Serving at PARCO, Mid Country Refinery (MCR) Limited, Pakistan. PARCO is a

state-of-the-Art 100,000 BPSD fuel refinery, a joint venture between the

Government of Pakistan and Abu Dhabi (IPIC) and investment of about US $

886 million.

POSITION APPLIED FOR: SENIOR PROCESS ENGINEER/CHIEF ENGINEER

ACEDEMIC RECORD:

. Bachelor of Science in Chemical Engineering with 1st Division "A"

grade from N.E.D University of Engineering and Technology Karachi

(Sept 1996).

. MBA (Executive) in general Management from Preston University, Kohat

in 2005 with 4.0 GPA, first division "A" grade more than 93% marks.

. F.Sc. from Public school, Hyderabad with "A" grade (1990).

. Matriculation from Allama Iqbal (N) High School, Hyderabad with "A"

grade (1987).

PROFESSIONAL EXPERIENCE:

Total Working Exp: 18 Years (PARCO EXPERIENCE=16 Years, PRL EXPERIENCE =02

Years)

BRIEF CAREER HISTORY (18 YEARS)

30 AUGUST-2013 TO DATE

PRESENTLY RESPONSIBILITIES AS GROUP HEAD AT ABBU UNIT:

1. To comply with company's vision statement, mission statement, HSEQ

Policy & IMS standards in all respect while performing operational

activities at plant.

2. Review log book, job summary, labortary analysis etc. & giving feed

back to high-ups regarding operational progress & operational,

maintenance & administrative issues of plant.

3. Conducting meetings to evaluate operational, administrative &

maintenance issues of plant.

4. AABU Load management to ensure availability of feed material & product

keeping in view marketing demand and to ensure safe & smooth

operation.

5. Scheduling and planning about shut down and startup of AABU.

6. To ensure minimum inventory of asphalt either filled in drums or

bowzers in all grades as defined by M&C are available all time to

fulfill marketing demand.

7. Coordination with senior management in senior management audit.

8. Preparing and implementing HSE improvement plan.

9. To fill yearly appraisal (PMP) performance of AABU staff based on

their operational, behaviour & assignments.

10. To maintain quality of product during plant operation & ensure in time

delivery of product & maximum product dispatch.

11. To run SAP to raise notifications of plant either for routine or

critical job.

12. Raising IRS/QRIS for safety related/quality related issues in plant.

13. Conduct IMS audit and record keeping.

14. Preparation of bar charts for scheduling and planning of maintenance

activities.

15. Coordinate in development of JSA with HSE.

16. To cross check attendance record of AABU contractor labour & verifying

invoice for gantry services.

17. Raising analysis request for special samples & coordinating labortary

staff for sampling and follow up their results.

18. Technical evaluation of chemicals from vendors.

19. To raise CR for operational improvement in area and to collect

relavant data, material to be presented in TRCs.

20. To attend TSR meetings with all stake holders.

21. To coordinate with ESD about CR package,design packages and for HAZOP

approval and follow up till implementing modification in plant.

22. To attend kick-off meeting with contractors before start of

modification job.

23. Supervise the modification job, ensuring that all safety & MCR

standards are met.

24. Coordinate in making budget as budget coordinator for both capital and

revenue budgets.

25. Cost estimation for purchase of equipment, material and provide

services hired for miscellaneous activities in the area.

26. Provide training to new coming trainee engineers/operators.

27. Deliver presentation to visitors, trainees & officials visiting plant.

28. Conduct and prepare test for trainee engineers/technologists.

29. Review of preparing SOPS of plants.

30. Preparation and review of check lists, log book,job summary of plant.

31. Keeping watching drum filling activity, bowzer filling and preparation

of PC order.

32. In time feed back to high-ups regarding operational maintenance issues

at AABU.

33. Monthly report preparation.

34. Sectional meeting notes.

35. Departmental & safety meeting notes

36. Correction in blends of different product tanks with different recipes

37. Adjustments of fed and air flow to adjust required grade of bitumins

38. Technical study reports preparation and prepared many presentations

presented before technical review committee to approve CRS.

39. Preparations of wish list and budget preparations.

40. Misc. letters & memos.

41. Monitors performance of units with a view to improve yields, equipment

performance & product quality.

