Power Plant Project

Location:
Batangas, CALABARZON, Philippines
Salary:
Negotiable
Posted:
January 06, 2015

Contact this candidate

Resume:

RESUME

* **** : Debashis Banerjee

* ******’s Name : Late Mukul Chandra Banerjee

25th December 1965

* **** ** ***** :

* ******* ****** : Married

* ******* *** : Debashis Banerjee, #189, Health Society,

Annapooerneshwari Nagar, 1st Main, 10th Cross,

Communication

Nagarbhavi, Bangalore.

6 Email Id : Debashis.banerjee @ in.abb.com

acg9ui@r.postjobfree.com

7 Category : GENERAL

8 Languages Known : Hindi, English, Bangla, Gujarati.

9 Phone No. : 097********

10 Academic : BE (Electrical)

Qualification

11 Year of passing Out : 1989

12 Organizational : As Detailed Below

Experience

12 (a) Oct’10 till date : ABB Limited, PS – E BOP, Peenya, Bangalore

12 (b) April ’08 to Sept’10 M/s Reliance Energy Limited for 6x660MW Sasan Ultra

Mega Power Project.

12 (c) Jan ’95 to April ‘08 : M/s Gujarat Industries Power Company Limited for its

2x125 Mw Surat Lignite Power Plant at Village Nani Naroli,

Mangrol, Dist: Surat

12 (d) Nov’89 to Jan ‘95 : M/s NEPA Limited for its 30 MW Captive Power Power

Plant

13 Total years of : 24 Years.

Experience

Contd...2...

-2-

Career Sketch & Growth:

Sr. Organization Position Held Duration: From/ To

No.

1st Oct 2010 till date

1 ABB Limited, PS- Asst. Vice President &

EBOP Vertical Manager for

>600MW Coal Based

Thermal Power Projects

From 25th April 2008 to 22nd Sept

1 Reliance Energy General Manager

Limited-EPC Division (Electrical) for 6x660 2010

MW Sasan Ultra Mega

Power Project.

2 Gujarat Industries Manager (Electrical) for From Jul’06 to April’ 08

Power Company 2x125 MW Surat Lignite

Limited. Power Plant.

Deputy From Jan’04 to July’ 06

Manager(Electrical)

Sr. Engineer (Electrical) From Nov ‘97 to Dec ‘03

Engineer (Electrical) From Jan ’95 to Nov’97

3 Nepa Limited, Shift In-charge (Power From Nov‘91 to Jan ‘95

Nepanagar, M.P House)

Management From Nov’89 to Nov’91

Trainee(Power House)

PROFESSIONAL SYNOPSIS

An Electrical Engineer with about 24 years of extensive experience in Project Management,

Procurement, Techno-Commercial Operations, Erection, testing and Commissioning,

Maintenance, Purchase, Spare Part Management, Process Improvement, Contracting and

QA/QC in the Power Plant and utilities. Adept in the planning of preventive, predictive and

breakdown maintenance schedules, streamlining existing plant systems, maintaining

inventories and coordinating for engineering. Carrying out day-to-day maintenance, annual

overhauling and capital over hauling of Turbine Generator and auxiliaries system effectively.

Demonstrated analytical, problem solving and organizational ability coupled with strong

communication and relationship management skills. Also played stellar role in turning around

business operations in all organizations worked with. Have acquired valuable insights into the

project conceptualization, planning, Scheduling, coordination, erection and commissioning of

various electrical systems. Have demonstrated abilities in achieving cost savings across

assignments & minimizing performance bottlenecks for achieving high productivity with

maximization of men, material & machine and adopting energy Conservation/saving

measures.

B.E (Electrical) from Government Engineering College, Bilaspur (M.P) 1989.

Contd.3...

-3-

CORE COMPETENCIES

Techno- Commercial Operations

Project Procurement (Electrical Equipments & Contracts):

ü Preparing technical & commercial offers/ proposals along with handling tender/ contract /

billing related formalities & documentation for procurement of capital spares, project and other

equipment’s.

