Personal Details:
Name: Simon George Mason
Address: PO Box 1381
Port Arthur, Texas, 77641
Telephone: 719-***-****
Email: acgfyq@r.postjobfree.com
Profile:
• An experienced Qualified Tradesman (Boilermaker/Welder, Pipefitter) with extensive
supervisory experience who achieves the highest quality in minimal time, whilst maintaining a
personal commitment to safety. A natural leader, one who can absorb the necessary
information to achieve the best possible results for the task. Offering an employer the benefit
of exceptional trade skills and knowledge of the Construction, Oil and Gas, Power Generation
and Mining industries.
Key Competencies:
• Excellent Leadership skills, enabling effective liaison with team members and management,
interacting well with people from diverse backgrounds.
• Safety focused, maintaining a proactive approach to WHS&E.
• Flexible and adaptable, no new task is daunting, with the ability to work with diverse tasks,
guidelines and expectations.
• Committed to professional standards, accountable and responsible for decisions, prioritising
and managing resources and time.
• Proven team player, sharing ideas with others, being open to change and learning new
responsibilities and skills quickly.
• Possess a can do attitude, combining patience, determination and persistence to troubleshoot
problems and complete tasks.
• Proficient computer skills with competency in Microsoft Office Suite and various planning
tools.
SIMON G. MASON
1
Employment History:
June 2012 Bechtel Aust.
March 2014 CRAFT SUPERVISOR – PIPING ISBL
• Successfully hooked up modularized piping installations. Supervised
and provided technical support for the installation, fit up and welding
of large and small bore carbon steel, alloy and vacuum jacketed
pipe. Monitored work activities and ensured quality work was
performed with the highest level of safety. Ensured the most current
design changes were implemented. Coordinated work activities with
other disciplines and areas.
Proficiency in Microsoft Office programs and Bechtel BSAPS.
Prepared reports, including summary of construction progress,
personnel and expenditure forecasts. Determined craft requirements
and scheduled work to be performed. Reviewed site requirements
for tools and consumables and prepared FMRs.
Approved craft time records using eTrack.
June 2011 Thiess Pty Ltd
Dec 2011 MECHANICAL/PIPING SUPERVISOR
• Supervise Mechanical, Pipe fitting and Welding crew during
construction of two Multi Fuel Co gen Power Station boilers and
steam turbines at Worsley Alumina Refinery, Western Australia.
Nov 2010 Alstom Power
May 2011 SUPERVISOR/SPECIALIST WELDER
• Assist in the overhaul of HP steam turbine and generator rotor
replacement at Liddel Power Station, New South Wales, including
disassembly of turbine casing and throttle valve components.
Pressure welding of piping associated with the
disassembly/assembly procedure.
2
• Supervise mechanical crew on main and aux burner refurbishment
at Hazelwood Power Station, Morwell, Victoria, during major boiler
outage.
• Supervise Mechanical and Welding crew during Gas Turbine
overhaul at Stratford Power Station, Taranaki, NZ. Compile reliability
reports on Gas Path (exhaust) components.
Jan 2010 PCR Polyweld Sino Iron Karratha
Oct 2010 MECHANICAL SUPERVISOR
• Supervise mechanical, pipe fitting and welding crew during
construction of Heat Recovery Steam Generators (Boiler) as part of
combined cycle power plant.
• Investigate and record Non Conformance Reports including
estimation of costs associated with correcting the non
conformances.
Apr 2009 Alstom Power
Dec 2009 SUPERVISOR/SPECIALIST WELDER
• Supervise welding crew on nightshift during Gas Turbine/HRSG
power plant outage at Swanbank (QLD).
• Pressure welding of boiler waterwall tubes at Hazelwood Power
Station (VIC) during major boiler overhaul.
• Welding of Inconel combustion chamber casings on gas turbine at
Kwinana (WA).
Aug 2007 SRWP Alliance (ABI / Macdow Joint Venture)
Mar 2009 MECHANICAL SUPERVISOR
• Supervise mechanical crew including Welders, Mechanical Fitters,
Riggers, Crane Drivers and Labourers during construction of 110km
(70 mile) long water pipeline including direct control of mechanical
installation and commissioning of 4 pump stations, pigging pits and
balance tanks.
SIMON G. MASON
3
• Responsible for delivering work packages on time and on budget
ensuring zero harm to people, environment and equipment.