42. Identifies losses and utility consumption

43. Undertakes trouble shooting of process units

44. Conducts performance and test runs of process units

45. Prepares fuel balance

46. Compiles data on consumption of catalyst & chemicals

47. Prepares PIDs for modifications

48. Conducts/coordinates debottlenecking / modification studies

49. Coordinates special environmental sampling requirements

50. Monitors the treatment systems for cooling water and boiler feed

water.

51. Evaluates condensates/ crude oils for processing by the refinery

52. Provides advice on receipts of feed stock, product blending

53. Prepares monthly and yearly plans for throughputs and production.

54. Liaises with the marketing group and participates in coordination

meetings with the marketing group.

55. Provides technical support to EHS section

(JUNE-2011TO AUGUST-2013)(2.2 YEARS)

JOB RESPONSIBILITIES AS UTILITY & OIL MOVEMENT ENGINEER:

1. Execution and, issuing of number of work permits

2. Safe gantry operation

3. Run maximo

4. Run SAP

5. Preparation of SOP

6. Preparation of IMS documents

7. Participation of TRC and HAZOP meetings

8. Preparation of shift reports

9. Man power management/adjustment

10. Caught of no. of tank lorries due to theft and letter prepared for

Charges for leaky tank Lorries

11. Prepared "Excel based notification sheet"

12. No. of incidents reporting system (IRS) raised for maximum tank

Lorries about safety related issues of tank Lorries.

13. preparing excel based "Check list for tank Lorries movement in TLG

area"

14. Preparation of data required for issuance of monthly report every

month.

15. Monitoring all activities of "Sulfur storage yard."

(July-2010 to June-2011(1 Year)

JOB RESPONSIBILITIES AS R&D ENGINEER:

1. Study of no. of four CR'S, presented in TSR meetings and

implemented at plant.

2. Issuance of weekly, monthly departmental minutes of meeting.

(JAN-2001 TO JULY-2011(APPRX.11 YEAR)

JOB RESPONSIBILITIES AS TECHNICAL SERVICES ENGINEER/QUALITY MANAGEMENT

SYSTEM (QMS) ENGINEER:

1. Involved in master start-up of Crude Distillation Unit in PARCO.

2. Development in Process Flow Diagram (PFD) & Process & Instrument

Diagram (P&ID).

3. Review of operating manuals.

4. Troubleshooting, Process Optimization and Monitoring of Meroxes & SRU

unit.

5. Conducting technical studies regarding to process optimization, cost

effective modification.

6. Performance monitoring of the Meroxes & SRU unit and monitoring of

plant parameters.

7. Preparation of monthly monitoring report.

8. Planned and Emergency shutdown procedures and bar charts.

9. Material and Energy Balance.

10. Catalyst Performance Monitoring.

11. Study of technical Report.

12. Development & management of new QRI software. Reduced frequency of

repeated QRI's.

13. QRI presentation on monthwise.

JULY 1999 TO JAN-2001 (APPRX.1.5 YEAR):

JOB RESPONSIBILITIES AS OPERATION ENGINEER:

1. Started the career with PARCO as member of IPMT (Integrated Project

Management Team) during pre-commissioning and commissioning.

2. Remained involved with the commissioning team as member of JCT (Joint

Commissioning Team) for the commissioning of equipments of process

units.

(FEB 1999 TO JULY 1999 (.0.5 YEAR):

JOB RESPONSIBILITIES AS CHEMICAL ENGINEER:

1. As chemical engineer reviewed process operating manuals of

CDU/CVDU.

2. Also prepared drawings of CDU/VDU on Visio technical software of

individual loops.

SEPT 10, 1996 TO SEPT 9, 1998:

Pakistan Refinery Limited (PRL)

1. Worked as graduate trainee engineer (Chemical) in Pakistan Refinery

Limited (PRL) In Technical Services Dept (TSD) worked in crude, Hydro,

Platforming and Utilities & completed my apprenticeship training.

2. Expedited technical evaluation of chemicals used in process area

3. Diethanol Amine (DEA), Methyl Di-Ethanol Amine (MDEA) Sulfuric Acid

Antifoaming agent Preparation/forecasting of inventory budget, capital

budjet for TSD department.

