Ph: 631-***-**** email: acge88@r.postjobfree.com
Ganapathi Venkatagiriyappa
Education:
MS, Civil Engineering, Michigan Project Manager/Scheduler
Technological University, 1994 Hirani Engineering & Land Surveying, Jericho, NY
9/2013 – Current
EIT, MIchigan Prepared and updated in depth project schedule on
Primavera p6, Monitored Progress and Performance,
BE, Civil Engineering, National Institute Developed scheduling standards, provided workable
of Technology, Suratkal (KREC) (India), solution to schedule deviations Analyze schedule progress
Mangalore University 1987
and critical path to determine the effects of schedule
changes in the schedule and recommended corrective
Total Years of Experience:
actions. Developed logistic plans, coordination and shop
20
drawings. Prepared Submittal Logs, Submittals, RFIs, MSDS
etc., Assisted Senior Project Manager in managing project
Technical Skills:
CM: Primavera p6, MS Project, and coordinating, resolving construction issues for the
following projects. Designed a temporary supporting
Procore
CADD: Bentley Microstation, systems (Project cost varies from $5million to $20 million)
Substructures at Gill Hodges Memorial Parkway
Autodesk AutoCAD
Structures: RISA 3d, STAAD V8i, Bridge, TBTA –The project consists of Installation of
Etab 2013 scour countermeasures, concrete and jacket repairs
Civil: Storm CAD v8i, Pond Pack V8i to substructures units, concrete repairs to south
Other: NYC Building Code, Manual Abutment exterior, Cathodic Protection etc. involves
of Steel Construction (ASD/LRFD),
under water work.
international Building Code, NYS
BPCA Phase 3 Pile Rehabilitation- Repair and
DOT Bridge Design Manual, NYS
Rehabilitation of Piles at Piers: Battery Park City
DOT Standard ACI Manual of
Esplanade Repairs involves protecting concrete piles
Concrete Practice, NYC DEP Storm
with a formed and poured in place protection epoxy
water system guidelines, NYS
grout system and repair concrete piles with a
Storm water Design Manual,
reinforced, formed and poured-in-place concrete
Construction Management
Standards of Practice etc. pile repair system – involves under water work.
Brooklyn Bridge Park Corp, Pier 3 Phase 1 (inshore)
Experience: Substructure Repairs: involves the installation of
Mr. Venkatagiriyappa has 20 years of
concrete encasements over existing deteriorated
progressive experience in designing and
timber piles with concrete extensions.
managing numerous projects in North
BPCA Pier A Plaza: Construction of Pier A Plaza
America and in India. These includes
adjacent to historic Pier A Building. The work
bridges, residential and commercial
involves grading, planting trees, developing irrigation
buildings, storm water management,
systems, reconstructing drainage systems, installing
infiltration/inflow study, utility
relocation and critical infrastructure flagpole base, installing planter wall, permanent
projects for such clients as the MTA NYC benches, site lighting, signage, ground hydrants,
Transit, NYS DOT, Connecticut DOT, and drywell etc.
the World Trade Center Rehabilitation. NYSDOT projects: Maintenance, Repair of Barriers,
Specializes in with Primavera P6
Fence, Signs in NYC ( Type 1and Type 2)
Scheduling and construction
management.
page 2
Ph: 631-***-**** email: acge88@r.postjobfree.com
8/2009 – 09/2013 02/2002 – 12/2007
C2GP Consulting Engineers, Bangalore New York City Transit (MTA)
Senior Project Manager Senior Project Coordinator
Design, construction and project management of Responsible for design and coordination of the
Ayurpark Health Care Facility Building, near Malur, following projects:
Vent Plant Rehabilitation Projects (over $40
Bangalore 55000 sq.ft Industrial, Project Cost: App.
$5M-$25millions million dollar projects) 1 & 9 Line Restoration
Managed construction, conducted quality Service,
World Trade Center, Downtown, Manhattan, NY
assurance and coordinated project with various
Lafayette Ave & Rockwell Place, Brooklyn,
private and public agencies.
Responsible for preparing complete master plan, NY6th Ave & 13th St. Manhattan,
NY6th Ave. & 30th St. and 21st St. Manhattan,
selecting architects, engineers (structural, civil
and mechanical), cost estimates etc. NY
Served as lead project engineer and manager. Work on these projects included:
Developed Master Plan and Cost Estimates. Preparation of Preliminary Drawings and
Analyzed survey reports, maps, blueprints and assessment of the impact of new structure on
other topographical and geologic data to existing utilities.
Collection and calibration of all the as-built
effectively plan projects.
Prepared Specifications and Quality Assurance information from the public agencies and field
Manual for project Prepared Tender Document investigation and preparation of fully
and Selected Construction Contractors thru coordinated unified subsurface utility
tender process. drawings.(D-drawings).
Inspected project sites to monitor progress and Preparation of test pit drawings to locate utilities
adherence to design specifications, safety with pinpoint accuracy. Found the potential
protocols and state sanitation standards. conflicts of existing utilities with new structures
Visited project sites during construction to and provided innovative methods of relocating
monitor progress and consult with contractors utilities saving cost and time of the project.
