Post Job Free

Resume

Sign in

Engineer Mechanical

Location:
Groves, TX
Posted:
August 26, 2014

Contact this candidate

Resume:

Faiek Hanna B.Sc. Mech. Eng. 714-***-**** acfl6h@r.postjobfree.com

Resume

**** **** ****** ***** *** 7106, Port Arthur TX 77642 (1 /4)

A dynamic active personality with an enthusiastic creative character and a special capability of

leadership and multifunction caliber, supported by honesty and the number one secret of success the

non-fiddling policy, all approved by a mild sense of humor.

Expertise in the Oil and Gas, LNG, Power Station, Navy Ships and Petrochemical Industries

as a QA/QC Engineer, Mechanical Engineer, Maintenance Engineer, Mechanical Engineer,

Rotating or Static Equipment Engineer and Project Engineer.

Work Experience

Bechtel Corporation in Sabine Pass LNG Project Texas U.S.A.

Mechanical Project Engineer Since Dec. 2012 till now

Reviewing the design of all Mechanical Equipment drawing and 3D model for construction

Prepare all the Preservation data for EQMS Program (equipment list, preservation template for each equipment )

Prepare all the data for TEAMWorks Program to claim completion percentage for each equipment

Make data sheet and installation work Package for all mechanical equipment (Compressor &Pumps

&Vessel &skids &Coolers and piping system)

Check the schedule for Mechanical Equipment Constriction

Response for all preservation work for mechanical, electrical equipment and control valves

Install and fin fan cooler, Adjust the pitch angle and radial clearance

Making the level and elevation for Static and rotating equipment check the verticality and the

level for the equipment the release it for grouting.

Contact the vendors and solve all construction problems

Booz Allen Hamilton (BAV & VSE) Group in Egypt

Mechanical Maintenance Engineer Since Dec. 2008 till Nov. 2011

Working on Navy Ships Maintenance

Follow up the Maintenance for (Valves& Pumps& Gas Turbine& Steam Turbine& Compressor& Diesel

Generator& Refrigerator& Heat Exchangers& air Condition and piping connection…).

Perform Technical Writing for maintenance procedure through technical manuals research, ship checks.

Order required materials from USA and local Vendors, Control budget for each job and assist the

technicians’ team in accomplishing the work requested.

Prepare and follow up daily Emergent corrective maintenance.

Plan and monitor long Shutdown Maintenance schedule and execution completion steps.

BP (British Petroleum) Egypt Ras Shukair Saqqara Project

QA/QC Mechanical Engineer Since June 2007 till December 2008

Working with client (PMT) and as mechanical inspection during the construction

Follow up the installation for all mechanical equipments (Compressor &Pumps &Vessel &skids and Cooler

Make inspection for all equipments (Pumps, Compressors, Valves, Vessels, Tanks, Flare,different type of

Skids, Packages, Cranes during construction.

Make the entire mechanical completion certificate.

Make punch list for the equipment during construction.

Check the alignment for all rotating equipment.

Prepare for Start UP. Make preservation maintenance for the equipment.

Solve the engineering problem during construction and contact all the vendors.

Bechtel International

Sonahess Project Algeria

Faiek Hanna B.Sc. Mech. Eng. 714-***-**** acfl6h@r.postjobfree.com

Resume

3035 Lake Arthur Drive apt 7106, Port Arthur TX 77642 (2 /4)

Mechanical Engineer Since June 2006 till June 2007

Installing

the rotator and static equipment {4 Turbo Generator (Nuovo Pignone ) &13 Centrifugal

Compressor& different types of Pumps &Emergency Diesel Generator & Fin Fans Coolers & Vessels &Heat

Exchangers and different types of axillaries Skid &Towers& Over Head Crane and Flare }.

Making level and elevation for Static and rotating equipment. Making grout for all mechanical equipment.

Making rough &pre and final alignment for the rotating equipment.

Follow the maintenance work and preservation for all equipment.

Prepare the rotating equipment for Start UP (oil or grease for the bearing).

Bechtel Overseas Corporation in Egyptian LNG in IDKU

Mechanical Maintenance engineer Since November 2005 till June 2006

Complete all the mechanical completion certificate during start up and commissioning.

Working as mechanical Warranty Engineer solve all mechanical problem in warranty period and

contact the vendors and help the operation and maintenance team of client.

Turn over all the system for the client after the warranty period.

Mechanical equipment construction Engineer Since February 2004 till November 2005

Installing the rotator and static equipment {12 gas turbine (Nuovo Pignone- GE) &6 compressor& BOG

Compressor & 4 Turbo Generator (Alstom &Simens) & big Tanks & different types of Pumps &Emergency

Diesel Generator & Fin Fan Air Coolers & Vessels &Heat Exchangers & Flare &different types of axillaries Skid

&Towers and Over Head Cranes }. Adjust the pitch angle and radial clearance for the fan coolers.

Making the level and elevation for Static and rotating equipment Check the verticality and the level for

the equipment the release it for grouting .

Install the internal parts for the vessel and the column and inspect the trays and its clearance.