ü Evaluating vendors based on pre-qualification criteria, Selecting and short listing vendors,

issuing tender Documents/ specification to approved short listed bidders as well as handle

receipt & opening of Techno-Commercial bid documents with finance Dept.

ü Preparation of TER (Technical Evaluation Report)

ü Arranging Techno-commercial meeting with all Bidders and freezing of all technical and

commercial open points as well as awarding contract to successful Bidders.

ü Using latest software SAP R/3 for procurement/generating MIS reports.

Erection & Commissioning

ü Handling erection, testing and commissioning of major Electrical equipment, machinery’s etc,

as well as handling facilities for completion of projects in stipulated time/cost parameters.

ü Reviewing plant layout/drawing, approving them and carrying out inspection tests for

determining the effectiveness of the equipments/ plants.

ü Achieving Work plan scheduled targets by effective utilization of human resources, plant and

machinery and enhancing productivity.

Maintenance & Operations

ü Scheduling and planning predictive, preventive and breakdown maintenance jobs with key

focus on spares availability and root cause analysis. Carrying out day-to-day maintenance.

ü Preparing maintenance plans, annual shutdown jobs/schedules for reducing machinery

downtime to minimum for ensuring smooth production.

ü Preparing maintenance plans for capital overhauling of 2x125 MW Turbine Generator and

auxiliaries. Carrying out capital overhauling in stipulated time and preparing overhauling

report.

ü Providing technical support after the installation and commissioning of plant/ equipment as

well as conducting tests & inspections to ensure operational effectiveness of plant & utilities.

ü Carrying out annual overhauling work of Generator and equipments, modifications, major

repairs to improve the equipment efficiency.

Quality Assurance/ Quality Control/ Documentation

ü Overseeing implementation of ISO-9001 quality system procedures and work instruction and

ensuring adherence to various rules and regulations laid.

ü Achieving Quality targets by installing foolproof methods, providing training to technicians,

developing & modifying skill sets.

Contract Management

ü Overseeing the work covered in the scope of contract is being carried out in accordance with

latest technical standards and as per the statutory rules and regulations in force.

ü Maintaining high degree of supervision and checks over the quality of work being carried out

within the contract including proper measurements and release of payment to contractor after

verifying the material reconciliation and the movement of the material .

ü Closing of contract after checking all legal & commercial aspects.

Spare Part Management/ Purchase/Procurement

ü Codification of spares for individual equipment and generating indent for all required essential

spares while controlling the inventory. Overseeing the status of moving, non-moving and

capital spares for effective utilization. The SAP analysis is being effectively utilized for

maintaining maximum & minimum quantity of spares.

ü Technical evaluation of the offers for the spares and negotiation with the vendors considering

the prevalent market conditions.

Contd...4...

-4-

ORGANISATIONAL EXPERIENCE WITH NOTABLE ACCOMPLISHMENTS

October 2010 till date:

Presently working with M/s ABB Limited as Asst. Vice President (Power System) and

Group/Vertical head for Power projects 600MW and above and responsible for complete project

management for executing Electrical balance of plant facilities for :-

a) 2x600MW Thermal Power project for M/s Coastal Energen Pvt. Ltd., Tuticorin.

b) 400 KV GIS for Coastal Energen Pvt. Ltd. comprising of 6 Bays.

c) 2x800MW Thermal Power project for APGENCO through Tata Project Limited coming up

at Krishnapattanam.

d) 2x660MW Thermal Power Project for M/s NCC Ltd., Hyderabad.

e) 2x210MW Thermal Power Project for Surana Power Projects, Chennai.

Current responsibilities include:-

Ensure completion of the project within budgeted cost estimate & project schedule while

improving the profit margins estimated at the time of receiving order inclusive of Risk

Management.

Leading a team of 25 engineers and responsible for executing Electrical Balance of plant for Coal

based power project of capacity 2x600MW,2x800MW,2x660MW,2x210MW Thermal Power

project for Coastal Energen, APGENCO through Tata Project Limited, NCC Ltd. and Surana

Power Projects Ltd. coming up at Tuticorin, Krishnapattanam, Nellore and Raichur respectively.

