JAMES QUY HOANG
Home phone: 408-***-****
Cell phone: 408-***-****
acfsfi@r.postjobfree.com
OBJECTIVE
Seeking a challenging technician position in Medical device
manufacturing.
EDUCATION
Completed a course for Electronic Tester at De Anza College.
EXPERIENCE
GOOGLE OPTIC STUDIO Mountain View, CA Assembly Test Technician Oct 2013-
August 2014
. Align Display to Optic and final test.
ALARA, INC., Fremont, CA Sr. Technician, Sep. 2008-May 2013
. Final test electro-mechanical laser based computed radiography (x-ray)
scanners (medical industrial applications).
. Assembling and aligning optical sub-assemblies.
. Integrating optical sub-assemblies, mechanical parts, and electronics
into the system.
. Assist Engineers with prototype products.
. Rework cable harness and solder new parts to a prototype.
. Validate new procedures.
. Train new employees.
. Perform RMA failure analysis, repair and upgrade to current version.
OPTOVUE INC., Fremont, CA Production Lead, June 2006-Sep 2008
. Assembled and aligned optical sub-assemblies for optical medical
devices.
. Integrating optical sub-assemblies and mechanical parts into the
system.
. Final testing and calibrating systems ready for QA and shipping.
. Rejected bad parts to MRB and reworked them in house.
. Updated manufacturing procedure instructions.
. Assisted engineers with prototype products.
. Trained new employees.
ALARA and INSIPHIL (US) LLC August 2005-June 2006 Temporary jobs
TELESENSORY SYSTEM CORPORATION, Newark/Sunnyvale, CA
Supervisor, Test, Inventory, and Logistic July 2001-
Auguest 2005
Technician 4 / Lead April 1992 -July 2001
Assembler July 1984-April 1992
. Daily inventory count for new units and parts
. Daily production scheduling.
. Ensured production line moved smoothly.
. Assigning technicians their daily task
. Trouble shooting rejected units.
. Managing On line Discrepancy Material failure parts and ordering of
new parts for rejected units.
. Reported any problems affecting the scheduled to engineers and
management.
. Verified that calibration of production tooling and test equipments is
current.
. Production final system testing.
. Performed warranty/ non warranty repair and testing of customers
returned products.
. Assisted engineers and others with special projects when needed.
. Analyzed current methods and made improvement recommendations.
. Assembled and tested a variety of electro-mechanical sub-assemblies
and integrated them into complete system.
REFERENCE
Barbara Sorensen (Director of material) Cell - 650-339-
1577 acfsfi@r.postjobfree.com
Dave Butler (President, CFO) Cell -
925-***-**** acfsfi@r.postjobfree.com
Andy Lam (Electronic Technician) Cell - 408-
891-7404 acfsfi@r.postjobfree.com