Post Job Free

Resume

Sign in

Engineer Manager

Location:
Dallas, TX
Salary:
$55000/yr
Posted:
August 27, 2014

Contact this candidate

Resume:

Srikar Krishna Rajagopal

*** UTA Blvd, Apt #***, Arlington, TX- 76010 ● 817-***-**** ● acfmlo@r.postjobfree.com

SUMMARY:

* Six Sigma Green belt certified - (IIE-2090-3)

* 1.5 years of experience working on kaizen events.

* Comprehensive understanding in Lean manufacturing, continuous process improvements.

EDUCATION:

University of Texas at Arlington, Texas, USA

Master of Science in Industrial Engineering,

GPA: 3.58 / 4.0 May 2014

Anna University, Chennai, India

Bachelor of Engineering in Mechatronics.

GPA: 3.7 / 10 April 2012

SKILL SET:

Design software: Auto CAD, Solid Works, Ansys.

Simulation & Optimization software: WITNESS, Supply chain guru

WORK EXPERIENCE:

Project Trainee

GENCO-ATC Logistics, Fort Worth, Texas (January 2013-May 2013)

* Identified improvement opportunities in a supply chain of a 3PL warehouse.

* Implemented an Andon based system & a paperless invoicing process enabling expedited delivery of materials.

* Increased the throughput by 62% using WITNESS software based simulations.

Production Engineer- Engineering Internship

EIFCO Machine Tools Pvt. Ltd, Coimbatore, India. (August 2011- April 2012)

* Understanding the business process of auto component manufacturing as per customer requirements.

* Worked on designing & Implementing a safe fixture eliminating a non-value added activity.

* Conducted a post study analysis increasing production by 30%, reducing setup time & operational costs.

* Conducting periodic inspection on finished parts using crack detector, micrometers, moving arm CMM.

LUCAS - TVS, Chennai, India (June 2010-July 2010)

* Analyzing & understanding various assembly line manufacturing techniques such as single-piece flow, JIT, KANBAN etc.

* Mapping process of complex assemblies that involving highly skilled labor & very high dependence with external JIT suppliers for components.

ACADEMIC PROJECTS:

Direct Time Study Project (January 2014-May 2014)

* Determining the performance rating of a task by conducting time study process in a gym.

* Defining the task into work elements.

* Determine the Normal time, Standard time & evaluating worker's performance

Redesigning Facilities layout & Material Handling for ABC Inc. (August2013-December 2013)

* Evaluated various picking processes such as Voice picking, Put to light (PTL) etc to improve the supply chain during average & peak seasons.

* Redesigned the factory layout in a distribution center by Implementing goods to person (GTP) process

thereby reducing labor requirements by 60%.

Conducting Quality Analysis for an Iron Box. (August 2013- December 2013)

* Identifying potential areas for improvement using 5W, 2H.

* Conducted a PDCA cycle to establish an In control process for better efficiency & usage.

* Developed Statistical process control achieving a leap towards to six sigma.

Designing a Production Panel Facility using a Simulation Tool (July 2013 - August 2013)

* Designed a silicon production facility by simulation using WITNESS software

* Constructed a pilot production model & estimating operational requirements to generate 1 MW power every month.

* Reducing potential bottle necks thereby increasing the throughput by 20% in every iteration through optimization.

EXTRACURICULAR ACTIVITIES:

* Logistics Manager for Indian Cultural Council at The University of Texas at Arlington - ( 2012 - 2014)

* Building Crew leader for E.H.Hereford University Center. ( 2012 - 2014)



Contact this candidate