Preparation of new utility layout based on the
and on-site engineers.
Advised managerial staff about design, design criteria of ConEdison, ECS, NYSDEP and
construction and program modifications. others. Design of new sewer lines including new
Reviewed calculations and analytical data to routing, sizing of the pipes.
Performance of sewer hydraulic gradient design
maintain accuracy of the technical reports.
Reviewed and assisted in performing technical calculations.
Analysis of existing & new systems using Hydra
bid analysis.
Recommended and selected new and flow, storm water design program. Coordination
with NYSDEP and obtained approval from the
replacement test equipment to improve
same.
research and testing capabilities.
Preparation of preliminary estimate quantities
Estimated quantities and cost of materials,
and cost estimates for utility relocation.
equipment and labor to determine project
Review of Shop Drawings. Solved many
feasibility.
Solved issues related to labor management and construction issues during construction.
Suggested and successfully implemented
monitored project.
Supervised field engineer, quality engineer, innovative methods for rerouting the utilities,
optimizing design, improving quality of drawings.
mechanical engineer and other field and office
Supervised and managed construction.
staff.
Responsible for timely completion of the project.
page 3
Ph: 631-***-**** email: acge88@r.postjobfree.com
07/2000 - 02/2002 design calculations of storm sewage system
Hirani Engineering and Land Surveying, NY using Storm CAD.
Project Engineer Route 9A Reconstruction Project (segment 3,
Responsible for design, direct, coordination and NYS DOT).Prepared utility relocation plans,
management of the following projects. details and test pit drawings.
Westchester Industrial Complex, Westchester, LIE/CIP Interchange Improvement Project Exits
NY: Prepared the site plan and designed Gabion 30-32( NYSDOT). Performed design calculations
Wall, prepared plan and details. Performed for concrete Retaining Walls on soldier piles.
existing site drainage analysis for 5yr, 10yr and Prepared plans, sections and detailed
25yr flood conditions using Storm CAD, a storm reinforcement drawings.
water design program. Recommended methods
to control flooding during heavy rain. 01/1996 to 05/1997
Coordinated with Village Engineer and Obtained Purcell Associates,
approval for the site plan. Assistant Engineer, Glastonbury, CT
Drainage System design for New School Performed Design and Analysis of Substructures
Playgrounds: New York School Authority PS6X. for Merritt Parkway Bridge at Route 7/15
Analyzed existing drainage system for interchange. . Used STAAD and SEISAB for
playground and performed design calculations design analysis and calculations.
Performed design and analysis of buildings for
for new drainage system using HydraFlow, storm
water design program. Prepared Drainage Uconn, New Down town Campus, Stamford,
plans& details. Wrote specifications. Reviewed Project O Ansonia High School,
Reviewed shop drawings for buildings: Uconn,
Shop drawings and inspected the construction of
the drainage system. Avery Point Campus, Ansonia High School, Mead
Drainage System Improvements and Structural Elementary, Prenderghast Elementary, UCONN
Steel Repair Design at the Throgs Neck Bridge Ice rink.
(TBTA), NY. Included inspection, coordination of
the work with design & drafting teams and 07/1994 to 01/1996
prime consultants & TBTA. United International Corporation,
Performed Local Law Inspection Service: 421 Civil Engineer, Wallingford, CT
Prepared Infiltration / inflow study reports for
7th Ave, NYC etc.
city of Ansonia and complete sewer map from
07/1997 to 05/2000 detailed filed investigation and survey.
Performed analysis and design of medium span
Project Engineer, Bellmore, NY
Drainage Improvement-Routes 27/27a & Awixa highway concrete bridges: Bridge No, 04476,
Creek.Town of Islip (NYSDOT-Region 10). Berlin CT, Bridge No: 71006 Military Highway
Assessed the cause of the flooding and provided Over Millcove, Bridge No: 845, RI, Cahoone Rd
the solution to prevent any future flooding of Over Buck Horn Brook, Wolfe Fit Road Steel
the Route 27. Used Pond Pack 7.0 of Haestad Girder Bridge.
Designed precast voided deck superstructure
methods for modeling and analysis of the
watershed. Performed Hydraulic Calculation for and concrete abutments and wing walls on pile
10yr, 25yr, 50yr and 100yr flood. Prepared foundation.
Performed bridge inspections and prepared
Expanded Project Proposal (EPP) Coordinated
with NYSDOT and supervised the work of sub- reports.
consultant. Provided feasible hydraulic solutions.
Connecting Strathmore Office Park Sewage 02/1993 to 07/1994
System to Proposed Medford Apartments Woodward Clyde
Sewage System, Town of Brookhaven, NY; Long Staff Engineer, San Diego, CA
Assisted in preparing Storm Water Discharge
Island motor Parkway, Storm Sewer Design
(NYSDOT-Region 10). Performed the layout and Management plans 28 U.S Naval Bases for Army
Corps of Engineers, City of San Diego.