysia (AAC)
Singapore Oil Ref. Project, Sinagapore (SIP)
Singapore Olefin Project, Singapore (SOP)
Khabrosk Oil Project, Russia(KBR)
Sakhalin LNG, Russia (SLG)
Mexico Oil, Mexico
Texas Oil, USA
Petronas Oil, Thailand
Yanbu (Aramco)
Ras Laffan LNG, Qatar(RLG)
Qatar LNG, Qatar, (QGL)
January, 1989 – July, 1990
Instrument and Control Engineer
Chiyoda Petrostar Limited(CPL)
Dammam International Airport Project(DIA/KFIA)
Dammam, K.S.A.
Supervises the installation, testing. Pre-commissioning/commissioning of
Instrument & Control Facilities such as Utility Plants, Power
Generation Stations, Sewage Treatment Plant, Pipe lines, Fuel Tank
Farm, Chiller Plant and HVAC, Electrical Distribution Facilities
Recommend/modify engineering design to suit condition & requirement
Responsible for the operation and maintenance of Control Facilities up to
warranty period
January, 1986 – July, 1988
Senior Supervisor
Construction Management Division
Manila Electric Company
Ortigas Ave., Pasig City
Philippines
In-charge of construction of new power substation facilities, new
underground distribution networks, and new overhead lines for power
overhead line - transmission and distribution system.
Prepare ITB documents and documents and requisitions for various projects,
in-house project cost estimate, project schedule & plan, material
specifications.
Inspect and monitor field progress
January, 1979 – July, 1985
Field Supervisor
Construction Management Division
Manila Electric Company
Ortigas Ave., Pasig City
Philippines
Page 7 of 8
Conduct pre-engineering survey and inspections for facility planning
Prepare in-house cost estimate for project budget requisition
Evaluate contractor’s commercial/technical proposal and recommend
potential awardees
Implement work order/project which includes inspection, quality assurance,
monitoring, and control, acceptance, and payment endorsement
Education Bachelor of Science in Electrical Engineering, 1987
Central Colleges of the Philippines,
Quezon City, Philippines
Birthday May 06, 1956
Nationality Filipino
Height 162cms
Weight 65 kg.
Other Skills Computer literate ( Microsoft, Autocadd, Microstation,
electrical calculation software)
Piping Spoolgen,
Driving (non-professional), land vehicle
Page 8 of 8