Name: Joe Valdez
Job Title: Construction Manager
Current Location: Edmonton, AB
acf31a@r.postjobfree.com
Joe Valdez, Marine Engineer, BBA, CET
Nearly 40 years of experience:
. Construction Manager & Superintendent
11 Yrs
. Quality Management
10 Yrs
. Millwright /Welder Fitter Business Owner
4 Yrs
. Millwright/Machine Fitter/Power Engineer Qualified Trades
8Yrs
. Marine Engineering Officer Oil Tankers and Barge Tugboats
5Yrs
OIL AND GAS CONSTRUCTION INDUSTRY MANAGEMENT CAREER PROFILE
. Alberta and international oil and gas construction management
professional experience for more than 16 yrs working as owner's
representative and for multinational EPCM contractors.
. Enjoy fixing and re aligning project that have gone sideways
. Loves working under extreme pressure and deadlines.
. Taught over 80 CWB level 1 & 2 Inspectors at British Columbia
Institute of Technology and Syncrude UE-1 project. 76 students passed
CWB Exam.
. Extremely resourceful at revising plan, and re allocating resources
in response to constant changing construction execution environment
. Enjoy Workface Planning, executing project safely, and managing
projects according to living critical plan, and on budget.
. Experience working with union and non union labor
EXPERIENCE
Construction Management Skills Acquired Over A 25 Year Period in the Oil
and Gas Industry including 16 YRS as a Construction Management Consultant
Working With Oil and Gas Producers and a Major EPCM Corporation
. Construction Procedure reviews
. Preparing bids and Estimates
. Assisting in preparing 2 week look-ahead projections taking into
account potential threats to the project.
. Providing input for Key Performance Indicators
. Breaking down Construction Work Packages (CWP's) into Field
Instruction Work Packages (FIWP's), and ensuring all materials
required to execute a FIWP are bagged and tagged, and stored
securely..
. Identifying critical paths by generating Network Diagrams and
incorporating results in order to align the with clients policies.
. Participating, generating, and reviewing site specific construction,
quality, and safety execution plans.
. Preparing worksite mobilization plan that includes office, trailer,
and shop layout plan, including obtaining trailer occupancy permits.
. Ensuring transport permits are in place.
. Participating in site preparation permits with Alberta governmental
agencies such as ASRD, and AER.
. Working with the Alberta Boiler Safety Branch based on established
good relationship and mutual trust.
. Responding to requests for information (RFI's) when representing an
Owner. Generating RFI's when representing a Contractor
. Responding and issuing non-conformance reports (NCR's).
. Ensuring that all out of scope work is tracked, and authorized by the
Owner or prime contractor.
. Building good working relationships with all project stakeholders
including union and non-union craft people.
. Ensuring that all safety violations and near misses are tracked.
. Ensuring daily field execution progress reports includes mark up of
drawings. Assisting project engineering team on engineering change
notices (ECN's)
. Participate, and provide constructability input during Hazop review
meetings
. Participate in modularization and constructability reviews.
. Preparing construction execution, and equipment installation
procedures
. Preparing QA /QC Manuals.
. Manage Construction Contractors.
June 1998 -Present, PPS Inc.
Oil And Gas Plants, FPSO Construction Management Consultants, Edmonton,
Alberta, Canada, Brazil, South Africa, and USA
Construction Management Consultant
Project Scope Responsibility Sizes $2M -1.5B
List Of Clients from June 1998 To Present Date:
July 7- Present, Jewel Holdings, Maple Ridge, BC
$1M-25M
Auditing, coaching, and working with a high performance senior management
team. Align rapidly growing dynamic pipe fabricator/constructor with high
standard expectation set by oil and gas Owner/ Operators.
May 2014, Pantheon Petro Projects, Calgary, AB
Adviser to new construction company led by well established former senior
construction executives in the oil and gas industry.
March 2013 - April 30, 2014, Lauren Engineers & Constructors
Construction Management Consultant
Building Workface Planning templates. Assisting estimating and bidding on
CWP's ranging from $2M to $35M, led constructability review.. Preparing
construction execution plans, and procedures, reviewing schedules.
Participate in preparing site mobilization plans, construction budgets.
Review and approval of LEM's. Review and respond to NCR's and RFI.
Nov 2012 - Feb 2013, Pembina Pipe Line Corporation
Resthaven Gas Plant Project, Alberta
Owner's Construction Management Consultant
Pressure Vessels And Equipment Modules
Supervising Thermal Design Engineering in Edmonton, Alberta on a $50M+
Module & Equipment Project.
Design Build Contract management of fabrication schedule, review of safety
data. Liaised with home office PM, QA, project engineer as well as
procurement expediter. Generating daily and weekly reports advising Pembina
home office on project status.
February 2012 - Oct 2012, Exxon Mobil
Kearl Lake Project, Alberta
Exxon Mobil Construction Lead/ Manager Water Barge Project Completion
Critical Reclaim Water Barge Project of $65M Project Including Civil Works.
