Post Job Free

Resume

Sign in

Project Customer Service

Location:
Gatesville, TX
Posted:
September 16, 2014

Contact this candidate

Resume:

Ogunniyi Amos

acfzfd@r.postjobfree.com

832-***-****

Planner/ Scheduler

Conroe Tx.

PROJECT PLANNER/SCHEDULER

Summary

Project planner/scheduler with 7years of experience in oil and gas, construction industry,

and manufacture industry/Aerospace. Experienced in Project scheduling, mitigation

planning and control activities of small to medium sized projects throughout their lifecycle.

Involved in project planning, updating, trouble-shooting and, forecasting. Adept at creating

resource-loading, critical path master schedules with Microsoft Project and Primavera P6.

Developing and planning work breakdown structures (WBS). Utilizing Earned Value

management techniques (PV, EV, AC, SPI, and CPI) to gauge progress and identify

performance variances to facilitate focus and intervention on critical project areas.

Effective communicator between developers, end-users, clients, vendors, project team.

Accustomed to handling multiple projects with several job functions. Demonstrated history

of producing accurate and timely reports. Flexible, versatile and thrive in deadline-driven

environments.

Objective

Seeking a results-oriented company to continue growth in Project Control discipline, while

helping to meet their project goals and deadlines using efficient and creative planning and

scheduling methods.

Education

Bachelor of Business Administration

Obafemi Awolowo University Ile-Ife, Nigeria.

The Polytechnic Ibadan, Nigeria.

Certifications

Project Management Professional (PMP) Ongoing

Skills

• Microsoft Project

• Oracle Primavera P6

• Earned Value Management System

• Share Point (PWA)

• Power Point

• Excel

• Microsoft Office, Lotus notes

• Critical Path Method(CPM)

Ability to lead through and work in diverse conditions

Experienced in creating and executing innovative ideas

Extensive experience in public speaking and presentation

Project planner 01/2014 – Present

ZODIAC AEROSPACE, Gainesville, Texas.

Perform advanced planning, scheduling, progress measurement, change

management

Assists project Engineer team in preparation of all Project Controls reports including

but not limited to scheduling updates and analysis, progress reporting, change

management and various reporting for management.

Provides engineering analysis and reporting for special and specific Planning &

Scheduling issues;

Work directly with the Design Engineer, Program Manager, Project Engineer and

Project team members to identify and resolve problems in the area of Planning &

Scheduling.

Review and ensure communication of project related information in a timely

manner;

Provides additional analysis and reporting to Corporate Management.

Maintain intergraded project schedule, with resource loading, critical path analysis

and regular forecast updates

Prepare 1-4 week detailed design look ahead schedules through regular interface

with the Design Engineer team

Identify and monitor trends, including productivity and progress analysis

Assess schedule impact of proposed changes.

Help to monitor and update the percentage complete of the PE Schedule for daily

accountability

Prepare short and long-term resource allocation plans based on input from all key

players and team members.

Ensure to take appropriate planning measures with all clients to reassess, renegotiate

and amend scope of work responsibilities, proposals, contracts and budgets.

Ensure to convey required project data and information to project teams.

Prepare and present regular internal and external project reports for management.

Lead development of baseline schedule and support Project Manager (PM) in

Integrated Baseline Review (IBR).

Project Planner/Scheduler 12/2011 – 11/2013

Hermon worldwide Limited Liability Company, Houston, Texas

Planned, developed and setup the Integrated Schedule in Primavera P6 for

Architectural Design, Procurement and Construction schedule for the company

Project.

Identified project activities

Implements project controls on the project schedule

Determined activity sequence and activity duration

Monitored actual progress, compared to baseline and report progress to forecast

project-end estimates

Analyzed data pertaining to critical order, surrounding quality holds and material

constraints

Mentors employees with less experience in project scheduling and project controls

Coordinates engineering changes and works closely with Sr. Buyer or Materials

Manager to correct quality problems with vendors.

Reviews customer orders, plant capacity and inventory, assist in developing

schedules to meet production requirements dealing directly with vendors, as well as

working with the SAP/MRP system.

Analyze specifications and construction data and perform mathematical calculations

to determine material, tools, and resource requirements for the schedule.

Develops and implements plans that will insure continuous process improvement in

all of purchasing duties and responsibilities

Works closely with suppliers and develops long term relationships

Mitigation planning to ensure projects meet deadlines using ingenious and creative

methods

Serves as the subject matter expert for project schedules and project controls within

the portfolio and interfaces with the client as needed

Followed up on all created purchase orders to ensure timely delivery on all items

purchased.

Provide support and guidance to the production-planning department to support

goals of on-time delivery, customer service, and inventory.

Provides support and guidance to the production-planning department to support

goals of on-time delivery, customer service, and inventory.

Expedites operations that delay schedules and alters schedules to meet unforeseen

conditions

Reviews all portfolio contractual documentation in regards to project planning and

project controls

Project Scheduler 12/2008 – 09/2011

Texaco (Oil &Gas) Plc

Multiple Project Environment in oil and gas industry

Develop and analyze project schedule to align with project scope and deadline

Create WBS and resource allocate / load

Integrating subcontract schedules with project master schedule.

Identify critical Path Activities (CPA) and near critical, and advise project team

accordingly.

Designed schedule for pipeline to minimize all operational costs and reduce errors.

Ensured delivery and supply point for all gas purchases and selling.

Managed all communication for schedule and maintain accuracy of information.

Developed schedules for shipments on everyday basis.

Develop contract language to ensure language is consistent with the goals and

policies of the company.

Reviews all portfolio contractual documentation in regards to project planning and

project controls

Update project schedule weekly with accurate data-entry of data-date reports

throughout project cycle

Creates tender schedules for the portfolio

Determined AC, EV and PV and used earned value analysis/management to

determine deviations by calculating SV, EV, CPI, SPI and rescheduling when needed

Helped team forecast EAC, ETC, VAC, TCPI etc. using visual aids such s-curves

and histograms to simplify it.

Actively participate in Project Planning activities

Incorporates updates in the project schedule based on input from the organization

Furnished progress reports for meetings using Primavera and Office report tools

Presentations with any and all stakeholder when needed, especially team-mates and

lead.

Creates and maintains baseline for project schedules

Support Project Manager(s) in scheduling Project Tasks

Implements project controls on the project schedule

Project Scheduler 11/2007-10/2008

NBC Plc Nigeria.

Prepared initial CPM and WBS with manpower requirements and issue a draft to the

project team for review and compliance in order to ensure scheduling requirements

are being met and that it conforms to good CPM scheduling practice to determine

whether it can be improved to more clearly or more accurately represents the project

scope, and Execution plan

Assisted project manager in controlling and maintaining project scope, schedule and

cost

Liaising with project engineering and purchasing team in prioritizing engineering

packages and material delivery to support construction priorities

Monitoring project expenses against budget, monitoring weekly on-site activities,

monitoring and prioritizing procurement of material

Creating monthly cost reports, developed corporate monthly report

Monitoring extra work activities and managed contract change notices,

Status and update all project activities that are outside the Contractor’s scope

Reviewed and endorsed progress measures reported by the contractor’s and ensured

the Contractor’s schedule and cost forecast assumptions are in alignment

Generated monthly progress status reports, progress curves and reconcile committed

costs to actual costs on a monthly basis.

Developed manpower histograms to evaluate resource demand levels for all current

and proposed projects.



Contact this candidate