Monitoring the project in terms of schedule and cost.

Approving the Project Master Schedule prepared as per the Contract guidelines as per

PERT/CPM technique. Providing guidance in developing the progress calculation sheet.

Analyzing the major scope of work (as per the Contract) and discussing with disciplines for

criticalities.

Approving the Purchase Request (PR) released on receipt of Technical Engineering specification

from Engineering.

Discussing with vendors and nominating expeditors for manufacturing updates.

Nominating the team for Invoice release to Customer and collection of the payment. Also to

approve the BBU based on which the team shall be guided for raising the Invoice.

Implementing a periodic MIS reporting and Claim Management Procedures.

Making correspondences with client to build Customer relationship and sort out any disputes

(technical or commercial).

Responsible for Project Cost control and analysis

Responsible to control on site activities for erection progress and resolving site discrepancy

reports with engineering. Coordinating with Procurement department for shortage damage report

from site.

Responsible for identifying the training needs for own department and arrange for the same,

through Personnel Department, as and when required.

Planning of machinery/manpower/materials and money; dealing with consultants/ licensors/

statutory bodies for compliance of requirements.

Installing and commissioning as well as conducting tests & inspections to ensure operational

effectiveness of utilities and equipments.

Overall management of project which includes Erection & Commissioning, Material Management,

Environment Management, Commercial, Statutory & liaison activities.

Contd...5...

-5-

Co-ordination with site for completion of project with agreed performance parameters and as per

the time Schedules.

Leading, monitoring & mentoring the performance of team members to enhance efficiency in

operations and to achieve individual & group targets with more employee satisfaction.

The scope of work for the M/s Coastal Energen, APGENCO, M/s NCC Ltd. includes Supply,erection, testing and commissioning of 400KV GIS/AIS Switchyard, transformer yard (which

includes 315/250MVA Single phase units Generator transformer, 100/50MVA Station

transformer, 75/45 MVA Unit Transformer, 16 MVA Unit auxiliary Transformer and Service

Distribution Transformer),HV/MV/LV Switchgear,24KA Generator Isolated phase bus duct,

SPBD, NSPBD, entire interplant HT/ LT/Control Cabling, Battery& Battery Charger, UPS, PA

System, Earthing and Lightning Protection system, Complete Plant Illumination ( Both Indoor &

Outdoor), Plant Communication and PA system.

Notable Accomplishment:-

2x600 MW Coastal Energen TPP:-

100% engineering is completed & procurement action for more than 90% of Equipments is

accomplished in just 8 months period.

66% of total order value is executed by means of timely delivery of GIS equipments, 250 MVA

Generator transformers, ST,UT, service Transformer,HT,LT cables,MV switchgear, battery,

battery charger etc. by maintaining the profit margins intact and also improving the margins by

engineering Optimizations, Vendor negotiations, controlling man hour deployment,reducing

wastage and pilferage of material.

More than 60% Site execution work is completed since release of partial fronts two months back.

2x800MW, APGENCO,:-

Startup power commissioned along with 11KV and 3.3KV system. Commissioning of 0.415 KV

water treatment plant, FOPH, Fire water System, Coal handling system, Illumination work etc.

under progress and Unit 1 is in advanced stage of synchronization.

April 2008 to September 2010

(RELIANCE INFRASTRUCTURE LIMITED-_EPC DIVISION)

Worked with M/s Reliance Energy Limited for its EPC Division as General Manager (Electrical)

posted at Sasan (M.P).

Was Package Owner for BTG-Electrical and responsible for Electrical

Erection/testing/commissioning work of BTG package of 6x660 MW Ultra Mega Power Project.

Responsible for review of DBR, tender documents, Engineering Drawings etc.

Managing Construction Contractors at site for execution of Electrical works as per scope and

maintaining Quality as per approved Field quality Plan while maintaining safety of man & machine

having the top most priority.

The Job Profile mostly included following:-

Assisting Project Director in ensuring that the Project is commissioned in time.

Erection and commissioning of all electrical equipments pertaining to Boiler, Turbine, TG

and other Auxiliaries.

