GIOVANNI ISRAEL B. GARDIANO
MECHANICAL ENGINEER
QC PIPING INSPECTOR
aceu80@r.postjobfree.com
De Joya Compound, Alangilan, Batangas City 4200
Philippines
Phone: (043-***-****
Mobile: +639*********
Passport No: EC0185355
OBJECTIVE
A position in a results-oriented organization in the field of
Mechanical Engineering, Oil & Gas, Petrochemicals and Refineries that seeks
an ambitious and career conscious individual, where acquired education and
skills will be utilized towards continuous growth and advancement.
LICENSURE EXAMINATION
October 14-15, 2008 Mechanical Engineering Licensure Examination
(Passed with Gross Weighted Average (GWA)
of 82.7%)
License No: 0070567
WORKING EXPERIENCE
OCTOBER 10, 2011 - OCTOBER 10, 2013 QC Piping Inspector - Specialized
Industrial Services Company LTD. (SISCO) -
Labor Manpower Supply (LMPS) Company -
Jubail, Kingdom of Saudi Arabia
. August 2013 - October 2013 QC Piping Inspector - Specialized
Industrial Services Company LTD. (SISCO) -
Jubail, Kingdom of Saudi Arabia
PROJECT PARTICIPATED
JERP (Jubail Export Refinery Project) Package 8 - Pipeline and Off-
Plot Pipeline Facilities - 8" & 6" Propylene Pipeline
CLIENT: SATORP (Saudi Aramco Total Refining and Petrochemical Company)
. April 2013 - July 2013 QC Piping Inspector - Nesma Eser Onur (NEO) -
Riyadh, Kingdom of Saudi Arabia (LMPS-
Labor Manpower Supply by SISCO)
PROJECT PARTICIPATED
King Abdullah Financial District (KAFD) - Utilities & Infrastructures
CLIENT: RIC (Rayadah Investment Company)
. June 2012 - February 2013 QC Piping Inspector - International Trade
Links (ITL)
MAIN CONTRACTOR: SAIPEM - Manifa, Kingdom of Saudi Arabia (LMPS-Labor
Manpower Supply by SISCO)
PROJECT PARTICIPATED
MANIFA CORE HYDROCARBON FACILITIES (MCHF) - GOSP-2 (Gas Oil Separation
Plant-2)
CLIENT: SAUDI ARAMCO (Saudi Arabian Oil Company)
. January 2012 - May 2012 QC Piping Inspector - JGC Gulf International -
Jubail, Kingdom of Saudi Arabia (LMPS-
Labor Manpower Supply by SISCO)
PROJECT PARTICIPATED
SCOT (Shell Clause Off-Gas Treating) & SWS-4 (Sour Water Stripper Unit
4) Project
CLIENT: SASREF (Saudi Aramco Shell Refinery Co.)
. October 10, 2011 - December 2011 QC Piping Inspector - Specialized
Industrial Services Company LTD. (SISCO) -
Jubail, Kingdom of Saudi Arabia
PROJECT PARTICIPATED
JERP (Jubail Export Refinery Project) Package 8 - Pipeline and Off-
Plot Pipeline Facilities
CLIENT: SATORP (Saudi Aramco Total Refining and Petrochemical Company)
MARCH 17, 2011 - AUGUST 21, 2011 Inspection Coordinator (VID-Vendor
Inspection Division) - Al-Mutawa Samyong
NDT Co., LTD (AMSYCO) - P.O. Box 20356, Al-
Khobar-31952, Kingdom of Saudi Arabia
FEBRUARY 1, 2010 - FEBRUARY 28, 2011 QA/QC Piping Inspector - Atlantic,
Gulf & Pacific (AG&P) Company of Manila
Inc. - Batangas Heavy Fabrication Yard
San Roque, Bauan, Batangas 4201 Philippines
PROJECT PARTICIPATED
British Petroleum (BP) Whiting Refinery Modernization Project
CLIENT: Foster Wheeler (FW) USA Corporation
FEBRUARY 2, 2008 - JANUARY 31, 2010 Design Engineer 1 - Heat Recovery
Steam Generator-Pressure Parts (HRSG-PRP)
Section
Design Department
Babcock - Hitachi Philippines,
Incorporation (BHPI)
San Roque, Bauan, Batangas 4201
Philippines
PROJECTS PARTICIPATED
1. JO - Joetsu Thermal Power Station
. Preparation of Module Assembly Drawings for Block 1, Block 4 and
Block 6.
. Preparation of Header Assembly Drawings for (JO) 1-1.
. Preparation of Fabrication Drawings of Field Parts (Center Seal
Baffle Plate, Connecting Hook, Wing Baffle Plate).
. Preparation of Erection Drawing of the Arrangement of Panel
Block Assembly.
