Post Job Free

Resume

Sign in

Medical Device Billing

Location:
Marlborough, MA
Salary:
14.00
Posted:
September 30, 2014

Contact this candidate

Resume:

HAYDEE CARABALLO lo* Brismead Street 978-***-****

Marlboro, MA 01752 acf7hb@r.postjobfree.com

OBJECTIVE

To obtain a position as an assembler in a manufacturing company where I can use my experience and

training to benefit my employer.

INTERNSHIP

Saint Francis Rehab and Nursing Worcester, MA 3/13 - 6/13

Medical Billing and Coding

Responsible for PT Eligibility, PT Demographics.

Medical Billing and Coding, Claim Entry setting.

Claims for insurance, Filing medical records.

Entering billing information into Billing software, Post payments eligibility.

EXPERIENCE

IQUUM Marlborough. MA 12/13 – 3/14

Assembler

Responsible for the proper assembly and quality verifications of medical device parts

Testing medical components to verify passing or failing

Complete inspections on the medical device component to verify any defective parts

GE Health Care Westborough. MA 12/12 – 7/13

Assembler

Responsible for the proper assembly and quality verifications of medical device parts

Install medical device component

Testing medical components to verify passing or failing

Complete inspections on the medical device component to verify any defective parts

Veleritas Shrewsbury. MA 1/12 – 12/12

Assembler

Responsible for the proper assembly and quality verifications of medical device parts

Install medical device components into a V10 pump cartridge

Pack V10 pumps

Complete inspections on the Vios to verify any defective parts

Karl Storz Endovision Charlton, MA 11/10 – 12/11

Electrical Mechanical Assembler

Assembled medical device components and inspect bottom chassis for proper assembly

Installed Rear Panel, Board, Bracket Fan, Barnier Nomex Top, Cable, Harness, Filter Line, Foot Rail

Molded, Cathode Bottoms, Heat sink Top and Bottoms, Chassis, Belt Timing, Pulley Shaft, PCB

Lamp timer, Gasket Lens, Plate support, Light Shield, Bracket Mounting, Sleeve, Ring threaded,

Screen Attenuator, Switch Power, Adapters Lug ground, Holder Fuse, Lamp Knob Control, Connector

Filter, Faceplate, Condenser Lens, Spindle, Lens Ring, Hot Mirror, Holder Filter using Lock Tight,

Sealant and Compound, Lamp Timer Test Done.

Completed electrical wiring from blue prints using various hand tools and soldering

EDUCATION

Saint Francis Rehab and Nursing Worcester, MA 2013

Internship

Salter College West Boylston 2013

Medical Billing and Coding Certificate,

SCS Business and Technical Institute New York, NY 1986

Computer Entry Operator

SKILLS

Fluent in Spanish



Contact this candidate