Wesley Brack
Eatonton GA 31024
acg9ts@r.postjobfree.com
** ***** ** *** ** day OPERATIONS experience working in
the field as an EQUIPMENT OPERATOR.
** ***** as a NUCLEAR PLANT OPERATOR in Vogtle 1 and 2
control rooms. A very motivated employee who goes the
extra mile to be the team player, helps co-workers with the
Condition Report process, and attends to our processes while
doing the job safely.
ACCOMPLISHMENTS
* Maintained my Reactor Operator's
license for 11 years while attending Requalifi-
cation training every 5 weeks. This
training involved written tests and simulator
exams.
* Recognized and avoided a major fire in
the Radioactive Controlled Area at Plant Vogtle
Unit 2 that would have resulted in an
unprecedented amount of OFF LINE Time.
PROFESSIONAL EXPERIENCE
Georgia Power Company-Eatonton GA 31024
2006 to Present
Plant Branch Fossil Fuel Generating Station
Auxiliary Equipment Operator
. Entered training for AEO. The AEO's perform
field operations in the plant for the control
rooms.
. As a newly transferred employee, a need was
recognized for performing our Handheld
computer rounds. Attempts were made to help and
to train seasoned Equipment Operator's in the
comfortable use of the hand held computers. Also
attempted to engrain in these Equipment
Operator's the importance of entering our field
readings in the computer. This mainly being for
Plant Engineer's need be able to trend normally
unmonitored parameters in our plant.. I was
finally backed up when Corporate ACE initiatives
were implemented.
. Lead Plant's Scherer and Plant Branch's staff in
writing Maintenance Work Orders
and Subsequently Condition reports.
These MWO's and CR's are the initial step for
Maintaining our equipment free of
problems and inoperabilities.
Received training for Boiler
Turbine Operator as Management extends TRAINING
Opportunities prior to plant's
closing.
Southern Nuclear Company-Waynesboro GA 30930
1996 to 2006
Plant Vogtle Electric Generating Station
Nuclear Plant Operator (Licensed)
* Successfully Operated Vogtle Unit's 1
and 2 at Optimum/Normal Operations per
Our Station Procedures and Tech
Spec Limits.
* Directed our System Operators for
Safe and Correct work in the field for each Unit
At Plant Vogtle.
* Constantly monitored our control
panels and computers for proper operations of
the Nuclear Units.
Assistant Plant Operator
1991 to 1995
(Nuclear Plant Operator in Training)
* Successful completion of Reactor
Theory/Heat Transfer and Fluid Flow/and Simulator
Training and Weekly Testing to
maintain position in class.
* Participated and completed On The Job
Training.
* Participated in 2 Hot License classes for the NPO
job successfully completing
The class on second attempt.
Plant Equipment Operator
1992 to 1993
1985 to 1990
* Participated in Unit 1 and Unit 2
Startup Testing Program from Initial Energization Of
Reserve Transformers until
completion of Unit 2 Commercial Operation.
* Performed all necessary duties as far as Field
Operations for the control rooms.
This includes normal shift equipment rounds.
Worked to write condition reports
On Plant Equipment problems when needed.
* Successfully performed Normal Procedures and
Surviellances with the control
Room.
* Always maintained a high sense of awareness
while working in the plant to ensure
Proper operations.
. Performed fire brigade and Emergency Response
duties when assigned per shift
manpower..
Utilityman
1985
to 1985
* This entry level job maintained our
plant at optimum cleanliness.
* With Overtime being offered to all
Utilitymen, I worked 88 consecutive days in order
To maintain our plant at our
attained cleanliness level.
Education and Training
* US Nuclear Regulatory Commission
Nuclear Plant Operator License for Plant Vogtle
Unit's 1 and 2
* Associate Degree in Computer Science-
Abraham Baldwin College-Tifton GA (1983)