4. Forecasting of next five years capital budget for the section.

CAREER ACHIEVEMENTS/ APPRECIATION:

1. Prepared, developed & implemented on line live Dynamic Process

dynamics overviews. for good unit monitoring. Preparation of SOP

for the safe execution of catalyst loading of Kero Merox Reactor.

2. Many times performed replacement activity of activated carbon

from (820-V58) at SRU (U-820). Development of new QRI software.

With help of this system, reduced frequency of repeated QRI's.

3. Monitoring of shutdown and startup of unit. Calculation of

shutdown loses after a power dip failure

4. Reviewed operating manuals, Process Flow Diagram (PFD) and Process

& Instrument Diagram (P&ID).

5. Member of Turnaround team for Turn Around 2002(OCT-2002) and 2007

(March-12 to April-12, 2007

6. Conducting no. of (CR studies) regarding to optimization, cost

effective

7. Reduction in lab tests frequency of all concerned units in order to

optimize cost as well as man hour.

8. Preparation of SOP for Passivation and Sulfiding of Scot catalyst.

9. Worked with UOP engineers during start up phase of refinery.

10. Coordination for start up and shut down activities.

11. Chemical cleaning of plate and frame exchangers (820-E53 & 820-

E54).

12. Significance of running Tail gas treating section.

13. Prepared" Excel based notification sheet" and made as a part of log

book

14. Handled to run plant with safe, smooth & efficiently with minimum

man power requirement.

15. Contributed role in caught of maximum no. of tank Lorries due to

theft, fake dip chart etc

16. Optimized steam balance of Kero Merox, LPG Merox, Amine Ttreating

and Sulfur Recovery Units

SOFTWARES USED BY MYSELF:

1. QRIMS,Quality related incident management system (For generation of

QRI's and their investigation reports)

2. MOC, Change request system (For generation of plant

modification/change requests)

3. IRS, Incident reporting system (For generation of safety related

incident reports and their investigation reports)

4. PICS (Plant Information and Control System), online process

parameters trending

5. CMMS, Computerized maintenance management system (SAP) as an end

user.

6. Local area net work (mcrintranet)

7. Lotus Notes e-mailing system

8. MS Office 2000,MS Windows 2000,Ms Word, Ms Excel, Ms Power Point

Visio Tech, EDP, Internet

TURN AROUNDS ATTENDED

(AT PARCO):

1. Attended TA-01 (2002) of Pak Arab refinery Limited as TSD Engineer

of CDU/VDU Units.

2. Attended TA-02 (2007) of Pak Arab refinery Limited as process

Engineer responsible for all turn around jobs of Process Area and

also Area Engineer of Meroxes & SRU Units.

3. Participated in the shut down of Pak Arab Refinery Limited as

process Engineer (2007).

4. Attended several mini shut downs due to heat exchanger leakages and

power break downs etc.

(AT PRL)

1. Attended mini shut down in Pakistan Refinery Limited, Karachi

(1999) as TSD Engineer.

PROFESSIONAL MEMBERSHIP:

. Member of Pakistan Engineering Council (Reg. No. CH/3297)

PERSONAL PROFILE:

Father's Name Syed Anwar Ali

Date of birth August 29, 1972

Nationality Pakistani

Blood group B+ve

Domicile Hyderabad (SINDH)

Driving Liscence No 32630

Passport No XK1797301 (DATE OF ISSUE: 26 th March-2012)

(Date of expiry 25 March-2015)

CNIC No 32303-9501730-5

Martial Status Married with two children

Dependents Father & Mother

Present Address J-12#002, PARCO Housing Complex, Qasba Gujrat

District Muzafar garh, Pakistan

Permanent Address Same as above

Contact Nos: Tel.office:+92-66-229****, Ext: 2793

Tel.Res. +92-66-229****

Cell No. +92-300*******

POSTAL CODE: (092-34121)

REFERENCES:

Muhammad Qamar Qureshi (Advisor Engineering Services, Parco) E-mail:

acga1y@r.postjobfree.com

Abid Hussain Qureshi (Manager Process, Parco) E-mail:

acga1y@r.postjobfree.com[pic][pic][pic]

Group Head (Asphalt air blowing unit)

1) B.Sc. Chemical Engineer (1996)

2) MBA (Executive)( 2005)

acga1y@r.postjobfree.com

+92-66-229****(ptcl) Cell: +92-300-******* +92-335-*******



Contact this candidate