. Preparation of Cutting Plan and Material Withdrawal Table (MWT)
for Header and Panel Block Stoppers.
. Preparation of Summary Sheet (S9), Checklist, and Check Master
Card (CMC) for Block and Header Assembly Drawings.
2. XSER - Senoko Power Station Stage II Repowering, Senoko Power LTD.,
Singapore
. Preparation and Revision of Header Assembly Drawings for Unit
Seven (7).
. Preparation and Revision of Summary Sheet (S9), Material
Withdrawal Table (MWT), Checklist and Check Master Card (CMC)
for Header Assembly Drawings.
. Preparation of Sketch and Fabrication Drawings of Sling Support.
3. NCC - Niigata Clean Combined, Japan
. Preparation of Meti Drawings for Upper and Lower Headers.
4. YS - Yoshinoura Thermal Power Plant
. Preparation of Header Machining Drawings.
TRAINING EXPERIENCE
November 2006 - February 2007 On-the-Job Trainee
Quality Assurance/Quality Control (QA/QC)
Department
Babcock - Hitachi Philippines,
Incorporation (BHPI)
San Roque, Bauan, Batangas
JOB DESCRIPTION
PIPING INSPECTOR:
. Implement Quality Assurance Plan, Procedures, Report Forms and
Flowcharts.
. Conduct actual inspection of materials to conform to reference
standards and specifications.
. Perform in-process inspection before and after fabrication or erection
process.
. Implement approved working procedure according to standards.
. Maintain and review Welders' Qualification Records and Equipment
Calibration Procedures.
. Ensure welding works are carried out in accordance with the approved
Welding Procedure Specification (WPS) and that welding consumables are
correctly used and properly stored.
. Check pipe spool fabrication based on approved isometric drawings,
assembly drawings, bill of materials and applicable codes.
. Ensure correct installation of pipes, valves, instruments, etc. based
on approved drawings and P&ID.
. Conduct alignment check, bolt torqueing inspection, leak or pressure
testing and re-instatement check.
. Record all necessary inspection data.
. Coordinate with the key personnel involved in the project, pertaining
to quality matters.
. Ensure that all Non Destructive Examinations (NDE) requirements are
met.
. Keep records of all projects relevant documents and records.
. Initiate in raising Non Conformance Report (NCR).
. Perform other jobs within competence that may be assigned by QC
supervisor.
INSPECTION COORDINATOR:
. Responsible in coordinating, facilitating and monitoring the
deployment of Inspectors and Expediters, and the timely submission of
pertinent reports to Clients.
. To help ensure Client satisfaction at all times on the services
rendered to them by the Company.
. Supervises Vendor Inspectors and Material Expeditors.
. Logs the technical queries and feedback from the Clients.
. Secures all necessary and appropriate inspection documents such as
inspection and test plans, IAS, etc. prior to any inspection
activities.
. Organizes the filing system, and ensures tractability of all
correspondences according to Purchase Order, project, Client and
vendor.
. Requires the Inspectors to organize their filing system of reports and
Inspection Release Notes according to Client, Project, Supply Order
Number and Vendor; ensures retention of IAP original binding;
separates the binding of Inspection Reports and Releases, and monitors
these documents.
. Monitors the Inspectors' whereabouts; and requires the Inspectors to
comply with the prompt preparation and submission of the DIAR and USA
Forms.
. Monitors the Inspectors' prompt preparation and submission of
Inspection Reports, issuance of Inspection Release Certificates, and
Non-Conformance Reports as required in the Client's written
guidelines.
. Checks the Inspectors' accomplishments against the assignments.
. Reviews and forwards promptly the Inspection Reports to the concerned
Clients.
DESIGN ENGINEER:
. Familiarize the different components of Heat Recovery Steam Generator
(HRSG) especially those pressure-handling equipments through Technical
Education conducted by HRSG-PRP Supervisor and other Senior Members of
the group.
. Application of the different Heat Recovery Steam Generator - Pressure
Parts (HRSG-PRP) Standards for the Preparation of Sketches, Detailed
Designs and Fabrication Drawings through the use of AutoCAD (LT2000,
LT2006) and SolidWorks (2008,2009 Edition) application with Bank
Construction Data and Material Combination as reference data.
. Check, Review and Verify the Boiler Orientation, the Gas Flow, the
Location and the Dimension of different HRSG components in a certain
assembly by looking at the approved Setting Drawings and Material
Combination from Babcock Hitachi K. K. (BHK), Tokyo, Japan.
. Familiarize the Standard Sizes of Plates for the Preparation of
Cutting Plan and Material Withdrawal Table (MWT) for Purchasing of
Materials.
. Prepare Summary Sheet (S9), Parts List, Checklist and Check Master
Card (CMC) for every fabrication drawing.
