Post Job Free

Resume

Sign in

Power Plant Engineer

Location:
Mumbai, MH, India
Salary:
INR- 45000/M
Posted:
December 13, 2014

Contact this candidate

Resume:

CURRICULUM VITAE

PERSONNEL INFORMATION

Name : Engr. Shribhagwan Raj

Fathers Name : Shri Algoo Raj

Nationality : Indian

Marital Status : Married

Date of Birth : July 6, 1975

Permanent Address : Shri Algoo Raj

Berukahi

Maharaur (Kasimabad), Distt. Ghazipur

(U.P), Pin - 233 230, India.

Ex. Address : Sadeem / Aziz Co. Ltd

P. O. Box No.35618,Jubail industrial

city-31961.(K.S.A)

Contact No. 919*********, 077********( Mumbai )

Home Mobile +91-967*******, +917*********

:

E-Mail ID : acg05r@r.postjobfree.com

Driving License : Light motor vehicle license issued at India & Jubail

-Saudi Arabia,

Valid till 25/04/2022

OBJECTIVES

Looking for a carrier in the growing Electrical Industry or any dynamic and

reputed organization, which make me

better and enhance my knowledge and skill and can take the best out of me

ACADEMIC QUALIFICATION:

B.E-Electrical (Bachelor in Electrical Engineering)

Registration Number : RGG-96-215

University : Rajeev Gandhi Proudyogiki Vishwavidyalaya, Bhopal

(M. P.)

(University of Technology of Madhya Pradesh)

DEGREE INSTITUTE BOARD/UNIVERSITY YEAR PERCENTAGE

B.E - Electrical Govt. Engg. R.G.P.V Bhopal 2003 - 04 63.41%

Collage. Rewa, (M.P)

(M.P)

Higher Secondary Govt. B.H.S M.P Board, Bhopal 1994 57%

Chandametta

High school Govt. B.H.S M.P Board, Bhopal 1992 64.3%

Chandametta

Computer Literacy : AutoCAD, MS-Office

PROJECT :

Layout plan of 132 K.V / 220 K.V Dimension of Yard and

Clearance justifying.

SEMINAR :

Transformer (Step-up and Step-down)

Induction Motor (Three Phase)

PROFESSIONAL EXPERIENCE:

COMPANY : REGENCY POWER GROUP, REGENCY COMPLEX, PAONTA SAHIB

POSITION : PLANT INCHARGE ''cum'' G.M. PROJECTS

SINCE OCTOBER 2013, I AM ASSOCIATED WITH REGENCY

POWER GROUP, REGENCY COMPLEX, PAONTA SAHIB (H.P.).

(GROUP HAS FOUR PROJECTS NAMELY : SOLANG 1.5 MW SHP,

HANUMANGANGA 5 MW SHP, GANGANI 8 MW SHP & BADYAR

5 MW SHP). SINCE JANUARY 2014 I AM WORKING IN

HANUMANGANGA 5 MW SHP, DISTRICT UTTARKASHI,

UTTARAKHAND.

PERIOD : W.E.F. JANUARY 2014 To till Present

COMPANY : NHPC PARBATI HEP PROJECT 4X130 MW(MEGA PROJECT)

UNDER BHEL (PSNR), CONTRACTOR PURVANCHAL ENGINEERING PROJECTS.

POSITION : SITE INCHARGE

HYDRO ULTRA MEGA POWER PLANT (130 4) MW

PERIOD : JULY 2011 TO Sep. 2013

JOB DESCRIPTION & KEY RESPONSIBILITIES:

Erection of Turbine Accessories.

Assembly of Rotor and Stator of Generator of 130 MW.

H.V. Testing of Rotor and Stator of Generator of 130 MW.

Positioning and Alignment of Rotor and Stator of Generator of 130 MW.

Erection and Commissioning of Bus Duct of 13.8 KV.

Erection and Testing of Control Panel with Cable Termination.

Erection and Commissioning of 53 MVA Transformers.

COMPANY : COASTAL GUJARAT POWER LIMITED ( A TATA POWER COMPANY

)

UNDER BHEL (RUDRAPUR), SUB CONTRACTOR J.D. SECURITIES & ALLIED SERVICES.

POSITION : SITE ENGINEER

THERMAL ULTRA MEGA POWER PLANT (800 5) MW

PERIOD : DECEMBER,2010 TO JUNE 2011

COMPANY : PATEL ENGINEERING COMPANY LTD. (INDIA )

POSITION : SITE ENGINEER

HYDRO POWER PLANT WITH PUMP STATION

PERIOD : MARCH,2009 TO OCTOBER, 2010

COMPANY : SADEEM DEVELOPMENT COMPANY LTD. (K.S.A)

POSITION : FIELD ENGINEER - ELECTRICAL (RC Approved)

ROYAL COMMISSION FOR JUBAIL & YANBU

PERIOD : NOVEMBER 2006 TO AUGUST2007,

COMPANY : SADEEM / AZIZ COMPANY LTD. (K. S. A. )

POSITION : ELECTRICAL ENGINEER - TQAD. (RC Approved )

ROYAL COMMISSION FOR JUBAIL & YANBU

PERIOD : AUGUST,2007 TO NOVEMBER, 2008

RESPONSIBILITY:

Responsible for all site work as I. P. B. D. (Isolated phase bus duct) & S.

