Engineer Project Manager

Location:
New York, NY
Posted:
October 18, 2014

Contact this candidate

Resume:

Ph: 631-***-**** email: acge88@r.postjobfree.com

Ganapathi Venkatagiriyappa

Education:

MS, Civil Engineering, Michigan Project Manager/Scheduler

Technological University, 1994 Hirani Engineering & Land Surveying, Jericho, NY

9/2013 – Current

EIT, MIchigan Prepared and updated in depth project schedule on

Primavera p6, Monitored Progress and Performance,

BE, Civil Engineering, National Institute Developed scheduling standards, provided workable

of Technology, Suratkal (KREC) (India), solution to schedule deviations Analyze schedule progress

Mangalore University 1987

and critical path to determine the effects of schedule

changes in the schedule and recommended corrective

Total Years of Experience:

actions. Developed logistic plans, coordination and shop

20

drawings. Prepared Submittal Logs, Submittals, RFIs, MSDS

etc., Assisted Senior Project Manager in managing project

Technical Skills:

CM: Primavera p6, MS Project, and coordinating, resolving construction issues for the

following projects. Designed a temporary supporting

Procore

CADD: Bentley Microstation, systems (Project cost varies from $5million to $20 million)

Substructures at Gill Hodges Memorial Parkway

Autodesk AutoCAD

Structures: RISA 3d, STAAD V8i, Bridge, TBTA –The project consists of Installation of

Etab 2013 scour countermeasures, concrete and jacket repairs

Civil: Storm CAD v8i, Pond Pack V8i to substructures units, concrete repairs to south

Other: NYC Building Code, Manual Abutment exterior, Cathodic Protection etc. involves

of Steel Construction (ASD/LRFD),

under water work.

international Building Code, NYS

BPCA Phase 3 Pile Rehabilitation- Repair and

DOT Bridge Design Manual, NYS

Rehabilitation of Piles at Piers: Battery Park City

DOT Standard ACI Manual of

Esplanade Repairs involves protecting concrete piles

Concrete Practice, NYC DEP Storm

with a formed and poured in place protection epoxy

water system guidelines, NYS

grout system and repair concrete piles with a

Storm water Design Manual,

reinforced, formed and poured-in-place concrete

Construction Management

Standards of Practice etc. pile repair system – involves under water work.

Brooklyn Bridge Park Corp, Pier 3 Phase 1 (inshore)

Experience: Substructure Repairs: involves the installation of

Mr. Venkatagiriyappa has 20 years of

concrete encasements over existing deteriorated

progressive experience in designing and

timber piles with concrete extensions.

managing numerous projects in North

BPCA Pier A Plaza: Construction of Pier A Plaza

America and in India. These includes

adjacent to historic Pier A Building. The work

bridges, residential and commercial

involves grading, planting trees, developing irrigation

buildings, storm water management,

systems, reconstructing drainage systems, installing

infiltration/inflow study, utility

relocation and critical infrastructure flagpole base, installing planter wall, permanent

projects for such clients as the MTA NYC benches, site lighting, signage, ground hydrants,

Transit, NYS DOT, Connecticut DOT, and drywell etc.

the World Trade Center Rehabilitation. NYSDOT projects: Maintenance, Repair of Barriers,

Specializes in with Primavera P6

Fence, Signs in NYC ( Type 1and Type 2)

Scheduling and construction

management.

page 2

Ph: 631-***-**** email: acge88@r.postjobfree.com

8/2009 – 09/2013 02/2002 – 12/2007

C2GP Consulting Engineers, Bangalore New York City Transit (MTA)

Senior Project Manager Senior Project Coordinator

Design, construction and project management of Responsible for design and coordination of the

Ayurpark Health Care Facility Building, near Malur, following projects:

Vent Plant Rehabilitation Projects (over $40

Bangalore 55000 sq.ft Industrial, Project Cost: App.

$5M-$25millions million dollar projects) 1 & 9 Line Restoration

Managed construction, conducted quality Service,

World Trade Center, Downtown, Manhattan, NY

assurance and coordinated project with various

Lafayette Ave & Rockwell Place, Brooklyn,

private and public agencies.

Responsible for preparing complete master plan, NY6th Ave & 13th St. Manhattan,

NY6th Ave. & 30th St. and 21st St. Manhattan,

selecting architects, engineers (structural, civil

and mechanical), cost estimates etc. NY

Served as lead project engineer and manager. Work on these projects included:

Developed Master Plan and Cost Estimates. Preparation of Preliminary Drawings and

Analyzed survey reports, maps, blueprints and assessment of the impact of new structure on

other topographical and geologic data to existing utilities.

Collection and calibration of all the as-built

effectively plan projects.

Prepared Specifications and Quality Assurance information from the public agencies and field

Manual for project Prepared Tender Document investigation and preparation of fully

and Selected Construction Contractors thru coordinated unified subsurface utility

tender process. drawings.(D-drawings).