. Obtaining the Mass of a certain Part/Component of an Assembly by doing
the actual Three-Dimensional (3D) Drawing through SolidWorks (2008,
2009 Edition) application.
QUALIFICATIONS
. Over 5 years of Working Experience
. Knowledgeable in different Standards commonly used in the construction
of Power Plants, Pipelines & Refineries - ASME(ASME II, V, IX, B31.3,
B31.4), API(API 510, 570), Saudi Aramco Standards
. Proficient in using Microsoft Office Applications
. Knowledgeable in using AutoCAD and SolidWorks
. Capable in technical drawing (Fabrication Drawings, Isometric
Drawings, P&ID)
. Practical, methodical and adaptable
. Confident decision-maker who can remain calm in emergencies
. Team Player, fast learner, can work under pressure and with minimum
supervision
EDUCATION
Degree Bachelor of Science in Mechanical
Engineering
Batangas State University
Alangilan, Batangas City
June 2003 - July 04, 2008
Secondary Batangas State University - Integrated
School (IS)
Rizal Avenue, Batangas City
June 1999 - April 2003
Primary Batangas City East Elementary School
P. Herrera St., Batangas City
June 1991 - April 1999
ORGANIZATIONS
October 2008 - Present Philippine Society of Mechanical Engineer (PSME) -
Batangas Chapter
Batangas City
December 03, 2006 - present Spiritual and Leadership Formation
(SLF) for the Youth
Malvar, Batangas
June 2005 - July 2008 Mechanical Engineering Student
Society (MESS)
Batangas State University
Alangilan, Batangas City
June 1999 - March 2002 Association of CTE - Integrated
School Students (ACTELS)
Batangas State University
Rizal Avenue, Batangas City
SEMINARS ATTENDED
April 19, 2012 OHSAS 18001:2007 Safety Management
System &
ISO 14001:2004 Environmental Management
System
SASREF SCOT & SWS 4 Project
Saudi Aramco Shell Refinery (SASREF)
Jubail, Kingdom of Saudi Arabia
January 26, 2008 Gas Turbine Power Plant Design,
Shortcut Techniques in Problem
Solving (Mathematics) and Insights about
Mechanical Engineering Board Examination
Batangas State University
Alangilan, Batangas City
January 26, 2008 Efficiency Improvement of Steam
Cycle and Shortcut Solution in Mathematics
Batangas State University
Alangilan, Batangas City
May 15, 2007 Seminar on Basic CNC Lathe
Machine Programming and Operation
Technical Education and Skills
Development Authority (TESDA)
Region IV - A (CALABARZON)
Regional Training Center
P. Herrera St., Batangas City
April 27-29, 2005 Third National Conference
On Industrial Technology
Batangas State University
Alangilan, Batangas City
PERSONAL DETAILS
Sex : Male
Date of Birth : February 28, 1986
Place of Birth : Sampaguita St., Batangas City
Age : 28
Height : 174 cm
Weight : 80 kg
Nationality : Filipino
Religion : Roman Catholic
Civil Status : Married
Spouse : Charity Buenviaje - Gardiano
Parents : Servillano Asensi Gardiano
Evangeline Bughao - Gardiano
CHARACTER REFERENCES
Engr. Stephen Benet dela Rosa Quality Control (QC)
Supervisor
JGC Gulf International Co. Ltd.
P.O. Box 2257, Al-Khobar 31952,
Saudi Arabia
E-mail:
aceu80@r.postjobfree.com
Tel: (966-*-***-****
Engr. Gregorio Coronel Vice President (VP) - Quality
Management
Atlantic, Gulf & Pacific (AG&P)
Company of Manila Inc. - Batangas
Heavy Fabrication Yard
San Roque, Bauan, Batangas 4201
Philippines
Tel: (043-***-****
Mr. Christian Clifford Fallarcuna PCS Workshop & Critical
Equipment Supervisor
Maintenance Department
Saudi Aramco Total Refining and
Petrochemical Co. (SATORP)
Jubail, Kingdom of Saudi Arabia -
31961
Mobile No: +966-**-***-****
E-
mail: aceu80@r.postjobfree.com
Engr. Jolie Perez Quality Assurance (QA) Manager
Atlantic, Gulf & Pacific (AG&P)
Company of Manila Inc. - Batangas
Heavy Fabrication Yard
San Roque, Bauan, Batangas 4201
Philippines
Tel: (043-***-****
Engr. Jaime Abarquez Manager - Engineering
Department
Atlantic, Gulf & Pacific (AG&P)
Company of Manila Inc. - Batangas
Heavy Fabrication Yard
San Roque, Bauan, Batangas 4201
Philippines
Tel: (043-***-****
I hereby certify that the above information is true and correct to the
best of my knowledge and belief.
GIOVANNI ISRAEL B. GARDIANO
Applicant