Shamnad puthiyapurayil
Sr.Piping Designer
E-mail: acgd59@r.postjobfree.com
Phone: +919*********
SUMMARY:
. I am having 12 years of experience in the Piping and Pipe line Design
of Front End Engineering (FEED) and Detail Design of ONSHORE and OIL
PORT projects including Chemical, Petrochemical, Refinery, Offloading,
and Oil and Gas sectors. During the course of my career, I have been
in detail design based on design office as well on site part of field
engineering team supporting construction on various engineering
issues. My role covers preparation of equipment layout, piping design,
development of Plot Plan, involved in construction support & co-
ordination with other disciplines.
. Conversant with international standards like ASME, ANSI, API
etc
. Having good communication and interpersonal skills.
CAREER HIGHLIGHTS:
. Conceptual study piping for developing, Equipment layout, plot plan,
GAD's, Isometrics and Material take-off (BOM).
. Involved in modelling of all piping layout for green and brown field
areas including details isometrics.
. Site visit to collect existing facilities information for revamping
activities, identifying Tie-In Locations as per P&ID, mark up drawings
and preparation of Tie-In packages.
. Experience in pump piping and Tank farm piping.
. Prepare and issue piping engineering drawings and technical documents
for Inter-disciplinary design checks (IDC's). Review and integrate
comments and inputs of other engineering discipline into the relevant
documents.
. Preparation for Tie-In spread sheet and attending progress meetings.
. Key member of piping team in defining various Tie-In points for the
new desulphurization units, revamping units with the existing
facilities.
. Key coordination from engineering side for the construction
activities.
. Preparation for Equipment and Piping Plans, Preparation for Bulk MTO,
and Isometrics.
. Detail design of Jetty Short Haul Berth and Suez Berth East & West
Detail design (CFP Project-WP). (Including detailing of loading arms,
pig lunching station, and metering skid).
. Detail design of Sulfur Priling piping which is part of SRU (Sulfur
Recovery Unit) Jacketed piping.
. Design and detailing of Fire water piping systems, coordination with
site fire department team to agree proposed tie-in point, location of
hydrants and monitors.
. Extraction of Isometric's and stages of MTO's from Model and
preparation final BOM from Iso's.
. Preparation of above ground tie-in package and associated process
preparation packs including co-ordination with operations Tie-In
coordinator for agreeing the location on field.
. Team coordination and participation in 30%, 60%, 90% model reviews
with the design team
. Involved in day to day communication with other discipline designers
to resolve interface issues.
. Involved in review of As-Built drawing submitted by sub-contractors.
. Involvement with projects from studies to IFC stage for EPC projects
and preliminary Issue for FEED. Piping Support Arrangement DWG's
preparation & Piping AS-BUILT dwg's
. Perform site survey and send feedback to design office for completing
the design of revamp units.
. Walk down with the operation for space reservation approval and
installation of above ground Tie-in Tags
. Engineering support for during construction activities and resolving
technical queries raised by sub-contractor.
. Reviewing of Hydro test pack's and Job pack's
. Support in during shutdown and Turnaround activities
Personal Information:
. Nationality: Indian
. D.O.B : 01-January-1980
. Languages: English and Hindi
. Passport : H5925896 (valid up to 09/08/2019))
. Marital Status: Married
Educational Qualification:
. Diploma in Mechanical Engineering
Courses:
. Piping design Course - 2003
Software:
. Auto cad v-2002-2010,
. PDMS V-11.6 - 12.0,
. PDS - V8 (Piping and Equipment)
. Microstation-J,V8 and V8i
. Auto sacs
. Smart Plant Review and Navisworks
Design codes and Standards:
. ASME B 31.1, B31.3, B.31.4 and B 31.8
. Exxon Mobil GP's and DP's
. Tank Nozzle spacing and Locations as per API-650
. General and engineering standards.
Trainings:
. HSE Induction trainings programs (Worley Parsons.)
. H2S awareness course from safety dept. (Worley Parsons.)
. Work permitting system training. (from Saudi Aramco mobile refinery)
PROFESSIONAL EXPERIENCS:
.
1. Employer: Worley Parsons Arabia Ltd.
Duration : Dec. 2010 - Dec. 2013
Role : Senior Piping Designer
A. Project : SAMREF Clean Fuel Project
Client: Saudi Aramco Mobil Refinery -Yanbu - Kingdom of
Saudi Arabia
Role : Senior Piping Designer
Project Scope : The objective of the SAMREF Clean Fuels
Project (CFP) is to reduce the sulfur levels in
Gasoline and diesel to 10 parts per million (ppm) in
order to meet the environmental regulations of the
Kingdom of Saudi Arabia (check the values of ppm).
Nature of work: Preparing Plot plan, Tie In package, piping Route
study, Piping GA, Isometrics, Piping Support.
Jacketed piping, LP and HP H2 piping, Firewater
network and engineering support for construction team
during construction. Piping software used PDS, Micro
station,
Achievements in CFP Project:
. Successfully completed 2012 shut down (CHD unit) Tie-In's
. Successfully completed YANPET (Sabic Group Petro chemicals) Tie-In's
Part of CFP project.
. Successfully completed design verification of 1500 piping Tie-In's
2. Employer: Hamco Arabia (Petrokemya-SABIC)
Duration : September 2008 - January 2010
Role : Senior Piping Designer
B. Project : Service contract ( updating for
inspection department)
Client: SABIC
Role : Senior Piping Designer
Project Scope : Revamping and making all Piping and
Equipment updating Layout
Nature of work: Preparing Plot plan, Tie In package, piping Route
study, Piping GA, Isometrics, Piping Support. Piping
software used PDMS, Auto Cad.
3. Employer: Bechtel-Technip joint venture (Saudi Aramco)
Duration : Feb 2006 to August 2008
Role : Piping Designer
Projects : Khursaniyah gas plant (green field)
KGP AND KPF
Nature of work: Preparing Plot plan, piping Route study, Piping GA,
Isometrics, Piping Support. Piping software used PDS,
Auto Cad, and Micro station
4. Employer: Consolidate contracting company co.wll (CCC)
Duration : Feb. 2005 to January 2006
Role : Piping Designer
G. Project : Al-jubail chevron project
Client: : Saudi Aramco
Project Scope : Revamping units (Pump, Exchanger.)
Nature of work: Preparing Plot plan, Tie In package, piping Route
study, Piping GA, Isometrics, Piping Support. PDMS
and Auto Cad.
5. Employer: ALSTOM ITALIA
Duration : Jan-2003 to January 2005
Role : Piping Designer
H. Project : SHOAIBA POWER PLANT PHASE-1
Client: : SCECO
Project Scope : Green field work
Nature of work: Preparing Plot plan, Tie In package, piping Route
study, Piping GA, Isometrics, Piping Support. PDMS
used Auto Cad.
Curriculum vitae
Shamnad puthiyapurayil