Malcolm Wood

Job Title: Contractor

Contact Address

** ******** ****

Eastbounrne, East Sussex

BN20 8HS

Tel. No. 013**-******

M. tel. No. 077********

e-mail acfnq8@r.postjobfree.com

MJW CV Oct 2012

Profile

Key Experience

Profession

Malcolm has worked in the water industry since 1971 and in that time has gained a lot of experience in water

engineering. Malcolm has undertaken numerous roles such as designer, budget preparation, project

management, leakage management, DMA design, asset maintenance projects and the management of new

development groups. He has a record of delivering projects on time and within budget.

Preparation of capital and operational budgets

Project Management of capital and operational projects

Supervision of water mains installation

Detailed design of trunk and distribution mains works

Water leakage management & DMA design

Management of New Development group

• Civil Engineer

Nationality

• British

Qualifications

• ONC General Engineering

• EUSR National Water Hygiene Card

• EUSR Utility SHEA (water) Network

• EUSR Utility SHEA (water) Process

MJW CV Oct 2012

Contractor December 2013 - present

• Contractor employed by Mace and seconded into Affinity Water

• Assistant Project Manager responsible for the day to day recording of all site activities

associated with the trunk main replacement schemes in Bagshot and Stanmore, ensuring

compliance with Affinity Water’s water quality standards, Health and Safety and compliance with

Harrow councils highways standards.

• Design of various sizes of pipeline connections, thrust blocks etc.

• Audit of commissioning plans, pipeline designs and connections, method statements and

programmes produced by the contractor.

• Advising the contractor of alternative methods of construction

• Facilitating the timely completion of the 3 trunk main (500mm, 400mm and 250mm diameter

pipelines) rehabilitation schemes.

Cashier October 2013 – December 2013

• Cashier employed by Local Fuels

• Cashier responsible for the payment of forecourt and shop sales and accurate recording of all activity in 8

hour shift, including fuel tank dips, forecourt cleaning, restocking shelves and cleaning shop.

Contractor June 2012 – September 2012

• Contractor employed by Aecom and seconded into Wessex Water

• Design Engineer for the replacement of existing 12” and 9” water mains in Taunton with a new 400mm

diameter water main, this included the negotiation with landowners in order to define an acceptable route,

liaising with all stakeholders to ensure that the design fits the stakeholders requirements, liaising with

other utilities and Somerset highways.

• Undertaking the design of other water mains previously designated as requiring rehabilitation which

includes the specification of technique, enabling works, liaison with all stakeholders, preparing design

presentation and ongoing liaison with the term contractor.

Contractor Jan.2012 – June2012

• Contractor employed by GU Projects and seconded into Bristol Water Plc

• Design Engineer for the replacement of various sized clean water mains for Bristol Water Plc, which

included specification of technique, specifying enabling works and liaising with the term contactor

preparation of health and safety plans, and liaison with all stakeholders

Contractor Oct. 2010 – Apr. 2011

• Contractor employed by AECOM

• Design Engineer for the replacement of various sized clean water mains for Optimise as part of The

Victorian Mains Replacement project for Thames Water.

• Identifying the appropriate diameter of replacement pipe

• Arranging for hydraulic models to be prepared replicating the proposals

MJW CV Oct 2012

• Auditing the results of the modelling exercise to ensure that all hydraulic standards are maintained with

the proposed changes.

• Presenting redesigned DMA’s to Thames Waters project manager through all stages to ensure

acceptance of the full proposal.

Experience with Atkins 2006-Oct.2009 (made redundant October 2009)

• 2007 - 2009

• Senior Engineering Technician.

• Design Engineer for the replacement of various sized clean water mains for Laing O’Rourke as part of

The Victorian Mains Replacement project for Thames Water

• Designer for SKANSKA for the diversion of various sizes of existing distribution and trunk main to

facilitate the construction of the M2 extension and management of the preparation of as laid drawings.

