PETROVIETNAM TECHNICAL SERVICES CORPORATION
PTSC OFFSHORE SERVICES JSC
CURRICULUM VITAE
Full Name: Vuong Tat Thang
Address: 65A- 30-4 Road -Thang Nhat Ward, VungTau, S. R. Vietnam
Res Phone: (+84) 64.3515758
Fax: (+84) 64.3515759
PERSONAL DATA:
Full Name : Vuong Tat Thang
Date of Birth : 18/02/1983
Place of Birth : Ha Noi City
Permanent Address : 199 Nam Ki Khoi Nghia Street-03 Ward, Vung
Tau City, Ba Ria Vung Tau Province, Viet Nam S.R
Nationality : Vietnamese
Sex : Male
Marital Status : Married
ID Card No. : 111611872
Phone Number : +084.(0)984.731.591
Gmail : aces2y@r.postjobfree.com
Health : Good (Height: 1.74m – Weight: 70kg – Blood group: O)
Interest : Music, Sport
Languages : English, Vietnamese
EDUCATION:
University : Graduated from the Ha Noi University of Mining And
Geology.
Period Major : (Falcuty: Mechanical)
TRAINING:
* Training course of Welding Inspector level 2 (CSWIP 3.1) held by TWI, UK.
CSWIP Cer No. 83037
* Training course of Welding Inspector (WI: AWS-QC1) held by CTWEL, Viet Nam.
Certificate No. CWI CTWEL 1108.02
* Training course of Radiographic Interpretation (RI: SNT-TC-1A Level II) held by NDE,
Vietnam.
Certificate No. NDE/087-14/RI
PTSC Offshore Services Page 1 of 8
CURRICULUM VITAE Vuong Tat Thang
* Re-training course of Liquid Penetration Testing (PT: SNT-TC-1A Level II) held by NDE,
Vietnam.
* Certificate No. NDE/087-14/PT
Training course of Magnetic Particle Testing (MT: SNT-TC-1A Level II) held by NDE, Vietnam.
Certificate No. NDE/198-11/MT
* Training course of Liquid Penetration Testing (PT: SNT-TC-1A Level II) held by NDE, Vietnam.
Certificate No. NDE/198-11/PT
* Training course of Radiographic Testing (RT: SNT-TC-1A Level II) held by NDE, Vietnam.
Certificate No. NDE/198-11/RT
* Training course of Utrasonic Testing (UT: SNT-TC-1A Level II) held by NDE, Vietnam.
Certificate No. NDE/035-13/UT
* Training course of T BOSIET (Offshore Safety Induction and Emergency Training) held by PVD
Technical Training And Certification J.S.C, Certificate verified by OPITO, UK .
Certificate No. 550**********
PROFESSIONAL EXPERIENCE:
General
Good experience in Vessel, Piping & Structrural fabrication quality control execution at onshore site.
Good experience in Piping & Structural quality control execution at offshore hook up & modification
Good experience in Valve, Equipment, Machine, Vessel Installation Quality control
Good experience in NDT, PWHT, Hydrostatic Testing, Bolt tightening, Leak test
Good experience in prepare and review Quality Control Procedure
Good experience in Application technical code: AWS, ASME, API, ASTM, TCVN
Good experience in Onshore & Offshore project quality coordination and management.
EMPLOYMENT HISTORY:
Organization PTSC Offshore Services JSC
Petroleum Technical Service Company - Vietnam
Assigned Position QA/QC Engineer/Welding Inspector
Some major projects participated
No. Details Description
Su Tu Nau North-South project, Offshore hook up for Cuu Long JOC –
1 Project
From March 2014 to Now.
PTSC Offshore Services Page 2 of 8
CURRICULUM VITAE Vuong Tat Thang
Duties and responsibilities: Project Quality Control.
Project scope of work:
Review Project Specification and application Code, Standard
Interpreted P&ID, Isometric Drawing, Structural Drawing
Prepare Overall ITP, FQCP, Matric, HydostaticTestpacks, leak test
packs, Quality Procedures (Welding control procedure, welding
consumable procedure, welding qualification procedure, welder
qualification procedure, hydrostatic and flushing testing procedure,
painting procedure, PWHT procedure, NDT procedure, bolt tightening
procedure, Helium & Nitrogen leak testing procedure… For Submitted
to client
WPS, Welder Qualification
Supervise & inspect and review, witness all the project quality
activities at offshore hookup (Fit up, Weld, NDT, interpretation
radiographic, PWHT, Hydrostatic Test, Bolt Tightening, Leaktest,
Painting, Insulation)
Task/ Monitors physical all kind of valve as Swing check valve, Double
Responsibility block bleed valve, Ball valve, Gate valve, Pressure control valve,
Globe valve… and instruments such as restriction orifice plate, flange
orifice, sampling connection, corrosion coupon, pressure transmitter…
to ensure that work is installed in accordance with P&ID Approved
drawings, specifications.
