D. Mark Pennington
***** ******* ******* **. **: 310-***-****
Rancho Palos Verdes, CA 90275 E-mail: acf9rs@r.postjobfree.com
Experience
Superintendent
*/****-**/**** ******** Construction Management and Engineering.
. Managed the construction of a large restaurant in Pasadena, CA.
Superintendent Medical OSHPD
1/2010-11/2010 E.H. Butland Corp.
. Managed the construction for the Cytology and IOC Labs at Cedars-Sinai
Medical Center.
Field Project Manager/Superintendent Medical OSHPD
3/2007- 1/2010 Pyke / Global Construction, Inc. Long Beach, CA.
. Manages medical, commercial and industrial construction projects.
. Develops and updates detailed and accurate schedules using MS
Projects.
. Maintains a three-week look forward program, concise daily logs,
RFI's, and change orders.
. Interfaces closely with clients and inspectors, gaining their respect
and confidence.
. Coordinates the efforts of subcontractors and their associated
equipment layout.
. Reviews all electrical and HVAC calculations, including electrical
load calculations, HVAC tonnage, and air flow balance.
. Has an excellent understanding of hospital Class IV infectious control
and OSHPD requirements.
Medical Projects Completed
. California Glendora, CA. GE CT/Pet & X-Ray. Diagnostics Imaging
. Glendale Memorial Hospital. Glendale, CA. Toshiba 1.5 Tesla MRI &
64 Slice CT.
. LA County / USC Medical. Los Angeles, CA. Seismic retrofit for Gamma
Knifes.
. Loma Linda University Medical Center. Two Siemens 3.0 Tesla MRI & GE
64 slice CT.
. Centinela Hospital and Medical Center. Inglewood, CA. Cath. Lab #3.
. Glendale Memorial Hospital. Glendale, CA. Colorectal Center
Owner
5/1986- 3/2007 Pennington Electric Co. Torrance, CA
. Directed all aspects of electrical engineering, design and
construction for medical, commercial and industrial project.
. Have excellent skills at design build, load calculations, motor
controls, over current protection, fault current and lighting design
per Title 24 requirements.
. Interfaces closely with the client to determine an accurate project
scope.
. Deals directly with local government agencies in order to maintain
project momentum.
. Maintains a safe and healthy work environment.
Manager of Process Control and Electrical Engineering
4/1979 -_5/1986 Champlin Petroleum Co. ( Now Valero ) Wilmington, CA
. Manages the Process Control and Electrical Engineering and Computer
Group.
. Manages department's capital investment estimates, expenditures and
budgetary controls.
. Provides liaison services between the Technical Services Department
and Refinery Operations.
. Responsible for the design and implementation of instrumentation,
electrical, SCADA, analyzers, and microprocessor based controls
systems (Honeywell TDC).
Control Systems and Electrical Technologist
Major Construction Projects Company Representative
2/1972-4/1979 Chevron USA ElSegundo, CA
Control Systems Technologist
. Performs all phases of Control Systems, Instrumentation and Electrical
Engineering associated with the operation of a 450,000 bpd oil
refinery.
. Develops and administers contracts for medium sized Instrumentation
and Electrical projects.
. Works closely with Process Engineers in P&ID development and control
system and instrumentation selection and application.
. Assists maintenance with trouble shooting complex systems.
. Performs instrumentation, orifice plate and control valve sizing.
Major Construction Projects Company Representative
. Provides oversight for instrumentation and electrical contractors.
. Ensures all installations are per plans, specification and codes.
. Administers all RFIs and change orders.
. Considers and provides approval for all value engineering.
. Witnesses and approves all instrument loop accuracy and instrument
calibration.
. Supervises refinery instrumentation technicians and electricians
during initial plant start-up.
Projects Completed as Company Representative
. LSFO Low Sulfur Fuel Oil Unit, 150,000 bpd through put.
. Marine Terminal. Included two off shore berths. Handles 90% of
refineries crude through put.
. Waste Water Treatment Plant for refinery's effluent.
. Sulfuric Plant.
. Catalytic Reformer Plant. Converted from pneumatic to electronic to
share LSFO Unit's control room.
Education
. 8/1985 Bachelor of Science - Business Management Pepperdine
University Malibu, CA
. 8/1977 Associates Degree - Electronics El Camino College
Torrance, CA
. Instrumentation & Electrical Apprentice Program- Chevron USA.
. C10 California Electrical Contractor License- Inactive.
Military Service
. U.S. Marine Corps - Honorable Discharge
Additional information and references provided upon request.