Post Job Free

Resume

Sign in

Engineer Maintenance

Location:
Katy, TX
Posted:
September 13, 2014

Contact this candidate

Resume:

BIMAL KUMAR SUTRADHAR, Engineer-In-Training (EIT)

**** *********** **. ***:805, Katy, TX 77449

acfxh9@r.postjobfree.com 347-***-****

[pic]

PROFESSIONAL SUMMARY

Energy Commissioning Group

Austin,

Texas

Energy Efficiency Engineer

May 2014 to

present

. Conducted complex engineering calculations and analysis of design on

lighting retrofits, lighting& cooling saving calculation, power factor

correction and right capacitor selection

. Prepared and presented technical specification to the clients,

assisted with purchase orders and invoice for equipment

. Worked with the "Continuous Commissioning (CC )" team, prepared

comprehensive analysis of existing systems and enhanced the process

controls to optimize overall system

. Performed a comfort baseline through field observation, temperature,

RH and developed detailed implementation plan

. Prepared risk assessment documents for proposals to ensure successful

executions of projects in most cost effective manner

. Prepared progress reports, including implementation of Continuous

Commissioning (CC ) process, measuring the reduction in energy use

and energy saving

Texas A&M University-Kingsville

Kingsville, TX

Graduate Teaching Assistant

January 2013 - December 2013

. Assisted professor with classes and exam schedules,Graded a variety of

assignments and entered grades into online system

. Aggregate testing: moisture content, unit weight and percent voids in

aggregate, specific gravity and absorption for aggregate, gradation

and development of aggregate blend

. Concrete testing: compressive strength test, flexural strength test

(using third-point loading, using center-point loading, splitting

tensile strength test), slump test

. Bitumen testing: performance-based or fundamental tests (consistency

at high temperatures, operating temperatures, and low temperatures),

durability: resistance to ageing

Institute of Water Modelling (IWM)

Dhaka,

Bangladesh

Assistant Engineer

July 2011 -

June 2012

. Responsible for assembling, connecting, and constructing pipe fittings

systems for storm or sanitation sewers, drains, and water mains

. Inspected, examined, and tested installed pipe joint systems and pipe

lines, using pressure gauge, hydrostatic testing and other methods

. Responsible for pump selection, pump maintenance, pump energy

optimization

Rahim Steel Mills Co (Pvt.) LTD.

Narayangonj, Bangladesh

Maintenance Engineer

July 2009 - June

2011

. Performed trouble shooting and maintenance of various types machines

used in steel plant

. Responsible for planning and preparation of daily, weekly, monthly and

yearly preventive maintenance schedule and procurement of spare parts

. Coordinated & organized of man power and motivated them to achieve the

organization goal

EDUCATION

Texas A&M University-Kingsville

December

2013

Master of Science in Engineering

GPA:3.75

Computer skills

Software packages: Auto CAD, Solid Works, ArcGIS 11, HCS+, HEC-HMS

3.5,WaterCAD, MATLAB, ANSYS,

Microsoft Office suites, Windows 98- Windows 7, Windows server,Vmware

workstation and Citrix.

PROJECTS

. Graduate research project: Past and future scenario of space debris

and their mitigation

. Mobile mapping and Geographic Information System data management

. Designed structural wooden Patio using wood structures with LRFD

. Designed a structural system of roof and girders, where girders

subjected to torsional load from generation beams were designed

. Study, repairing and performance test of a refrigerator



Contact this candidate