Coordinates disciplines with others when conflicts arise, resolved
problems and prevent delay.
Attended the Progress Meetings with the Subcontractors (PWHT, NDT,
Insulation), Client, Third Party for Piping & Structural discipline with
correctional actions for time schedule and the target completion.
Prepared & Completed final doc ( Reports, Records, Testpacks,
Procedures, Drawings mark up, Radiographic) for handover to Client
Position QA/QC Leader
RBDP-A Gaslift line project, Onshore Fabrication, Offshore hook up &
2 Project commissioning for Petronas Carligarli Vietnam Limited – From
Octorber 2013 to March 2014.
Duties and responsibilities: Project Quality Control.
Project scope of work:
Review Project Specification and application Code, Standard
Interpreted P&ID, Isometric Drawing, Structural Drawing
Prepare Overall ITP, FQCP, Maxtric, Testpacks, Project Quality
Procedures For Submit to client
Task/
WPS, Welder Qualification
Responsibility
Supervise & inspect, witness all the project quality activities at on
shore fabrication and offshore hookup (Fit up, Weld, NDT, PWHT,
Hydrostatic Test, Bolt Tightening, Leaktest, Painting)
Monitors physical all kind of valve as Swing check valve, Double
block bleed valve, Ball valve, Gate valve, Pressure control valve,
Globe valve and instruments such as restriction orifice plate, flange
PTSC Offshore Services Page 3 of 8
CURRICULUM VITAE Vuong Tat Thang
orifice, sampling connection, corrosion coupon, pressure transmitter to
ensure that work is installed in accordance with Approved drawings,
specifications.
Coordinates disciplines with others when conflicts arise, resolved
problems and prevent delay.
Attended the Progress Meetings with the Subcontractors, Client, Third
Party for Piping & Structural discipline with correctional actions for
time schedule and the target completion.
To actively participate in promotion of Client HSE Golden Rules and
other site HSE activities, helping to ensure a common understanding
with all project personnel
Prepared & Completed final doc( Reports, Records, Testpacks,
Documents, Drawings) for handover to Client
Position QA/QC Leader
THANG LONG-DONG DO offshore hook up & commissioning for
3 Project
LSJOC – From June 2013 to Octorber 2013.
Duties and responsibilities: Project Quality Control.
Project scope of work:
Review Project Specification and application Code, Standard
Interpreted Layout Drawing, P&ID Drawing, Isometric Drawing,
Structural Drawing
Establish Overall ITP, Maxtric, Project Quality Procedures For Submit
WPS, Welder Qualification
Supervise & control all the project quality activities at offshore location
Task/
(Fit up, Weld, NDT, PWHT, Hydrostatic Test, Bolt Tightening,
Responsibility
Leaktest, Insulation)
Coordinates disciplines with others when conflicts arise, resolved
problems and prevent delay.
Attended the Progress Meetings with the Subcontractors, Client, Third
Party for Piping & Structural discipline with correctional actions for
time schedule and the target completion.
Prepared & Completed Reports, Records, Testpacks, Documents,
Drawings for handover to Client
Position QA/QC Leader
BLOCK 12 DUA MODIFICATION PROJECT-EMAS
4 Project
CONSTRUCTION & ENGINEERING – From Sep 2012 to June 2013
Duties and responsibilities: Project Quality Control.
Project scope of work:
Kick off meeting of pre – inspection with Client
Review Project Specs, Drawings & application Code
Task/
Establish and revise ITP, Matrix, Quality Control Procedure for submit
Responsibility
WPS, Welder Qualification
Review Certificates, Inspect quality of income materials
Spool And Lifting Platform fabrication process quality control (Fit-Up,
Weld, NDT, PWHT, Hydrostatic Testing) at workshop
PTSC Offshore Services Page 4 of 8
CURRICULUM VITAE Vuong Tat Thang
Prepare and Complete Reports, Records, Testpack, Drawing document for
handover to client
Position QA/QC engineer
HAI SU TRANG-DEN offshore hook up & commissioning for TLJOC –
5 Project
From July 2012 to Sep 2012.
Duties and responsibilities: Project Quality Control.
Project scope of work:
Review Project Specification and application Code, Standard
Interpreted Layout Drawing, Isometric Drawing, Structural Drawing
Prepare Overall ITP, FQCP, Maxtric, Project Quality Procedures For
Submit
WPS, Welder Qualification
Supervise & inspect, wittness all the project quality activities at
offshore location (Fit up, Weld, NDT, PWHT, Hydrostatic Test, Bolt
Tightening, Leaktest, Insulation)
Task/
Monitors physical valve, spool offshore hookup to ensure that work is
Responsibility
installed in accordance with drawings, specifications.
