Pritam Hazra

**/* ***** ********** ****, Howrah: 711 104

Telephone: (Res.) 033+2677 0985 / (Mobile) 987-***-****

E-mail: acgeyc@r.postjobfree.com

Date of Birth: December 31st 1973

Cost to Company: 7.90 lacs

Diploma Civil Engineer with more than 18 years experience in Project

Execution

Objective: Looking for a platform which enables me to use my skill and

expertise specially in Project Execution and also broaden my

horizons.

Current Work Profile

Company : GPT Infraprojects Limited ( Since Dec' 2010 )

Designation : Manager- Projects

Work Profile :

. To lead the team of Engineers, Supervisors and Surveyors

in Execution of Project .

. To prepare the BILL OF QUANTITIES

. To plan and monitor the monthly/weekly/daily activities.

. To arrange the resources of execution under budgetary

constraints.

. To monitor the excavation, transportation, laying and

compaction of earthwork and blanketing.

. To prepare the engineering and techno commercial

documentations.

. To deal and correspondence with clients and consultants.

. To deal with sub contractors.

. To prepare the Bill and to verify the sub contractor's

bill.

. Daily reporting to the superior authority.

Current Industry: Construction / Engineering

Current Functional Area: Site Engineering / Project Management

Current Location: Krishnanagar, Nadia, West Bengal.

Location Preference: In or around Kolkata.

Qualification: Diploma in Civil Engineering from State Council of

Technical and Engineering Education, Government of West Bengal

in 1996

Type of Execution work done till date at different organizations

FOUNDATION RCC ISOLATED FOOTING, STRIP FOOTING, RAFT FOUNDATION, DMC BORE

PILE, LARGE DIA PILES WITH ROTARY RIGS AND PILE CAPS.

BUILDINGS RCC FRAMED SUPERSTRUCTURE WITH STAIR AND LIFT PIT INCLUDING

( UP TO 30 MTRS WATER PROOFING, MASONERY, DOORS & WINDOWS, PLUMBING, HVAC LAY

HEIGHT ) OUT,

EECTRICAL LAYOUT, FLOORING, PAINTING AND OTHER FINISHES.

BUILDING FACADE: STRUCTURAL GLAZING, CURTAIN WALL, ACP CLADDING, ALUMINIUM PATH

(UP TO 115 MTRS WAYS, DRY STONE CLADDING, FRAME LESS GLAZING WITH POINT FIXING

HEIGHT) (SPIDERS, PATCHES, MANETS, TAILOR MADE FITTINGS), INSTALLATION

OF AUTOMATIC ENTRANCE SYSTEMS, SPACE FRAMES.

STEEL STRUCTURE: STEEL GIRDER BRIDGE, FACTORY AND STORE SHED WITH EOT CRANE

GIRDER

(TUBULER AND AGULAR BOTH), MS ARCHITECTURAL STRUCTURES, MS AND

SS

CANOPIES,STEEL FOOT OVER BRIDGE.

ROAD AND RAIL: EARTH WORK IN EMBANKMENT AND CUTTING, BLANKETING WORK,

PREPAPATION OF WBM SURFACE, MASTIC ASPHALT LAYING, RCC MINOR

BRIDGES AND WING WALLS, RCC BALLAST LESS TRACK, RCC DEEP PIT.

Summary of Experience

GPT Infraprojects Limited ( Since Dec' 2010 ) as Manager

Projects

. RECENTLY COMPLETED AND COMMISSIONED 55 CRORE PROJECT OF Major Railway

Bridge over River Jalangi, Earthwork in embankment, Blanketing,

Execution of Minor Bridges, Track linking, Platform work and Station

Buildings for KNJ-DHU RAILWAY DOUBLING PROJECT(14 km), Eastern

Railways, SDAH DIVN.

Axis Design Solutions, Kolkata (Aug' 2009 to Nov'2010 ) - on Project

Contract as Project Manager

. Installation of Aluminium and Glass Fa ade Systems for CWG-2010 at

Yamuna Sports Complex at New Delhi.

Nitson and Amitsu Private Limited, Kolkata ( Feb' 2006 to Jul'2009 )

as Senior Project Engineer

. Structural Glazing, Inclined Point Glazing, ACP Cladding work at

Bengal Intelligent Park, Omega Tower, Saltlake, Kolkata

. Structural Glazing, Point Glazing, Glass Bridge, Glass Curtain Wall,

ACP Cladding work,

Glass Canopy with MS Structures at South City Mall Complex, South City

Projects Limited, P.A.S Road, Kolkata.

. Installation of Curtain Glazing work, Installation of Automatic

Sliding Doors, Aluminium Doors & Windows at Metro Cash and Carry,

Distribution Centre, Kolkata.

