Post Job Free

Resume

Sign in

Manager Project

Location:
Fort Lauderdale, FL
Salary:
25
Posted:
August 12, 2014

Contact this candidate

Resume:

Guido Ernesto Solano

***** * *********, *******, ** 33326

Mobil Phone: 954-***-****

E-mail: acfb8d@r.postjobfree.com Or acfb8d@r.postjobfree.com

Experience:

Company: S+S Engineering Service

San Salvador, El Salvador

November 1997 - June 2005

Site Manager

1.

I was in charge of all the Forman, labor and contractors to execute and finish the project on schedule, I

was also in charge of the cost and budget control of the project, some construction projects include:

Construction of the Market Las Margaritas in El Salvador on the year 1999.

Electrification and lighting of the 9a. Calle pte., y carretera panamericana, in El Salvador. In

the year 1999.

Construction of rods with concrete 0.5 km. in El Salvador year 1999.

Construction of warehouse and machines installation for an industrial factory named

Quimicas laser de El Salvador in El Salvador, years 1997-1998.

Remodeling of central Offices of Quimi cas Laseser Industry in El Salvador in the year 1998

Asphalt rods in the industrial complex of Quimicas Lasser industrial company El Salvador for

1997 to 1999.

Installation of water system in industrial complex of Quimica lasser El Salvador in 1998.

Earth work and Hydraulic Concrete installation in warehouse #1 in the complex of Quimicas

Lasser Industry in El Salvador from1998 to 1999.

2. Chief of Engineering

I was in charge of the seeking of technicians and contracts with other companies as well the quali ty of

the construction and the materials used (testing, buying, and heavy machine work). In this position y

worked in the following projects:

Emergency program to rehabilitate the roads in El Salvador, in the year 2000.

Construction of jails in centro judicial Dr. Salverio Navarrete, San Vicente, El Salvador, year

2000.

Dissemble of a communication tower from San Salvador Volcano and installing at

cojutepeque, also the construction of the perimeter wall and command center. Year 2000.

Improvement of the Security system at the prison of La Union El Salvador. In the year 2001.

Removal of the landslide over the roads product of the earthquake of January 13 of 2001 in

El Salvador. Year of work 2001.

3. Project Manager

I was in charge of all the technical de partment, construction, design, calculate department, supple

department, quality controller department, etc., in fact I was second in charge after the owner. I work in

this positions at this following construction projects:

Repairing a construction of warehouse of CEL (Comision Hidroelectrica del Rio Lempa) in El

Salvador. In the year 2001 to 2002.

Construction of an Olympic stadium bleachers and pile for the footing foundation in Santa

Ana El Salvador, in the year 2002.

Repair and reinforcement of the well infant center EL Chaparral in San Salvador in the year

2002.

Repair and reinforcement with steel beam and columns of the orphan building San Vicente de

Paul in El Salvador in the years 2002 to 2003.

Construction of The City Hall of San Carlos in Morazan El Salvador 2004 to 2005

Company: TOA Corporation from Japan

San Salvador, El Salvador

March 2006 - August 2006

Security inspector and construction supervisor:

1.

Engineer in charge of security at the construction site and supervisor of construction process of caissons

for the dock of passengers, multipurpose and container area of Cutuco port in La Union, El Salvador,

obligations were the construction of deck and installation at sea.

Company: INGETEC S.A. de C.V.

San Salvador, El Salvador

April 2007 – August 2007

Design coordinator:

1.

Engineer in charge of the coordination of the Structural Design Team, obligation include the review of the

calculations and analysis for the Project: “Reparación y readecuación para los laboratori os de sanidad

vegetal y animal de la DGSVA del Ministerio de Agricultura y Ganadería”.

Company: ALCONSA S.A. de C.V.

San Salvador, El Salvador

August 2007 – March 2008

Site Manager:

1.

Control of the construction process also calculus of the material san reviewer or the cost of the project,

some of the projects under my management were:

Construction of: Polideportivo de Ciudad Arce, El Salvador, in the year 2007.

Construction with hydraulic concrete of 7 km street at “EL Bajío en Cantón el Zapotal,

Chalatenango”, Project of FISDL. In the year 2008.

Company: Corporación Integral

San Salvador, El Salvador

March 2008 – October 2008

Quality control and security Manager:

1.

Quality controller of the materials and the construction procedure also in charge of the review of the

safety measures on the construction site. I was also in charge of the analysis of the cost an estimating

process as well as the design department, for the project: JLS-2008 “Reparación y Reconstrucción de

Centros Escolares en Cantón El Guamo, Cantón Tierra Colorada y Casero Primavera”.