Inspected project sites to monitor progress and Preparation of test pit drawings to locate utilities

adherence to design specifications, safety with pinpoint accuracy. Found the potential

protocols and state sanitation standards. conflicts of existing utilities with new structures

Visited project sites during construction to and provided innovative methods of relocating

monitor progress and consult with contractors utilities saving cost and time of the project.

Preparation of new utility layout based on the

and on-site engineers.

Advised managerial staff about design, design criteria of ConEdison, ECS, NYSDEP and

construction and program modifications. others. Design of new sewer lines including new

Reviewed calculations and analytical data to routing, sizing of the pipes.

Performance of sewer hydraulic gradient design

maintain accuracy of the technical reports.

Reviewed and assisted in performing technical calculations.

Analysis of existing & new systems using Hydra

bid analysis.

Recommended and selected new and flow, storm water design program. Coordination

with NYSDEP and obtained approval from the

replacement test equipment to improve

same.

research and testing capabilities.

Preparation of preliminary estimate quantities

Estimated quantities and cost of materials,

and cost estimates for utility relocation.

equipment and labor to determine project

Review of Shop Drawings. Solved many

feasibility.

Solved issues related to labor management and construction issues during construction.

Suggested and successfully implemented

monitored project.

Supervised field engineer, quality engineer, innovative methods for rerouting the utilities,

optimizing design, improving quality of drawings.

mechanical engineer and other field and office

Supervised and managed construction.

staff.

Responsible for timely completion of the project.

page 3

Ph: 631-***-**** email: acge88@r.postjobfree.com

07/2000 - 02/2002 design calculations of storm sewage system

Hirani Engineering and Land Surveying, NY using Storm CAD.

Project Engineer Route 9A Reconstruction Project (segment 3,

Responsible for design, direct, coordination and NYS DOT).Prepared utility relocation plans,

management of the following projects. details and test pit drawings.

Westchester Industrial Complex, Westchester, LIE/CIP Interchange Improvement Project Exits

NY: Prepared the site plan and designed Gabion 30-32( NYSDOT). Performed design calculations

Wall, prepared plan and details. Performed for concrete Retaining Walls on soldier piles.

existing site drainage analysis for 5yr, 10yr and Prepared plans, sections and detailed

25yr flood conditions using Storm CAD, a storm reinforcement drawings.

water design program. Recommended methods

to control flooding during heavy rain. 01/1996 to 05/1997

Coordinated with Village Engineer and Obtained Purcell Associates,

approval for the site plan. Assistant Engineer, Glastonbury, CT

Drainage System design for New School Performed Design and Analysis of Substructures

Playgrounds: New York School Authority PS6X. for Merritt Parkway Bridge at Route 7/15

Analyzed existing drainage system for interchange. . Used STAAD and SEISAB for

playground and performed design calculations design analysis and calculations.

Performed design and analysis of buildings for

for new drainage system using HydraFlow, storm

water design program. Prepared Drainage Uconn, New Down town Campus, Stamford,

plans& details. Wrote specifications. Reviewed Project O Ansonia High School,

Reviewed shop drawings for buildings: Uconn,

Shop drawings and inspected the construction of

the drainage system. Avery Point Campus, Ansonia High School, Mead

Drainage System Improvements and Structural Elementary, Prenderghast Elementary, UCONN

Steel Repair Design at the Throgs Neck Bridge Ice rink.

(TBTA), NY. Included inspection, coordination of

the work with design & drafting teams and 07/1994 to 01/1996

prime consultants & TBTA. United International Corporation,

Performed Local Law Inspection Service: 421 Civil Engineer, Wallingford, CT

Prepared Infiltration / inflow study reports for

7th Ave, NYC etc.

city of Ansonia and complete sewer map from

07/1997 to 05/2000 detailed filed investigation and survey.

Performed analysis and design of medium span

Project Engineer, Bellmore, NY

Drainage Improvement-Routes 27/27a & Awixa highway concrete bridges: Bridge No, 04476,

Creek.Town of Islip (NYSDOT-Region 10). Berlin CT, Bridge No: 71006 Military Highway

Assessed the cause of the flooding and provided Over Millcove, Bridge No: 845, RI, Cahoone Rd

the solution to prevent any future flooding of Over Buck Horn Brook, Wolfe Fit Road Steel

the Route 27. Used Pond Pack 7.0 of Haestad Girder Bridge.

Designed precast voided deck superstructure

methods for modeling and analysis of the

watershed. Performed Hydraulic Calculation for and concrete abutments and wing walls on pile

10yr, 25yr, 50yr and 100yr flood. Prepared foundation.

Performed bridge inspections and prepared

Expanded Project Proposal (EPP) Coordinated

with NYSDOT and supervised the work of sub- reports.

consultant. Provided feasible hydraulic solutions.

Connecting Strathmore Office Park Sewage 02/1993 to 07/1994

System to Proposed Medford Apartments Woodward Clyde

Sewage System, Town of Brookhaven, NY; Long Staff Engineer, San Diego, CA

Assisted in preparing Storm Water Discharge

Island motor Parkway, Storm Sewer Design

(NYSDOT-Region 10). Performed the layout and Management plans 28 U.S Naval Bases for Army

Corps of Engineers, City of San Diego.