Participating in project review meetings for scheduling & monitoring of site construction

activities.

Coordinating Material requirement based of planning with sub contractors.

Ensure that equipment/materials received are in accordance with the quantity & quality.

Implement QA / QC procedures and checks.

Supervision of Electrical construction activities of BTG main plant

Planning, executing and coordinating the work between different agencies engaged at the

work site

Coordination with all Departments for meeting Project deadlines.

Ensuring smooth TG & Auxillaries Erection activities as per project cost and time plans.

Contd...6..

-6-

Ensuring that equipment/materials received are in accordance with the project

requirement.

People Development.

Notable Accomplishment:

Timely completion of following Installation maintaining quality/safety and within targeted

budget:-

A) Erection/testing/commissioning of 2 No. 33KV line bay at MPEB Sub station

B) Erection/testing/commissioning of 33/11KV switchyard at receiving end to facilitate

construction Power.

C) E/T/C of 13 Km 11 KV Ring Main Lines with 10 no. 11/0.433KV substations.

D) E/T/C of 35 No. 25/16 Mtr. Lighting Mast in BTG Area to facilitate round the clock erection

work.

E) Electrification of 2 No. 60Cum/Hr batching Plant.

F) Electrification of 200TPH Aggregate Crushing Plant.

Jan ’95–April ‘08

(GUJARAT INDUSTRIES POWER COMPANY LTD (GIPCL)., 2X125 MW SURAT LIGNITE

POWER PLANT, DIST: SURAT)

PROJECT PHASE:

Assignment Handled: 2x125MW Surat Lignite Power Project

Have been a part of Project Management Team and have worked from owner’s side for timely

completion of 2x125MW Surat Lignite Power Plant.

Accomplishment is as under:-

- Coordinated for preparing project report in tune with the requirements of Central Electricity

Authority, New Delhi as per the Basic Engineering done by M/s Tata Consulting Engineers,

Bangalore.

- Interfaced with Water Resource Department, Environment department, Central pollution

control Board, Gujarat Electricity Board for necessary approvals and sanctions.

- Was responsible for procurement of following Main equipments inclusive of review of DBR &

Specification, preparation of TER, Techno-commercial evaluation of offer considering

technical & commercial loading and putting up recommendations to Contract & Commercial

Cell :-

Switchyard equipments Viz. 220KV class SF6 Circuit Breakers, Isolators, CVT, Current

Transformers, Lightning Arrestors, Insulators, Hardware’s etc.

10KA generator Isolated Phase Bus duct.

150 MVA 220/10.5 KV Generator, 25 MVA 220/6.9KV Station & distribution transformers

of 2/1.6/1.25/1 MVA/0.5 MVA capacity

HT/LT power & control cables

6.6KV& 415V Switchboards

220V & 24V Battery & Battery Chargers

Earthing equipments like Neutral grounding transformers, Neutral grounding resistors.

- Successfully erected, tested and commissioned Electrical equipments in the power system

like 220KV switchyard equipments, Power & distribution Transformers of capacity ranging

from 150MVA to 500KVA, 2x125MW Turbo-Generators, 10KA Generator Isolated phase bus

ducts, 6.6KV HT Unit & Station Service Board Comprising – Vacuum/SF6 Circuit Breakers,

415V Unit & Station LT Boards, Battery & battery chargers, HT & LT power & control cables,

Complete Electrical System for BOP, Lignite & Limestone handling System and Ash Handling

System.

- Carried out performance tests of Turbo Generators, Boilers and other System to ascertain that

the equipments and Systems offered by vendors is within the performance limits as

guaranteed at the time of acceptance of offer and as per relevant Standards.

Contd..7..

-7-

OPERATION & MAINTENANCE PHASE

After commissioning of both 125MW units and declaration of commercial operation, I was

responsible for Electrical maintenance of plant and the accomplishments during O&M phase is

as under:-

- Finalization of Annual Electrical Maintenance Contract for main plant and BOP.

- Coordinated efforts for smooth implementation of AMC’s.

