Post Job Free

Resume

Sign in

Project Manager Engineer

Location:
Victor, NY, 14564
Posted:
August 29, 2014

Contact this candidate

Resume:

Michael J. Roback

PO Box ***

Honeoye, New York *4471

(585) 303- 5671 – Mobile

acfnxb@r.postjobfree.com – E-mail

SUMMARY OF QUALIFICATIONS

25+ years of solid contributions as a hands-on Project Superintendent and Project

Engineer on a broad range of fast-paced, multi-million dollar construction projects for

a general contractor and as a Project Manager for a structural and miscellaneous

steel contractor on a myriad of projects

• Proven ability in scheduling, coordinating and monitoring subcontractors, vendors, architects and

engineers to consistently meet customer quality standards and timelines.

• Demonstrated success in working and negotiating with customers of all sizes from the commercial, retail,

industrial, and government sectors to generate repeat and referral business.

• Additional areas of expertise encompass shop drawing development and review, material and equipment

procurement and expedition, cost code tracking, field supervision of both self-performing and

subcontractor field personnel.

WORK EXPERIENCE

Project Manager, Rochester Rigging and Erectors 2011 - Present

Project Superintendent, Pike Company 2005-2011

Supervised field operations in CM capacity for a General Contractor

Utica City School District Capital Improvement Project - Utica, NY - $14 million

Senior Project Superintendent – Construction management services for two elementary school

renovations and additions

Homeland Security U.S. Land Port of Entry

General Services Administration - Champlain, New York - $82.5 million

Project Superintendent. Construction management services for a

facility wide modernization and expansion of the international crossing from

Champlain, New York to Canada. The existing station is the second busiest

in New York State and fourth largest on the Canadian/US border. Work

included the construction a new two story cargo processing building, nine (9)

commercial inspection booths, Administration building, new Veterinary

Services building, new Export building, new Hazardous Material building, new

Secondary Inspection Garage building and associated canopies, 10 new

passenger inspection lanes consisting of booths and canopies, the demolition

of several existing buildings, civil site work, new truck staging areas, and

NYDOT work including access ramps and roadways from the US/Canadian

Border intersection with I-87.

Supervised field operations of self-performing and subcontractors for a General Contractor. Key projects

include:

• Wal-Mart SuperCenter/Sam’s Club – Tarentum, PA. - $16 million

• Wal-Mart SuperCenter – Bowling Green, OH - $ 12 million

Project Superintendent, LeChase Construction 2003- 2005

Supervised field operations of self-performing and subcontractors for a General Contractor, Key project:

Greater Rochester International Airport Security Checkpoint Project Phases lb & 2 and

Associated Interior Renovations and Upgrades - Rochester, NY - $5+ million

Additional responsibilities included:

• Design development and coordination with architects/engineers/ construction manager

• Development and implementation of site and task specific safety/logistics plans with airport safety and

security personnel in order to maintain passenger and airport personnel safety as well as terminal

operations at all times

• Assisted in the coordination of subcontractors, engineers, and airport personnel for the procurement and

installation of the new Flight Information Data System equipment and software

Project Manager, Rochester Rigging and Erectors 1995 - 2003

Charged with overall management of structural and miscellaneous steel projects of up to $1 million in

western New York, from estimating thru engineering, shop drawing development, procurement, fabrication

to erection.

• Consistently managed several concurrent projects at multiple site locations to maximize efficiencies and

productivity.

• Provided critical on-site direction of multiple subcontracted and self-performing erection crews to ensure

compliance with quality standards and project deadlines.

• Coordinated the development of shop drawings to ensure compliance with job specifications and to

reduce errors and omissions.

• Assisted shop personnel during fabrication to ensure compliance with detail drawings and timely

scheduling to reduce re-fabrication and time delays.

• Developed and assisted in the development and review of numerous successful bids to support the

revenue and growth objectives of the firm.

• Played an integral role in negotiating contracts with general contractors and client management to

increase and diversify business opportunities.

• Key projects included work at manufacturing facilities (several at Kodak), educational institutions,

hospitals, and municipal buildings.

:

Project Superintendent, The Pike Company 1991 - 1995

Supervised field operations of self-performing and subcontractors for a General Contractor. Additionally

coordinated subcontractors and handled project safety responsibilities. Key projects involved new

construction, renovation, additions, and retrofitting for food and energy producers, retailers, and

educational institutions including

• Wal-Mart Club Stores, 246,000 SF Combined Retail Store - Niagara Falls, NY $10 Million. Served

as Project Engineer for each store and Project Superintendent for Sam’s Club. Degree of difficulty was

enhanced due to accelerated schedules, inclement weather, and labor issues.

• Student Activity Center, State University of New York at Buffalo - Amherst, NY $12.5 million.

Project Superintendent and Project Engineer for an addition that required adjoining to an existing,

operating facility and involved increased life safety and critical coordination considerations.

• Indeck/Olean Cogeneration - Olean, NY $3.0 million

GC package on a $90 million CM project. Included concrete, masonry, miscellaneous metal, and

underground piping for steam & gas turbine cogeneration facility

Project Engineer, The Pike Company 1987- 1991 ; John B. Pike &

Son 1984- 1987

Reviewed all documentation during submittal process to ensure compliance with contract documents.

performed additional on-site project responsibilities as required, including quality assurance, scheduling,

and closeout paperwork

. Major projects included:

• Twin One-Mile Bridge Section of 1-595 Port Everglades Expressway Project - Ft. Lauderdale,

FL $20 Million.

Performed in role of assisting Project Superintendent, working with engineers, state inspectors, vendors

in areas of quality control, testing, and scheduling

• Seismic Category 1 Nuclear Safety Related Facility for U.S. Dept. of Energy -

Knolls Atomic Power Lab, West Milton, NY – $10.3 million

Performed shop drawing and product data reviews, document control.

EDUCATION AND TRAINING

Alfred State College, Alfred, New York

AAS in Construction Engineering Technology - 1982

OSHA Subpart “R” Training for Structural Steel Erection

OSHA Hazardous Communication Training

Associate of General Contractors Superintendent Training for Site Accident Prevention and Loss Control

for Scheduling and Planning

OSHA 10hr Safety Training

OSHA 30hr Supervisor Safety Training



Contact this candidate