P. B. D. (Seggrreted phase bus duct) & Transformer Errection work.

Responsible for day to day planning & monitoring & scheduling projects

Preparation of daily Site progress report & submitted to Clients.

Responsible for Quality performance and indicators should be applied for

implementation of Quality Control Procedure based on construction operations,

ensure high Quality of work.

Inspect and ensure the implementation of project activities in conformance

with contract document.

As built drawing preparation with auto-CAD and submitting to Royal

Commission.

Prepared and reviewed engineering plans, specifications, project schedules,

designs, circuit diagrams, and estimates for construction and maintenance of

power generation projects and related electrical systems..

Make engineering calculations in connection with field and office

assignments.

Responsible for Electrical Design, Load Distribution and Cable lying in

different size as 2X4mm , 3X16mm , 3X25mm , 3X50mm , 3X70mm and 4X185mm

etc.

JOB DESCRIPTION:

Responsible for Electrical Power Distribution System, Street Lighting and

Traffic signals systems.

Responsible for 13.8KV S/S, cable laying, splacing, termination works from

points to RMU and 500KVA Unit Substation cabling and termination works.

Installation of Ring Main Units, Unit Substations, HV and LV Cables, Duct

Banks, Minipillars, Circuit Breakers, Lighting Poles with Luminaries, uPVC

Cables, Armored LV Cables, Street Lighting Panels, MDB Panels, MCCB Panels,

KWH Meter and Typical Pump Station Panel Board.

Responsible for cabling, splicing, termination works for Street Lighting

Poles as 14meters(single & double luminaries), 12meters, 8meters and

decorative cast iron poles errection and Earthing of Street Lighting Poles,

all panel board installation and grounding.

Responsible for Telecommunication Systems, duct bank installation of jointing

chambers.

Lead and conduct optimization, troubleshooting, & feasibility studies related

to electrical discipline either with internal resources or external sourcing.

Installation and connection of all relevant electro-mechanical controls for

the water supply system such as two deep well pump, water treatment plant,

water tower and three sewage pumping stations.

Prepare or provide input to statement of requirement and scope of work for

minor and major projects as agreed by the management.

Participate in safety review/audits, safety case studies, safety

investigations and technical audits.

Estimation of materials for the Project as per requirement.

Coordinate with Consultant/Client for the approval of the completed work.

HT Power Supply:-

13.8KV/220V prefabricated substation of 500 KVA capacities consisting of Ring

Main Units and Transformers.

HT underground cables 3x185mm with 13.8KV power connection to SCECO

extensible oil switches.

LT Power Supply:-

Supply of 220V/127V, 60 Cycles, 3 Phases(R, Y, B).

LV distribution cable S4x70mm from Minipillars to KWH meters.

COMPANY : BRIDGE AND ROOF CO. LTD. (INDIA)

POSITION : FIELD ENGINEER - ELECTRICAL

PERIOD : DECEMBER 2003 TO OCTOBER 2006

JOB DESCRIPTION:

Responsible for Project supervision and implementation of electrical works

including Power distribution system, building wiring and Telecommunications

wiring.

Responsible for installation of different item as RMU's, Unit Sub-station, High

voltage and Low voltage, Minipillars, Circuit breakers, Lighting poles,

Luminaries, Lighting Panels, Earthing and Lighting protection.

Responsible for installation and operation of 11KV Line and 100KVA Transformer on

site.

Testing and Commissioning of panel board & transformer in power house and

auxiliaries.

2500 KVA, 415 fixed Generator set for intake control building with auxiliaries.

Cable lying in trench and inside the power house (wall mounted and suspended to

ceiling).

25KVA, 50KVA, 100KVA, transformer for 11KV line.

Road and bridges lighting system (out door lighting system).

Supervision and checking of all electrical activities in powerhouse during the

Erection period.

Make sure that all electrical works activities should be done as per the

requirements and specification provided by the contractor.

Follow the all safety rules and regulations related to electrical works.

Supervision of manpower and preparation of daily reports.

Coordinate with Client/Consultant inspectors for all inspection activities.

COMPANY : GOVT. OF MADHYA PRADESH ELECTRICITY BOARD

POSITION : ELECTRICAL ENGINEER ( Trainee )

PERIOD : SEPTEMBER 2003 TO NOVEMBER 2003

JOB DESCRIPTION:

Study of Layout Plan of 132 KV and 220 KV Dimension of yard and clearance

justifying.

Earthing and lighting protection system.

Study and design of main equipments for substation, auxiliary equipments & Control

room, Bus bar arrangement.

[pic]

"ENGR. SHRI BHAGWAN RAJ"



Contact this candidate