. Installation of 8 Nos 4M.X110M.Curtain Glazing at South City

Residential Tower, PAS Road, Kolkata.

. Dry Stone Cladding work ( Natural Stone--Granite, Red Agra, Dholepur )

with 200 mm to 600 mm projection from Building line, Point Glazing

with Dorma Spiders, ACP Cladding at Proposed City Center-II along

with Five Star Hotel, Bengal Ambuja Housing Development Limited,

Rajarhat, Kolkata.

Albert David Limited, Kolkata (Mar'2005 to Jan'2006) - on one year

contract as Project Engineer

. Construction of 5 storied SVP Facility Building inclussive of 450 mm

dia 22 meter DMC Bore Pile Foundation,Pile Caps, RCC framed

structure, Steel Structural Shed on Roof with RHS, SHS, Colour Coated

G.I.Sheets, Flooring with Kota Stone, Vitrified Tiles and epoxy,

Cobbing of all internal corners, installation of Scientific G.I.Doors,

Clean Room Aluminum Windows, Interior finishing work, Installation of

HVAC Ducts, walkable and non-walkable false ceilings, Installation of

G.I. and M.S. Pipelines for Raw water, DM water and Steam, Sanitary

and Plumbing work, Installation of entire Drainage system of the

Plant, Installation of Suspended Cradle System, External finishes with

ceramic tiles and Glass Curtain Wall.

. Structural and Interior renovation work of Oral Liquid, Ointment and

Tablet Sections.

Modi Projects Limited, Ranchi (July'2001 to Feb'2005)

as Project Engineer

. 1200 nos 450 mm dia DMC Cast in Citu R.C.C. Pile for proposed Medical

College at HIT Campus, Haldia.

. Earthwork in cutting and filling for Formation, Construction of 9 nos

Minor Bridges, Blanketing work between Dumka and Madanpur for the

proposed Rampurhat-Dumka-Mandarhil/Deoghar Broad Gauge Line, Eastern

Railway.

. Earthwork in cutting and filling for Formation, Construction of 26 nos

Minor Bridges, Blanketing work for the proposed Banka-Barahat Broad

Gauge Line, Eastern Railway.

. Construction of One no Minor Bridge and P.Way Formation for 2 KM. long

Double Line Rly

Siding at Jojobera Cement Plant, Lafarge India Limited, Jamshedpur.

. Construction of 9 nos Minor Bridges and 8 KM. long Formation for Third

Line Project in BBU-DGP Section under MGS Division,

. Construction of Double Concrete Apron with intermediate Pipe Bay

alongwith 2 KM long WBM Service Road and Formation for 3 KM long

Double Line Railway Siding in IOC Plant Asaoty, Hariana.

Sreecon Project Services Private Limited, Kolkata (Aug'1996 to June'2001)

as Site Engineer

. Construction of 7 nos G+4 storied Residential Building at South

Kolkata.

. Construction of Store Shed for Corvettes at GRSE Main

. Construction of Store Shed for Bailey Bridge at GRSE 61 Park

. Construction of Station Building, Pay & Use Toilets and Steel

Structural Foot Over Bridge at Park Circus Station, Eastern Railway.

. 600 meter long R.C.C. Deep Pit alongwith R.C.C. Washing Apron at

Sealdah Railway Station,

General Information

Name :Pritam Hazra

Father's Name :Sri Sreebhusan Hazra

Present & Permanent Address :15/3 Sarat Chatterjee Road,

Howrah: 711 104

Phone No. :Residence: 033-****-****, Mobile: 987-***-****

E-Mail Address :acgeyc@r.postjobfree.com

Sex / Marital Status :Male / Married

Date of Birth :December 31st 1973

Academic & Technical Qualification : DIPLOMA IN CIVIL ENGINEERING WITH

71% FROM S.C.E.T.E.

GOVT. OF WEST BENGAL IN 1996.

: HIGHER SECONDARY(SCIENCE) FROM WBHSC IN 1992

: MADHYAMIK FROM WBBSE IN 1990.

Computer Skills :MS Windows, MS Office, MS Project,

AutoCAD, Internet Applications.

Languages Known :Bengali (S/R/W), English (S/R/W), Hindi

(S/R).

Present Remuneration :Take home Rs 53800/- per month +

Bonus+Exgratia+Medical+LTA

Expected Remuneration :Negotiable

Hobbies :Building Planning, Still

Photography, Net-Surfing.

Reference Mr. Santanu Saha, Dy Chief Engineer

Sealdah Division, Eastern Railways.

Mr M.K.Hui, Assistant Engineer

Sealdah Division, Eastern Railways.



Contact this candidate