July 2006 Sun Engineering Lihir Gold PNG Flotation Project
Feb 2007 PIPING SUPERINTENDENT
• Supervise and co ordinate activities of 100+ workers and 6
supervisors.
• Plan installation to avoid obstructions and avoid interference with
activities of other departments.
• Interpret company policies to workers and enforce safety regulations
and quality assurance.
• Inspect work in progress and finished products.
• Study production schedules and estimate worker hour requirements
for completion of job assignment.
• Establish work procedures to meet production schedules.
• Recommend measures to improve production methods, worker
performance and quality of product.
• Suggest changes in working conditions and use of equipment to
increase efficiency.
• Procure appropriate materials, ensuring adequate stock levels.
• Maintain time and production records.
• Liaise with supervisors and engineers, coordinating activities of
individual departments.
• Planned and scheduled workload, developed work packs and
ensured quality control standards.
Dec 2005 Alstom Power
June 2006 CONTRACT PRESSURE WELDER
• Provide specialist pressure welding on water wall tubes and
superheaters as part of boiler refurbishment at Queensland Nickel
Refinery, Townsville.
• Provide fabrication and welding of piping associated with boiler
maintenance shutdown at Swanbank ‘E’ Power Station, Brisbane,
including repairs to existing welds on 9Cr 1Mo main steam line.
Apr 2005 Dartbridge Welding
Nov 2005 CONTRACT PIPEFITTER / WELDER
4
• Provide fabrication and welding of pipe spools for Sun Engineering
and Theiss Sedgman.
• Maintain daily record of traceability and ensure quality demands are
met.
• Liaise with Workshop Supervisor and Project Manager to ensure
continuous material supply.
Aug 2004 Piping Solutions
Apr 2005 CONTRACT PIPEFITTER / WELDER
• Provide fabrication of stainless steel pipe spools for Darwin LNG
plant.
• Provide labour for various site jobs including piping at Cleveland
water treatment plant for United KG, tube repairs in super heater
section of HP boiler at Visy Paper and repairs to 347 stainless steel
preheater at Incitec.
Sep. 2003 Ackroyd Engineering Services
July 2004 CONTRACT PIPEFITTER / WELDER
• Provide fabrication, welding and installation of carbon steel steam
piping for QAL, Gladstone as part of an odour reduction scheme.
• Welding of boiler tubes and main feed water piping and steam
headers for Alstom Power on Boiler 6 at Alcan Refinery, Gove.
• Provide onsite maintenance at Rocky Point Cogen Power Station
including tube repairs and installation of Chrome moly main steam
bypass line.
July 2003 Southern Pacific Petroleum
Sep 2003 Shale Oil Plant, Gladstone
CONTRACT SPECIALIST WELDER
• Perform welding on 347 stainless steel components of kiln retort
section as part of a major maintenance shutdown.
April 2003 Industrial Installation and Maintenance
July 2003 Hemmant Workshop, Brisbane
CONTRACT PIPEFITTER / WELDER
• Provide fabrication of carbon steel pipe spools for Comalco Alumina
Refinery Project, Gladstone.
SIMON G. MASON
5
• Welding of carbon steel pipe spools to ASME IX.
April 2002 Western Construction Company
Mar. 2003 Murrin Murrin and Kwinana, Western Australia
PIPE FITTER / SUPERVISOR (Sept. 2002 to Mar. 2003)
• Provide onsite fabrication of pipe spools from carbon steel,
stainless steel and exotic materials.
• Supervise and co ordinate activities of 20 staff.
• Plan installation to avoid obstructions and avoid interference with
activities of other workers.
• Attend to general maintenance of nickel refinery plant and
equipment.
• Analyse work orders and blueprints, determining type of operations
and sequence of operations required.
• Inspect work in progress and finished products.
• Study production schedules and estimate worker hour requirements
for completion of job assignment.
• Interpret company policies to workers and enforce safety regulations
and quality assurance.
• Establish work procedures to meet production schedules.
• Recommend measures to improve production methods, equipment
performance and quality of product.
• Suggest changes in working conditions and use of equipment to
increase efficiency.
• Procure appropriate materials, ensuring adequate stock levels.
• Maintain time and production records.
• Liaise with other supervisors and engineers.
BOILERMAKER / PIPE FITTER (April 2002 to Aug. 2002)
• Provided fabrication of stacks for Alcoa Wagerup Refinery.
• Provided fabrication of pipe spools from carbon steel, stainless steel
and exotic materials.
