Post Job Free

Resume

Sign in

Power Plant Engineer

Location:
Manila, NCR, Philippines
Salary:
6000 us dollars
Posted:
December 26, 2014

Contact this candidate

Resume:

MARTIN L. TAMBIEN

Margarita Village, San Carlos City, Negros Occ.

Tel#: 006***-*******

Cell phone#:006***********

Email: acg5sj@r.postjobfree.com

OBJECTIVE

A MECHANICAL ENGINEER seeking the position of PLANT MANAGER using my

working experiences in the feasibility study, project development and management,

training, commissioning, operation and maintenance of THERMAL POWER PLANTS

particularly on STEAM TURBINES, BIOMASS FIRED BOILERS, CIRCULATING

FLUIDIZED BED COAL FIRED BOILERS, and GAS TURBINES AND RO

DESALINATION PLANTS.

WORKING EXPERIENCES AND ACCOMPLISHMENTS:

TECHNICAL TRAINING MANAGER

FDC UTILITIES, INC.

FDC MISAMIS POWER CORPORATION

405 MW CFB COAL FIRED POWER PLANT

PHIVIDEC, VILLANUEVA, MISAMIS ORIENTAL.

August 16, 2014 up to the present

TRAINING PROGRAM. BUDGETS. RECRUITMENT. COMMISSIONING.

ENGINEERING DESIGN REVIEW.QUALITY MANAGEMENT.COMMUNITY

RELATION.

PROJECT MANAGER

FDC UTILITIES, INC.

PBCOM TOWER

AYALA AVE. MAKATI CITY

July 2011, to August 15, 2014

FEASIBILITY STUDY OF 3 UNITS 135 MW CFB COAL FIRED POWER PLANT. SITE

ASSESSMENT.DUE DILIGENCE. MINIMUM FUNCTIONAL

SPECIFICATIONS.TENDERING. PROJECT DEVELOPMENTAND PROJECT

MANAGEMENT.STRATEGIC PLANNING.BUDGETS. MARKETING.RESEARCH

STUDY. ENVIRONMENTAL COMPLIANCE CERTIFICATE. PROJECT

INFORMATION AND GOVERNMENT PERMITS. COMMUNITY RELATION.

OPERATIONS AND MAINTENANCE HEAD

CEBU ENERGY DEV. CORP.

TOLEDO CITY, CEBU

Oct, 2007 to June, 2011

OPERATION AND MAINTENANCE OF 3 UNITS 82 MW CFB COAL FIRED POWER

PLANT. SAFETY AND ENVIRONMENT. BUDGETS. QUALITY MANAGEMENT.

PLANT IMPROVEMENTS. PLANT PERFORMANCE. PREVENTIVE AND

CORRECTIVE MAINTENANCE. COMMUNITY RELATION

TRAINING CONSULTANT

CEBU ENERGY DEV. CORP.

TOLEDO CITY, CEBU

April 2007 to Oct 2007

TRAINING AND COMMISSIONING OF CFB COAL FIRED POWER PLANT.

OPERATIONS ENGINEER

SHUQAIQ WATER AND

ELECTRICITY CO.

SHUQAIQ, SAUDI ARABIA

May 2000 to June 20007

OPERATION AND MAINTENANCE OF 3 UNITS 340 MW MITSUBISHI OIL FIRED

POWER PLANT AND 212000 M3 PER DAY RO DESALINATION PLANT.

TRAINING.COMMISSIONING. PLANT PERFORMANCE AND IMPROVEMENTS.

SAFETY AND ENVIRONMENT. QUALITY MANAGEMENT. CORRECTIVE AND

PREVENTIVE MAINTENANCE

SHIFT ENGINEER

SAUDI ELECTRICITY CO.

WESTERN REGION BRANCH

SAUDI ARABIA

August 1989 to April 2000

OPERATION AND MAINTENANCE OF 3 UNITS 127 MW OIL FIRED POWER PLANT

AND 6 UNITS 26 MW GE GAS TURBINE. TRAINING. COMMISSIONING. PLANT

PERFORMANCE AND IMPROVEMENTS. SAFETY AND ENVIRONMENT. QUALITY

MANAGEMENT. CORRECTIVE AND PREVENTIVE MAINTENANCE.

.

PLANNING/SCHEDULING FOREMAN

SANGI POWER STATION

TOLEDO CITY, CEBU

August 1987 to June 1989

PREVENTIVE MAINTENANCE PROGRAM. MATERIAL SPECIFICATIONS. LOGISTICS.

PLANT IMPROVEMENTS. BUDGETS. COST SAVING PROGRAMS. PROGRESS REPORT.

AUDITS. SPECIAL PROJECTS.

OPERATIONS SUPERVISOR

SANGI POWER STATION

TOLEDO CITY, CEBU

April, 1983 to July 1987

OPERATION AND MAINTENANCE OF THE FOLLOWING:

1) 2 UNITS 7.5 MEGAWATTS MITSUBISHI STEAM TURBINE

2) 1 UNIT 15 MEGAWATTS BROWN BOVERI STEAM TURBINE

3) 1 UNIT 26 MEGAWATTSS MITSUBISHI STEAM TURBINE

4) 1 UNIT 40 MEGAWATTS HITACHI STEAM TURBINE

5) 2 UNITS 41 TONS/HR MITSUBISHI COAL Fired Boilers

6) 2 UNITS 68 TONS/HR MITSUBISHI OIL FIRED BOILERS.

7) 1 UNIT 80 TONS/HR MITSUBISHI OIL FIRED BOILER

8) 2 UNITS 160 TONS/HR COAL FIRED FLUIDIZED BED BOILERS

JUNIOR PROJECT ENGINEER

COAL CONVERSION PROJECT

SANGI POWER STATION

TOLEDO CITY, CEBU

February 1982 to March 1983

CONSTRUCTION OF 2 UNITS 160 T/H VKW ATMOSPHERIC FLUIDIZED BED COAL

FIRED BOILERS AND 1 UNIT 40 MW HITACHI STEAM TURBINE.FIELD ENGINEERING.

CODES AND STANDARDS. SAFETY, HEALTH AND ENVIRONMENT. PROGRESS

REPORTS.

EDUCATION

GRADUATED 1981

BACHELOR OF SCIENCE IN MECHANICAL ENGINEERING

UNIVERSITY OF SAN JOSE- RECOLETOS

CEBU CITY, PHILIPPINES

LICENSED MECHANICAL ENGINEERPRC REGISTRATION #: 0069845

TRAINING / SEMINARS:

Human Relations Seminar- ACMDC, TOLEDO CITY, 1984

Water Treatment Seminar- ACMDC, TOLEDO CITY, 1984

Philippine Welding Seminar- ACMDC, TOLEDO CITY, 1984

Basic Computer Programming- ACMDC, TOLEDO City, 1984

Lubrication Seminar- ACMDC, TOLEDO CITY, 1985

Vibration Seminar- ACMDC, TOLEDO CITY, 1985

Equipment Failure/Damage Analysis and Wear Control Seminar- ACMDC TOLEDO

CFB Boiler Power Plant Basic Concepts, Cebu Energy Dev. Corp. Sept.2009 Toledo



Contact this candidate