EVARISTO ALMINE PRIMA
**** ***. ****** ******, ************ Subdivision San Juan
Cainta, Rizal 1900, Philippines
Mobile Number: 092********/ 091********/ 092********
Email:acfjpe@r.postjobfree.com
POSITION: Rigger
QUALIFICATION SUMMARY:
OPITO Approved (Offshore Petroleum Industry Training Organization) and
experience in rigging, piping, structural erector, fabricator, installation
of oil and gas industry and mining, pressure vessel, tanks, columns, module
frame, gate valves, pre-commissioning, installation of girders, assemble
and dismantling of crawler crane and scaffolding works.
TRAINING & SEMINARS:
Competency Identification
Competent: Rigger 2&3
Daewoo E&C Co. LTD PNG-LNG (EPC3) Project Papua New Guinea
July 07, 2012
BOSIET (Basic Offshore Safety Induction and Emergency Training)
Conducted by: Consolidated Training System Incorporated, Manila Philippines
Certificate No. 976***********, Registration No. 243876/12 Capipisa
July 18-20, 2012
H2S (Hydrogen Sulphide Awareness)
Conducted by: Consolidated Training System Incorporated, Manila Philippines
Certificate No. 12H2S+-0059-010, Registration No. 243876/12
July 18, 2012
IIF (Incident Injury Free)
Daewoo E&C Co. LTD PNG-LNG (EPC3) Project Papua New Guinea
May 28, 2012
Certificate of Competency for RIGGER, TESDA (Technical Education Skills
Development Authority) Taguig, Philippines
Conducted by: NOTIP ( Nautical Options Training Institute of the
Philippines)
Certificate No. 111**********, Issued January 28, 2011
Basic Safety Training and Instruction
Conducted by: Maritime Training Center of the Philippines, Manila,
Philippines
Certificate No. 14-442585B, SN 032061, Issued: August 25, 2010
Basic Safety Training
Conducted by:Maritime Training Center of the Philippines, Manila,
Philippines
Certificate Number: BR08-257-10, Registration No. 213088, August 16 - 25,
2010
Rigger - Trade Test B+Plus
PHILASIA, Sta. Ana Manila, Philippines
September 01, 2010
Craft Safety Training "Rigging & Lifting"
Daewoo E&C Co. LTD LNG Sakhalin 2, Russia
December 14, 2007
Basic First Aid with Adult CPR
Daewoo E&C Co. LTD LNG Sakhalin 2, Russia
April 22-23, 2008
AWARD AND RECOGNITION:
Certificate of Recognition
CHIYODA JGC Joint Venture
PNG-LNG (EPC3) Project, Papua New Guinea
Certificate of Project Completion
DAEWOO E&C CO. LTD
PNG-LNG (EPC3) Project, Papua New Guinea
January 30, 2014
WORKING EXPERIENCE:
Company: DAEWOO E&C CO. LTD.
Position: Rigger
Contractor: CHIYODA-JGC JOINT VENTURE
Project: LNG
Location: EPC3 PNG-LNG Project, Papa Lea lea Road Boroco, NCD, Papua
New Guinea
Date: July 4, 2011- May 26, 2014
Assisted crane operations for loading and unloading of container, erection
of structures, beams, supports,
gate valves, pipe rack installation, erection of pipe spool, assisted
vessel installation, maneuvering of chain blocks, assemble/disassemble of
crawler crane, responsible for signaling to operator, executed toolbox
meeting & safety instruction, toolbox talk, before starting to work is
mandatory of working parties for safety reasons.
Company: KAINAN CORPORATION
Position: Rigger
Contractor: COJAAL- CONTURTIUM JAPANESE ALGERIA
Project: Tunnel and Bridges
Location: Chanter D'el Harrouch, Camp 05/06 Skikda, Algeria
Date: August 12, 2009-July 30, 2010
Attaches load with grappling devices such as loops, wires, ropes and
chains to the crane hook, keeps and maintains tools and equipment in good
operational condition, Assemble and dismantling of crawler crane,
Responsible of loading, unloading and installation of concrete girder both
bridge and tunnels, Fabricate, set up and repair rigging, supporting
structures, hoist and pulling gear using hand and power tools, work under
safety regulations in construction site.
Company: REDIS CONSTRUCTION AFRICA
Position: Rigger/Scaffold
Contractor: TENKE FUNGURUME MINING
Project: Mining
Location: Congo, Africa
Date: September 09, 2008- April 04, 2009
Assemble and dismantling scaffolding structures to provide safe working
flat forms, together with steel pipes, support, beam, braces and clamps to
support scaffoldings, work at indoor and outdoor in extreme heat and cold
at
various heights, Erection spool pipes, valves, tanks, pipe rack
installation, manual rigging, erection of beams and supports and
maneuvering of chain blocks.
Company: DAEWOO E&C Co. LTD.
Position: Rigger
Contractor: CHIYODA-TOYO SAKHALIN DEVELPOMENT CORPORATION
Project: LNG
Location: Korsakov Sakhalin, Russia
Date: December 25, 2006 - June 25, 2008
Responsible for assembling and installing rigging gear such as cables,
ropes, pulleys and winches to lift, position machinery, structural steel
and other heavy objects: Examine objects to be moved, estimate their size,
shape and weight and decide on the type of equipment necessary; Assemble
and dismantle crawler cranes 200 tons; erect pressure vessel, piping tanks,
columns, mouth motor frame, tanks, pipes, gate valves, heat exchanger
evaporator, installation of trays and bundle of tube cooler. Rectification
work cutting, fitting, lay outing, and bolt tightening, Maneuvering of
chain blocks, familiar with all hazards and safety precautions.
Company: BF METAL CORPORATION
Position: Rigger
Project: Building and Structural
Location: Cainta Rizal, Philippines
Date: January 26, 2002 - December 6, 2005
Responsible for loading and unloading of construction materials such like,
bundles of steel bar, bundle of angular bar, channel bar, bundle of mess
wire, bundle of fly wood and timber, pipes, spool, structural, generator,
welding machine and responsible signaling to crane operator.
EDUCATIONAL BACKGROUND:
Tertiary: Asian College of Science & Technology (ACSAT)/GRCO COURSE
Cubao, Quezon City, Philippines
Graduated: March 28, 1996
PERSONAL DATA:
Date of Birth: October 26, 1973
Passport No.: EB6305686
Place of Birth: Silago, So.Leyte Philippines Valid
Until: September 9. 2017 PNG
Age: 40 yrs old
Seaman Book No.: BO913828
Height: 5' 5"
Valid Until: August 26, 2015
Weight: 65 kgs.
SRC: NCR0103011
Civil Status : Married
Nationality: Filipino
REFERENCES:
Individual below will provide and immediate reference:
Mr. Hyo Wook Lee
Mr. Ernesto
Larosa
Purchasing Manager
Material
Supervisor
Daewoo E&C Co. LTD PNG-LNG (EPC3) Project Papua New Guinea
I hereby certify that the above information are true and correct to the
best of my knowledge and belief.
EVARISTO A. PRIMA
Applicant Signature
[pic]