May 2001 United Construction Pty Ltd
Feb. 2002 Orange, New South Wales
LEADING HAND BOILERMAKER / PIPEFITTER
Onsite construction at Ridgeway Goldmine
6
• Duties similar to above role of Pipe Fitter Supervisor.
• Provided fabrication of 20m and 29m thickeners and fabrication of
concentrate storage tanks.
• Installed carbon steel and poly pipe spools.
• Liaised with site engineers, ensuring compliance.
• Supervised employees and allocated tasks.
Sep. 2000 United Maintenance Pty Ltd
Apr. 2001 Gove, Northern Territory
BOILERMAKER / WELDER
• Provided maintenance and high pressure boiler tube repairs at
Nabalco Alumina Refinery, including rotating kiln and high pressure
boiler shutdowns.
• Repaired large tanks and replaced strakes and annular rings.
• Carbon and stainless steel pipe fabrication and installation.
• Welding of carbon steel pipe spools to A.S.4041.
Jan. 2000 Stork ICM BP Refinery
Aug. 2000 Bulwer Island, Queensland
SUPERVISOR (May 2000 to Aug. 2000)
• Supervised staff and co coordinated fabrication and erection of low
pressure oxygen service pipeline.
• Planned and scheduled workload, developed work packs and
ensured quality control standards.
LEADING HAND PIPE FITTER / WELDER
(Jan. 2000 to May 2000)
• Provided onsite spooling of carbon steel pipe.
• Pipe welding to ASME IX, B31.3.
Oct. 1999 United Construction Pty Ltd
Dec. 1999 Brisbane, Queensland
BOILERMAKER / WELDER
Incitec Granulation Plant, Gibson Island
• Provided onsite fabrication of structural steel and piping.
Nov. 1998 United Construction Pty Ltd
SIMON G. MASON
7
Sep. 1999 Townsville, Queensland
LEADING HAND BOILERMAKER / WELDER
Onsite construction at Sun Metals Zinc Refinery
• Provided fabrication of structural steels and welding to AS 1554.
• Installation of conveyers and filter press for leaching plant.
May 1998 Pacific Coast Engineering Pty Ltd
Nov. 1998 Townsville, Queensland
LEADING HAND BOILERMAKER / WELDER
• Provided fabrication of stainless steel cooling modules for peak load
gas turbine power station.
Sept. 1997 Subsee Australia Pty Ltd
March 1998 Cairns, Queensland
BOILERMAKER / WELDER
• Provided fabrication of aluminium 24m dive boat, including sheet
metal fabrication (2mm) of safety lockers and internal fit out of
plumbing, bilge pumping systems and stainless steel exhaust
system.
• Repaired slipway for aluminium hulled vessels.
• TIG & MIG welding in aluminium and stainless steel.
Jan. 1986 Various Employers and Contracts
Aug. 1997 Australia and UK
• Held positions as: Leading Hand; Boilermaker / Welder; Metal
Fabricator; and Apprentice Boilermaker / Welder (Hydro Electric
Commission).
• Projects and skills consisted of:
Fabrication and erection of limestone crusher plant.
Site maintenance and construction at paper mill.
MMA and GMA welding of structural steel, plate and pipe to Australian
Standards.
Fabrication of large diameter duct from 6mm plate.
Fabrication on pipe work, tanks and conveyor systems for the food
industry.
Site maintenance of export woodchip mill.
Maintenance of Tin, Zinc, Gold and Iron ore mining process plants.
Plant and equipment repairs in underground environment.
Site maintenance and construction at cement plant.
milling machine and lathe operation.
Brake press, guillotine and plate roller operation.
8
Qualifications:
• Master Boilermaker / Welder (Fully Qualified)
• Doggers Certificate; OHS Number 01446001
• Elevated Work Platform Certificate; OHS Number 01403655
• Forklift Truck License; OHS Number 01401278
• Plan and Drawing Quotation Workshop: Institute of TAFE
• Inside Diameter (ID) Welding Course: Institute of TAFE
• NSK Bearing Assemblies & Gearbox / Drives Course
• Eutectic Castolin Powder Spraying Course (Hot and Cold)
• Certificate in Metal Fabrication: NW Institute of TAFE
• Pre vocational Certificate: Boilermaker / Welding, Fitting and
Machining, Diesel Fitting: NW Institute of TAFE
References:
• Supplied on request
SIMON G. MASON
9