Company: Consortium MALSA-ITYAC

San Salvador, El Salvador

December 2008 – March 2009

Field inspector chief:

1.

Inspector of the actual structural conditions of the bridges in El Salvador, as well as the damages and

deteriorations of the bridges, also in charge of the input of the data to the new government software for

the MOP (Ministerio de Obras Publicas).

Company: Arq. Jorge Moreno Aguilar

San Salvador, El Salvador

November 2009- December 2009

1. Field supervisor:

Supervisor of the construction of the 11 houses of the national sand beach soccer team of El Salvador,

obligations consist in the verification of the quality of the construction, the control of the due day for

each house, the coordination of sea transportation to the different islands were houses have to be build.

Company: TELUS INTERNATIONAL/Transactel El Salvador.

La Libertad, El Salvador

February 2010 – December 2013

1. Project Manager

Project management of infrastructure, which was constructed and adapted to the new facilities at

Plaza Merliot Transactel, ex-plaza theater, I was in charge of budget control and direction of the

activities of construction, civil works, air conditioning, electrical and data; will oversee quali ty control

and execution times.

2. Administrative Manager

Manage the activities within the Call Center in terms of purchasing, assets control, maintenance,

general services, security and the various negotiations with the lessor of the building, coordination o f

internal efforts and maximize the efficient use of space and changes given to staff growth.

Other jobs experience in El Salvador

Year 2003 – Year 2009

Reconstruction and reparations at Albanes Candy Store at Santa Tecla, La Libertad . In the

year 2003.

Topographical survey, for Engineer José Luís Montalvo from Distribuidora Agrícola Montalvo,

Soyapango. In the year 2004

Reconstruction of Lic. Manuel López s House, in Santa Tecla. In the year 2005.

Design and construction of Lic. Oscar Mejia s House, in the year 2006.

Topographical surveys of land sections at Cantón El Gramal, at La Palm for the Ing. David

Oswaldo Salgado, December 2007.

Expert advices for reparations and reconstruction in plant of liquefied petroleum gas of Z Gas

El Salvador, September 2007 to November 2007.

Dental care Clinic restoration in Centro Pediátrico For Dr. Rodrigo Gamero, El Salvador, San

Salvador, August 2009.

Other jobs experience in the United States

Year 2004 – Year 2006

Person in charge of sales and design, costs and budgets at Glass Block Design in San

Francisco, USA, CA, in the year 2004

Estimator for FencePro's, obligations include budgets, supervision, and seals. In Brisbane,

USA, CA, in the year 2005

Education:

High school diploma at Colegio Champagnat, Santa Tecla, El Salvador

Civil Engineering, Albert Einstein University. San Salvador El Salvador

Other knowledge:

Excellent knowledge of English and Spanish.

Knowledge of Microsoft Office software (Word, Excel, Power Point)

Basic knowledge of MS Project.

Knowledge of construction techniques.

Knowledge of survey and the use of all survey equipment.

Knowledge of AutoCAD Drawing.

Additional Education:

Course in “Construction, Design and Conservation of Asphalt pavement of roads”, given by

“La Asociación Mexicana de Asfaltos, A.C.”

Course in “Evaluation and Rehabilitation of Earthquake damage Techniques for Structural

Elements”, given by “Asociación Salvadoreña de Ingenieros y Arquitectos (ASIA)”

Course in “Supervision Techniques, Budget Control and Acti vity Programming in Construction

Projects”, given by “El Instituto Tecnológico Centro Americano (ITCA, FEPADE)

Course in “Basic AutoCAD 2002 drawing”, given by “El Instituto Tecnológico Centroamericano

(ITCA, FEPADE)

Course in “Basic Concrete Technology and Concrete Design by the ACI 211.1 method”, given

by “Instituto Salvadoreño del Cemento y del Concreto (ISCYC)”.

Course in “Quality Controller and Industrial Security for Construction”, given and certified by

“Asociación Salvadoreña de Ingenieros y Arquitectos (ASIA)” .

Personal Skills:

Excellent budget creator and controller.

Excellent quality and cost controller.

I can handle large amount of personal under my supervision.

Excellent programming and schedule maker.

Perfect Analyzer of budgets.

Excellent manager for administration workers.

Can design concrete structures and sewer and draining systems as well as drinking water

systems.

Reference:

Tim Garcia, General Manager at FENCPRO CA. 415-***-****, 650-***-****

Evy Doerfler, Assistant Manager at FENCPRO CA.916-***-****

Cesar Armando Solano, DA Instructor 954-***-****

Lorenzo M. Guzmán, Senior Director Vector Global WMG 305-***-****



Contact this candidate