Paul F. Whiting
**** ********** ************, ** *****
acf5ax@r.postjobfree.com
Document and Configuration Control Specialist with over 20 years
professional experience successfully tracking, archiving, scanning and
maintaining business records in engineering and quality environments.
Recognized as a proactive manager of effective change. Accurate, detail
oriented, self-starter with excellent computer skills. Experience using
MRP/ERP systems relating to bill of material (BOM), Engineering change
notices and item master creation and revisions.
PROFESSIONAL EXPERIENCE
Document Control Analyst, Duke Energy (Contract through Randstad ) 02/2014
- 07/2014
. Managed the As-Built Construction drawings and coordinated their
routing throughout the company
. Responsible for issuing released drawings and documentations out to the
field
. Developed spreadsheet to track project information through its
lifecycle
. Available to carry on any duties as assigned
Records Manager, Generation mPower (05/2011 - 01/2014)
Created and maintained a filing system for a start-up Nuclear Energy
company that was designing and licensing a Small Modular Reactor (SMR)
. Developed and managed a hard copy and electronic records system to
easily retrieve company
documentation
. Created Records Management and Document Control procedures for the
Quality Assurance department
. Notified key employees weekly, via distribution lists, of
correspondence, training updates and document status
. Created and updated several registers and logs using Microsoft Excel.
. Key contact for Microsoft Sharepoint data retrieval and permissions
Configuration Analyst, Force Protection (04/2010 - 12/2010)
Team Lead for Engineering Change Notice (ECN) cataloging group. Responsible
for managing the transfer of engineering change data into an editable
spreadsheet format to enable configuration identification with cross
platform applicability and serial number effectivity.
. Developed catalog spreadsheet templates used by the team to capture
critical data from engineering change
documentation (ECPs, ECNs, ECRs, RFDs, EWOs) to support development and
implementation of FPI's
logistics analysis software
. Established guidelines and formats to catalog over 15,000 lines of
engineering changes.
. Effectively interacted with co-workers to manage and delegate work
activities and maintain team cohesion in
order to complete the catalog ahead of schedule and with reduced
resources.
. Collaborated with government customers, foreign nationals, and other
departments to identify requirements
and establish functionality to meet customer requirements.
. Recommended risk mitigations to cost, schedule and performance
limitations and also identified process
improvements to streamline catalog development.
. Developed processes, procedures, and criteria to validate and verify
each cataloged item.
. Delivered weekly status reports.
Document Manager, CB Richard Ellis/Lincoln Harris (04/2008 - 08/2009)
Responsible for the scanning, cataloging and archiving of project close-out
documents to facilitate easier electronic retrieval company wide.
. Successfully archived architectural drawings, close-out documents and
electronic files into the Document
Management (ProjectTalk) software consistently complying with
company directives.
. Established detailed item entry formats for individual files and
complete drawing packages which simplified
document retrieval for company personnel and associates.
Document Control Coordinator,AMT Datasouth (05/2007 - 03/2008)
Key accountability for managing, tracking, creating and revision
controlling all company documentation to a high standard ensuring error
free records.
. Accurately utilized an MRP system to create and modify bills of
materials for easier manufacturing and order
processing.
. Ably drafted and revised engineering documentation consistently in line
with company orders and change
bulletins to insure a guaranteed quality product.
. Carefully wrote and implemented all Engineering change notices and
waivers then subsequently
communicated these to manufacturing, engineering and
sales ensuring correct parts procurement and parts
assembly.
. Scanned drawings and converted to appropriate electronic formats for
easier and timely companywide
retrieval of information.
. Created accurate drawings and documents using AutoCAD and MS Word for
effectual new part and
assembly obtainment.
Drafter,Flightline Systems (02/2002 - 04/2007)
Responsible for modifying and creating first class parts drawings and
assemblies using AutoCAD and MS Office for new parts design and design
modifications requested through a variety of manufacturing departments
(Engineering, Purchasing, etc)
. Drafting/Design work involving final design, part creation, drawing
revisions, bills of material and acquiring
necessary approvals.
. Participated in configuration audits.
. Competently worked with other departments (i.e. Manufacturing,
Engineering, and Purchasing) for problem
resolution which involved identifying root causes of issues and
their impacts on other departments or
platforms.
. Professionally wrote and processed engineering change orders and
communicated these with departments to
insure accurate builds and piece part purchases which reduced costs and
improved quality.
. Meticulously changed drawings, specifications and manuals conveyed
through the document change notice
system in a timely manner which aided in an error free procurement and
assembly process.
. Contributed to the conversion of hard copy documents into electronic
format and then transferred and
categorized them into network database for quicker visibility
throughout the company. This greatly increased
the speed of the assembly and purchasing process.
Document Specialist, Flightline Systems (02/2000 - 02/2002)
. Facilitated configuration control board meetings and followed up with
affected departments and all levels of
the organization to communicate changes and resolve issues.
. Managed all engineering and quality documents using an MRP system for
accurate record keeping.
. Factually inputted and maintained vital engineering records (drawings,
item masters, bills of material) and
changes using an MRP system for proper parts purchase and assembly,
saving money and assuring quality
assembly output.
. Created quarterly reports and data packages to the customer for baseline
revision changes.
. Provided consistent and high quality program and project support to
company personnel insuring business
objectives were always met and often exceeded.
1998 A.A.S., Mechanical Technology
Monroe Community College, Rochester, New York