- Co-ordinating effective execution of Annual Maintenance Contracts and Annual Service

contracts by proper planning & scheduling of activities during Annual shut down and carrying

out day-to-day maintenance of Electrical System of 2 X125 MW CFBC thermal power plant.

- Successfully maintained Power Systems viz. 220KV switchyard, EHV transformers, 6.6KV

HT power Switchboards, Cabling Network, Distribution transformers, 415V LT switchboards,

Earthing equipments, 6.6KV squirrel cage /slip ring induction HT motors, actuators, Valves,

6.6KV overhead lines.

- Directed the testing of protective relays and co-ordinated the relay settings.

- Finalized annual rate contract for servicing of 6.6KV SF6 Breakers/ vacuum circuit

breakers/contactors, LT Air circuit breakers, Battery Capacity test, Battery Chargers, 6.6 KV

HT Motor Overhauling and rewinding of 415V LT motors, Hot Line washing of 220 KV

Switchyard equipments.

- Developed a strategy for import substitution of spares through indigenous supply rather than

export orientation.

- Developed methodology of recording Equipment History of all preventive activities carried out

on various Electrical apparatus, which has helped in root cause analysis of recurrent defects

and thereby have reduced equipment/system downtime.

- Provided technical service for Developing Workshop to carry out overhauling of LT motors,

Actuators etc.

- Consistently affecting modifications in the system based on feedback received from

operations department to reduce downtime.

- Conducting Energy Audits and implementing various projects for energy savings.

- Actively coordinated efforts for reducing Auxiliary Power Consumption from 11.59% of Plant

Installed capacity in Year 2001-2002 to 10.29% in the year 2004-2005.

- Streamlined the operation of 6.6KV overhead line feeding power to Captive mines which had

frequent tripping on earth fault.

- Streamlined the operation of 220KV Switchyard which had frequent failure of insulators due

to low creepage distance and dusty environment. The failure resulted into total generation

loss & heavy penalty as per Power purchase Agreement with State Electricity Board.

- Identification of Critical, Insurance and non-moving spares and inventory control.

- Co-ordinating statutory compliance of the Electrical system as per the state Electrical

inspectorate.

- Co-ordinating Condition monitoring &Predictive maintenance of HV & EHV Electrical

equipments.

- Core team member for implementation of SAP –Plant Maintenance Module.

- Core team member for implementation of ISO-9001.

- Adept in Problem solving skills and mentoring juniors & subordinates to achieve the desired

results.

Contd..8…

-8-

Nov ’89 –Jan‘95

(NEPA LIMITED, NEPANAGAR A LEADING PUBLIC SECTOR UNDERTAKING

MANUFACTURING NEWSPRINT PAPER)

Assignment Handled: Commissioning of 12.27MW Turbo-Generator, Operation & maintenance

of 30MW Captive Power Plant

- Carried out Operation and maintenance of

6.6KV, 12.27MW, BHEL make Condensing cum extraction Turbo-Generator

3 no., 6.6KV, 5.0 MW, Westinghouse make Condensing Turbo-Generator

6.6KV, 2.0 MW, Westinghouse make Back pressure Turbo-Generator

63KVA DG Set along with AMF Panel.

- Electrical Maintenance of

EHT, HT &LT Circuit Breakers viz. Bulk Oil Circuit Breaker, MOCB, VCB and Vacuum

Contactors

HT &LT cable selection, routing and laying

Power Control Centres, Motor control centres etc.

Electrostatic Precipitators

- Operation of

63 KG/Cm2, 75MT, BHPV make Boiler having superheated steam temperature of 460

degree centigrade.

400PSIG, 8000LBS, Combustion Engineering Boiler.

ACADEMIC PROJECT

Title Solid State Power Factor Meter

Description The project entailed developing a meter which can precisely measure the power

factor with highest accuracy and which can simulate the operation of PF correction

equipments.

ACADEMIC CREDENTIALS

- B.E (Electrical) from Government Engineering College, Bilaspur, M.P in 1989

IT SKILLS: Conversant with Windows, Microsoft Word, XP

Expected Salary: Negotiable.



Contact this candidate