Post Job Free

Resume

Sign in

Electrical Project Manager

Location:
Rancho Palos Verdes, CA
Posted:
October 05, 2014

Contact this candidate

Resume:

D. Mark Pennington

***** ******* ******* **. **: 310-***-****

Rancho Palos Verdes, CA 90275 E-mail: acf9rs@r.postjobfree.com

Experience

Superintendent

*/****-**/**** ******** Construction Management and Engineering.

. Managed the construction of a large restaurant in Pasadena, CA.

Superintendent Medical OSHPD

1/2010-11/2010 E.H. Butland Corp.

. Managed the construction for the Cytology and IOC Labs at Cedars-Sinai

Medical Center.

Field Project Manager/Superintendent Medical OSHPD

3/2007- 1/2010 Pyke / Global Construction, Inc. Long Beach, CA.

. Manages medical, commercial and industrial construction projects.

. Develops and updates detailed and accurate schedules using MS

Projects.

. Maintains a three-week look forward program, concise daily logs,

RFI's, and change orders.

. Interfaces closely with clients and inspectors, gaining their respect

and confidence.

. Coordinates the efforts of subcontractors and their associated

equipment layout.

. Reviews all electrical and HVAC calculations, including electrical

load calculations, HVAC tonnage, and air flow balance.

. Has an excellent understanding of hospital Class IV infectious control

and OSHPD requirements.

Medical Projects Completed

. California Glendora, CA. GE CT/Pet & X-Ray. Diagnostics Imaging

. Glendale Memorial Hospital. Glendale, CA. Toshiba 1.5 Tesla MRI &

64 Slice CT.

. LA County / USC Medical. Los Angeles, CA. Seismic retrofit for Gamma

Knifes.

. Loma Linda University Medical Center. Two Siemens 3.0 Tesla MRI & GE

64 slice CT.

. Centinela Hospital and Medical Center. Inglewood, CA. Cath. Lab #3.

. Glendale Memorial Hospital. Glendale, CA. Colorectal Center

Owner

5/1986- 3/2007 Pennington Electric Co. Torrance, CA

. Directed all aspects of electrical engineering, design and

construction for medical, commercial and industrial project.

. Have excellent skills at design build, load calculations, motor

controls, over current protection, fault current and lighting design

per Title 24 requirements.

. Interfaces closely with the client to determine an accurate project

scope.

. Deals directly with local government agencies in order to maintain

project momentum.

. Maintains a safe and healthy work environment.

Manager of Process Control and Electrical Engineering

4/1979 -_5/1986 Champlin Petroleum Co. ( Now Valero ) Wilmington, CA

. Manages the Process Control and Electrical Engineering and Computer

Group.

. Manages department's capital investment estimates, expenditures and

budgetary controls.

. Provides liaison services between the Technical Services Department

and Refinery Operations.

. Responsible for the design and implementation of instrumentation,

electrical, SCADA, analyzers, and microprocessor based controls

systems (Honeywell TDC).

Control Systems and Electrical Technologist

Major Construction Projects Company Representative

2/1972-4/1979 Chevron USA ElSegundo, CA

Control Systems Technologist

. Performs all phases of Control Systems, Instrumentation and Electrical

Engineering associated with the operation of a 450,000 bpd oil

refinery.

. Develops and administers contracts for medium sized Instrumentation

and Electrical projects.

. Works closely with Process Engineers in P&ID development and control

system and instrumentation selection and application.

. Assists maintenance with trouble shooting complex systems.

. Performs instrumentation, orifice plate and control valve sizing.

Major Construction Projects Company Representative

. Provides oversight for instrumentation and electrical contractors.

. Ensures all installations are per plans, specification and codes.

. Administers all RFIs and change orders.

. Considers and provides approval for all value engineering.

. Witnesses and approves all instrument loop accuracy and instrument

calibration.

. Supervises refinery instrumentation technicians and electricians

during initial plant start-up.

Projects Completed as Company Representative

. LSFO Low Sulfur Fuel Oil Unit, 150,000 bpd through put.

. Marine Terminal. Included two off shore berths. Handles 90% of

refineries crude through put.

. Waste Water Treatment Plant for refinery's effluent.

. Sulfuric Plant.

. Catalytic Reformer Plant. Converted from pneumatic to electronic to

share LSFO Unit's control room.

Education

. 8/1985 Bachelor of Science - Business Management Pepperdine

University Malibu, CA

. 8/1977 Associates Degree - Electronics El Camino College

Torrance, CA

. Instrumentation & Electrical Apprentice Program- Chevron USA.

. C10 California Electrical Contractor License- Inactive.

Military Service

. U.S. Marine Corps - Honorable Discharge

Additional information and references provided upon request.



Contact this candidate