Retained by Exxon Mobil Senior Engineering/Construction Management as
Construction Specialist to provide guidance and assistance to a challenged
major contractor in the execution of the critical Reclaim Water Barge
Project. Reported directly to top Exxon Mobil Construction and engineering
managers. Activities included permits, civil, site preparation, mechanical
completion, barge launching, material supplier sourcing.
Generated FIWP's for internal project tracking purposes
Chaired weekly progress meetings
Participated in daily tool box safety meetings
Generated work permits for contractor.
Participated in Tap Root safety violation investigation
Signed time sheets, and invoices. Reviewed and approved or reject change
orders based on contract agreement.
Responded to RFI and NCR's.
Apr 2011 - Dec 2011, Harvest Energy
Black Gold SAGD Project, Alberta
Construction Consultant and Mechanical Constructability Specialist
Original Budget $400M
Consultant to Harvest Energy Owner: Korean National Oil Corporation (KNOC).
Owner's Construction Management Specialist / Superintendent for Pipe &
Mechanical, and Pressure Equipment Phase 1 Black Gold Project. Hired to
advise KNOC on how to plan and construct a SAGD facility in accordance with
Canadian Best Practices, and advise Korean Prime Contractor GS&C on path to
construction and modularization strategy. Facilitated, and arranged meetings
with Alberta Government licensing agencies such as ABSA, ERCB, and ASRD
reviewed and approved LEM's. Led daily progress reports.
Aug 2008 - Nov 2010, Devon Energy
Jackfish 2 SAGD Project Completion, Alberta
Module Yard Construction Management Consultant
$160 M+ Mod Yard Scope
$115 M Completion of Devon Jackfish #2 $1B SAGD Project Module Yard
Fabrication Scope Labour Cost $160M not including Material Procurement,
Assigned to Cord- Worley Parsons Modular Yard in Blackfalls, AB from August
2008- November 2010. Acted as Devon Energy Construction Management
Consultant for Pipe Modules and Equipment Modules Construction for Jack Fish
1&2 SAGD Heavy Oil sands Extraction Plant, Alberta, Canada.
Reviewed change orders based on contract agreement
Responded to RFI and NCR's
Reviewed contractor superintendent daily progress report based on marked up
drawings.
Reviewed quantity surveyor weekly material input and unfactored weld inch
tracking
Jan 2008 - June 2008, CNRL
Primrose East SAGD Project Completion $15M Scope
Construction Supervisor
Completion of $15M portion of $350M project
Consultant Construction Management Consultant to a medium contractor A I L
construction. Assisted this client to re-align their construction and
quality practices with owner CNRL program. Generated FLRA,JSA, daily work
permits. .Led daily toolbox meetings and weekly general safety meeting.
Approved time sheets, and contractor invoices.
Apr 2007 - Nov 2007, Devon
Jackfish 1 SAGD Project, Conklin, AB
Devon Energy Construction Management Consultant
Re-aligning J1 Project Turnover documentations. Auditing construction
completion for payment release purposes. Supervised team of 6 auditors.
Closed out Jackfish 1 SAGD Project
June 2006 - November 2006, Trans Canada Pipe Line, Edson, Alberta
Construction Management Consultant,
Cobra Constructors $5M
Underground Gas Storage Facility Equipment Erection and Construction
Completion
Jan 2006 - April 2006, Sasol, Secunda, South Africa
Turnaround Project Completion Construction Consultant and Pressure Equipment
Repair Advisor $15M
Secunda, South Africa, Plant Turnaround scope $ 15M portion of $165M Budget.
Construction Consultant for Pressure equipment Integrity Assessment and
repair expert. Performed integrity assessment, wrote repair procedures,
managed and advised SASOL Prime contractors.
May 2005 - Dec 2005, EnCana, Foster Creek SAGD, Alberta
Consultant QA Manager/Construction Supervisor $300M Project Completion
Supervised and audited contractor's quality control QC activities. Provided
leadership to subordinates, and contractor QC manager.
Facilitated and set up orderly turnover activities. Coordinated project
completion walk downs. Set up punch list tracking and management system.
Produced project quality documentation templates
Led weekly quality assurance (QA) progress meeting. Prepared weekly, and
monthly progress reports Worked closely with EnCana projects manager.
Generated rotating equipment installation and testing specs.
Feb 2005 - Apr 2005, Shell Canada, Scotsford Plant Turnaround, Ft
Saskatchewan, AB
Lead Construction Consultant
Total capital cost $145 Million
Alberta Canada, Refinery & Upgrader Turnaround Project
Lead Shell Consultant, Project Pressure Equipment turnaround integrity
assessment repair advisor. Performed pressure tests. In-service pressure
equipment remaining life calculations, wrote repair procedures, in addition
advised Shell Engineering Integrity Group.
May 2004 - Dec 2004, KBR, Brazil
Completion OF 2 FPSO For Petrobras
Lead General Superintendent KBR Direct Hire over $5B total For 2 FPSO.