Making rough &pre and final alignment for the rotating equipment.

Install the loading arms and its hydraulic circuit.

Making all the inspection &alignment reports and prepare the systems package to transfer it to the client.

Coordination between the sub-contractor and solve any design problems.

Follow the maintenance work and preservation for all equipment.

Prepare the rotating equipment before running (oil or grease for the bearing) and Flushing.

Making the punch item for all equipment.

KBR DAMIETTA LNG Construction in Egypt

Maintenance & pre Commission Engineer Since October 2003 Till February 2004

Making preventive maintenance and preservation for rotating equipment (the emergency diesel & the gas

turbine &generators &centrifugal and reciprocating compressors and different types of the pumps).

Prepare the rotating equipment before Follow up the contractors for the constriction and commission

running (oil or grease for the bearing).

EDF (Electricity De France) Suez Gulf power station BOOT#2 in Egypt

Mechanical Maintenance filed Engineer Since October 2001 till October 2003

Making the preventive and corrective maintenance for all equipment with mechanical team.

Arrange the daily work for the mechanical maintenance group by the work order from operation team

and the preventive maintenance from CMMS.

Make walkdowns for most systems in the Turbine &Boiler and the Auxiliaries and write punch list and

missing items for `these systems, Center Air Condition and pumps.

Prepare preventive maintenance for Boiler& Steam turbine and its auxiliaries systems & and

compressors.

Prepare the maintenance procedure for (the main pumps &compressor & gas turbine, desalination plant

and Center Air Condition

Prepare data for (CMMS) maintenance program and make the reports and close the work order.

Faiek Hanna B.Sc. Mech. Eng. 714-***-**** acfl6h@r.postjobfree.com

Resume

3035 Lake Arthur Drive apt 7106, Port Arthur TX 77642 (3 /4)

Make corrective maintenance for pumps &valves &compressor, firefighting system (deluge valves) and

welding piping defect.

Make the maintenance for the black start gas turbine (TURBOMACH).

Making the predictive maintenance by check the vibration for all rotating equipment and check the

efficiency for most equipment.

Bechtel Overseas Corporation Sidi Krir3&4 Power Station in Egypt

Construction &Mechanical Engineer Since December 2000 till September 2001

Follow up Installing Turbine (ALSTOM).

Install Rotating and Stationary Equipment.

Making alignment for turbine &vertical pumps and horizontal pumps.

Making hydro test for piping and check on welding.

Making flashing for auxiliary system of turbine and generator.

Installing piping for many systems of oil &water& steam. Design and located the supports of pipe.

Egyptian Electricity Authority (EEA) Sidi Krir 1&2 STEAM Power Station

Maintenance Engineer Since November 1999till November 2000

Familiar with”piping & instruments diagram”.

Supervising for the trouble shooting problem.

Maintenance &installations of gear pumps, centrifugal pumps, axial pumps (KSB), all types of valves,

compressors &turbine (SIMENS).

Operating the auxiliaries of power station. Service &maintenance hydraulic &pneumatic circuit.

Prepare preventive maintenance for the turbine& its auxiliaries systems& pumps and compressors.

Make preventive and corrective maintenance for most equipment in power station.

Prepare the required spar part and receive it.

Educational degrees acquired

Bachelor of power Mechanical Engineering, Faculty of Engineering, Alexandria University-Egypt 1999

Training

Operating and Maintenance water and waste water treatment By E.M.I.T( Ercole Marelli Impianti

Tecnolgici.S.p.A)

Safety leadership workshop By Bechtel Safety, Health Services

Maintenance(General information, types, how to do By EDF Company

Operation and maintenance for air compressor By COMPAIR company

Natural Gas Operation &Construction for its station and safety By Gaz de France (GDF)

Maintenance for Auxiliary Boiler By BABCOCK BORSIG POWER INDUSTRIAL BOILER

Maintenance &Operation and Construction for Desalination plant By Weir Entropie S.A. Co.

Installation And Maintenance For The Steam Turbine And Generator And Its Auxiliaries By TOSHIBA

Maintenance For Axial And Centrifugal Multi Stage Pump By KSB Germany company for pumps

Installing and maintenance for GOULDS PUMPS By ITT Industries company

Installation & Operation And Maintenance For Over Head Crane By KONECRANES

Commissioning and Maintenance For Gas turbine By TURBOMCCH industrial energy system

Safety training By Bechtel Overseas Corporation Safety Center in Egyptian LNG in EDKU

Six Sigma Yellow Belt Tools and Practice By International Association for Continuing Education and

Training by Bechtel Overseas Corporation

Language & other Skills

English fluent

Arabic fluent

French conversant

Faiek Hanna B.Sc. Mech. Eng. 714-***-**** acfl6h@r.postjobfree.com

Resume

3035 Lake Arthur Drive apt 7106, Port Arthur TX 77642 (4 /4)

Very much involved in the computers and its development as I’m well familiar with most of applications

such as DTP, Ms Office (WinWord, Excel, PPT, Access).

TWIC Card is available

I hope to submit in your team work



Contact this candidate