• 2006 -2009

• Utilities Service Contract Clancy Docwra and Southern Water. Project manager for the replacement

of 6000 customer service pipes and meters which was successfully completed within the client’s target

date. Project manager of the Otterbourne leakage investigation which successfully reduced the level of

unaccountable water from 1.9 Ml/d to 0.4 Ml/d. Project manager for the critical asset inspection, repair

and replacement project which was completed within budget and the client’s target date.

• Auditor of mains design schemes ensuring that the design is as per the clients requirements and is ‘fit for

purpose’

• Designer for 2 No. 560mm O.D. trunk mains projects, production of the Bill and representing Southern

Water in liaison with other companies in relation to organising the installation of these new mains.

• Network Development. Supporting Atkins network development team with their dealings with developers

for the provision of new mains for new development.

Experience with FaberMaunsell / Aecom 2004 - 2006

• Senior Engineer

• Thames Water. DG2 co-ordinator responsible for the identification and implementation of various

schemes to increase pressure so enabling properties to be removed from the DG2 Register of Risk

ensuring that the Ofwat imposed DG2 target was achieved. This target was successfully achieved.

• Scottish Water Solutions. Undertake investigation, needs and option development for Scottish Water

wastewater sewer repair together with the suitable remedial action and associated costs. A part of my

responsibility included the preparation of the Health and Safety File and bi-weekly presentations to the

senior engineers within Scottish Water of progress to date and financial approval for the next 2 weeks of

work and liaison with the approved term contractor.

Experience with Ewan Group 2003- 2004

• Engineer

• Thames Water. Zonal Engineer within the South London Leakage Alliance were I controlled a number of

DMA’s on a daily basis identifying detailed investigation and managing the investigation, this involved the

preparation of detailed step testing procedures.

• Various projects. Preparation of Pre-Qualification and Project Proposal documentation, preparation of

solutions to overcome DG2 problems at Rye Water Tower, Project Manager of a distribution zonal study,

preparation of method statements for the installation of domestic and commercial metering in Cork, and

the preparation of method statements for the installation of domestic and commercial metering for MoD.

Experience with FaberMaunsell (Warren Associates) 1999 - 2002

• Planning Engineer

• 1999 - 2000

• Thames Water. Completion of a fittings audit that had been stockpiled to facilitate mains rehabilitation

and preparation of standard design units that would use the stockpiled materials

MJW CV Oct 2012

• Various projects. Design and costing of a new 355 OD PE water main at Godalming and a cyclic

flushing programme.

• 2000 - 2002

• United Utilities. Project management of a £5m asset maintenance programme to achieve DWI

undertaking which was successfully achieved.

• Project Proposals and Pre Qualification Documents. Preparation of project proposals and pre-

qualification documentation for numerous schemes in the North and South West of England,

Experience with South East Water ( Mid Sussex Water Company) 1988 - 1999

• Planning Engineer

• 1999 - 2000

• Management of the new development group ensuring that all applications for a water supply were

attended to and that the costs quoted complied with the water act.

• Management of 4 members of staff which included undertaking yearly appraisals, advertisement for

replacement staff and interviewing prospective incumbents.

• Project manager for all schemes generated within the new development group.

• Preparation of new development group budget which included both operational and capital expenditure.

• Design of both trunk and distribution mains and, booster stations

• Identifying the impact of new development to the existing system and making other managers aware of

the consequences of the additional supply

• Responding to all planning documentation from various individuals and authorities identifying the

requirements in order to be able to offer a water supply

• Identifying those schemes which would form part of the submission for assessing infrastructure charges

• Negotiating access to private land to lay new water mains together with the preparation of the appropriate

legal documentation, easement payment and compensation

• Production of procedures for the new development section which were robust enough to qualify the award

of ISO Quality Assurance Accreditation

Experience with Eastbourne Water Company 1971 - 1987

• Technician Draughtsman

• Preparation of detailed drawings for the installation of new water mains

• Preparation of record drawings for new installations

• Preparation of hydraulic design for trunk main extensions

• Preparation of plans for leakage detection schemes

• Preparation of costs for main extensions

Additional skills

• Microsoft Office package

• Preparation of detailed budgets

• Project management

• Managing salaried staff

• Managing contract staff

• Managing clients expectations

• Preparation of mainlaying contracts