Total capital cost $5 B, Rio De Janeiro, Brazil, Caratinga (P48) and
Barracuda (P43) FPSO Critical Construction Completion Turnaround.
Key project re-alignment specialist. Hired as Consultant Lead Construction
General Superintendent. Dispatched by KBR Senior management to Brazil to
complete, andre-align $5 Billion FPSO projects. Projects completed
successfully. Reviewed contractor P6 schedules frequently. Signed time
sheets, and invoices. Reviewed and approved or reject change orders based on
contract agreement
Responded to RFI and NCR's. Reviewed subordinate superintendent daily
progress reports based on marked up drawings. Reviewed quantity surveyor
weekly material input
September 2002 - March 2004, KBR - Syncrude
UE-1Project, Ft McMurray, Alberta
Site QA Manager KBR direct hire approx $1.5B KBR Total Scope
$1.5B KBR Contract UE-1 KBR base plant.
Construction Management Consultant /Specialist for Site Brown Field
Greenfield. Tie Ins & Hot Tap execution management. Wrote Hot Tap execution
procedures, and safety execution procedures. Responsible for supervising the
preparation and assembly of Hot Tap Packages. Preparing agenda for HAZOP Hot
Tap meetings Coordinator Generated and Signed off ITP's Punch list tracking
and mitigation Generated FLRA, and JSA as required Generated AB 83 pipe data
sheets, and pressure equipment travellers Generated, and signed off on AB45
documents. Generated Pneumatic and hydro test packages based on LDT's and
energy storage calculations. Supervised Pump installations and alignment,
including pipe strain with composite crews of millwrights, and pipefitters.
Worked with engineering group, and Syncrude plant operation to generate hot
tap tie in packages
Stewarded Hot Tap pre-construction HAZOP meetings
Jan 2002 - Aug 2002, Syncrude
Capital Projects, Ft McMurray, Alberta
Construction & QA $2-5M Small Capital Projects
Looked After 3-4 Projects At One Time
Transferred to Syncrude UE1 Project, Fort McMurray, Alberta. Construction
Management Consultant for Syncrude supervising Prime Contractors, and their
subs.
Participating in budget and commercial issues, reviewing FLRA's and, Safety
score cards. Participating in tool box Meetings. Audited Safety score cards,
and near misses as part of the management of change (MOC) process.
June 1998 - Oct 2001, Bechtel
Equipment Fabrication Supply Chain Expediting Over $400M Projects
Expediter Manager Consultant
GSG Bechtel Based in Vancouver BC, and Houston, Texas.
Responsible for construction execution, time and cost operations for
Washington State, Oregon, Northern California, and BC. Expedited and signed
of tens of $Millions worth of Power Plant, Refinery equipment, including LNG
& NGL process equipment for Bechtel worldwide projects. Supervised and
mentored expediters on construction execution and fabrication execution
practices, Safety, and Quality Audits.
1993-1997 Construction Supervisor & QA Manager
Various Projects In Alberta, BC
Notable Project: Washington State $ 150Million Century Link Stadium -
Previously named King County Soccer & Football Stadium replacing Kingdome
home of the Seattle Seahawks
1990-1992 JV Welding Mechanical, Alberta and BC
Small Mechanical Contracting Businessman
Bidding and performing millwright contracts, fabricating, installing. Pumps
pump jacks, sawmill maintenance.
1985 - 1989 Maersk And Northern Canada Transport Corporation.
Chief & Second Engineer
Responsibilities:
Marine Engineer on Super Tanker with Maersk. Marine Engineer with Northern
Transport Corporation, Hay River, NWT Supervision of ship mechanical, and
electrical crews. Repair and fitting of pumps, diesel propulsion engine,
compressors, and piping.
EDUCATION
1. Georgian College Marine Institute 3 Yrs Coop Program.
2. Power Plant Operation (6 Months) SAIT, Calgary 4th Class Steam Ticket
3. Formerly Marine Engineer 2nd Class Ministry Of Transport Canada
4. BBA, Business. City University, Bellevue, WA. Vancouver, BC Campus
5. Millwright & Welder Journey Person Red Seal
6. Workface Planner Certified
7. Syracuse University Project Management certificate
8. Mount Royal University, Project Management in Construction Certificate
9. National Board of Boiler Inspector educated (8weeks), Columbus, OH
10. API 510 Pressure Vessel Inspector Certified
11. Formerly certified and Commissioned National Board Of Boiler Inspector
A endorsement
12. Formerly Certified 6 Yrs as ABSA In Service Boiler And Pressure
Equipment In Service Inspector
13. CWB Level 3 Welding Inspector
14. Safety Leadership, and Prime Contractor Training
15. Have numerous safety certificates
16. Instructor for CWB Level 1&2 Inspectors at British Columbia Institute
Of Technology,BC & Syncrude UE-1 Project, Ft Mc Murray.