Coordinates disciplines with others when conflicts arise, resolved
problems and prevent delay.
Attended the Progress Meetings with the Subcontractors, Client, Third
Party for Piping & Structural discipline with correctional actions for
time schedule and the target completion.
To actively participate in promotion of Client HSE Golden Rules and
other site HSE activities, helping to ensure a common understanding
with all project personnel
Prepared & Completed Reports, Records, Testpacks, Documents,
Drawings for handover to Client
Position QA/QC Leader
TBVN FPSO Air Skid Fabrication-Cuulong JOC from April 2012 to
6 Project
July 2012
Be responsible to review and approve quality control procedure overrally
from subcontractor submit (ITP, Matrix, QC procedure)
Witness WPS, Welder qualification
Review/inspect Certificates of the Project income machine, equipment,
tool, material
Task/
Inspect/supervise the compilation and completion of Air Skid Vessel,
Responsibility
Spool, Support quality control process (Fit Up, Weld, NDT, PWHT,
Hydrostatic Testing)
Review and accept all of reports, records, documents, drawing from
Subcontractor for handover to Client
To update and issue the quality weekly report to Project Manager
Position QA/QC Engineer
DA NANG Project Management Board-Dragon Bridge Structural
7 Project
Fabrication From April 2011 to April 2012
Kick off meeting of pre – fabrication with contractor, consultant
Task/
Responsibility Review quality control document, code, standard of Project (Spec, AWS
D1.1, D1.5, ASTM, TCVN).
PTSC Offshore Services Page 5 of 8
CURRICULUM VITAE Vuong Tat Thang
Manage/supervise the contractor preparation quality of Tool, equipment,
material to meet the project Specs (Certificates, Sticky, Test Report)
Review/approve Structure ITP, Quality Procedure from contractor submit
Witness & approve Welder, WPS Qualification
Witness & supervise of (Plate, Beam, Channel, Angle) welding work &
mechanical work (Fit up check, weldment visual, NDT, Painting, Bolt
tightening)
Co-ordinate with Project Management Team on all quality execution-
related matters by establishing direct communication with all functional
department
Attended the Progress Meetings with Contractor, consultant, for
Mechanical discipline with correctional actions for time schedule and the
target completion
Position Structural QA/QC Engineer
Keang Nam Tower – Keangnam Enterprise (Korea) from September
8 Project
2009- April 2011
Reports directly to the Mechanical Manager
Responsible for coordination of all project mechanical activities and
leading project mechanical team to a safe and successful project completion.
Connect to HaNoi water drainage, Supply company for drainage,
supply permission.
Searching mechanical subcontractor, vendor for the Project, contact for
disscussion meeting
Interpret piping plan drawings, shop drawing, procedures, and
specifications for using
Supervise cutting, welding, Painting, insulation and field inspection in
the area of mechanical works ensuring these are implemented in
accordance with Shop drawing, design documentation and company's
procedures.
Verifies corect installation and of AC piping with all components and
equipment (Sleeves, fittings, traps, thread rod, supports,
Task/
hangers,(anchor, guide, spring) Vibrasion, isolation, valve, Pumps,
Responsibility
AHU, FCU, Chillers, steam boilers, cooling tower, Heat exchanger,
unit heater, water Tank, expansion tank, Filter etc..)
Verifies corect installation and of waste water treatment piping, water
supply piping, swimming pool piping with all components and
equipment (Sleeves, fittings, traps, thread rod, supports,
hangers,(anchor, guide, spring) Vibrasion, valve, micro filter, media
filter, carbon filter, UV sterilizer, balancing tank, hair and fiber trap,
ozone mixing chamber, exhaust ozone destroyer, PH sensor, CL
dosing pump, CL tank, reaction tank, multi media filter, etc..)
Verifies corect installation and of sprinkler piping system, outdoor
hydrant piping system, indoor hydrant piping system, with all
components and equipment (Sleeves, fittings, thread rod, supports,
hangers,Vibrasion, valve, flexsible joint, water hammer cushion,
sprinkler, hydrant cock, fire cabinet, fire pumps, water tank etc..)
Verifies corect installation of AC duct, Smoke control duct, ventilation
PTSC Offshore Services Page 6 of 8
CURRICULUM VITAE Vuong Tat Thang
duct with all components (fitting, Sound attenautor, sound chamber,
Volume dump, fire dump, back draft damper, insect screen, grill,
register, Louver, Fan, AHU ( Vibration isolator, casing, Frame, motor,
Supply fan, Exhaust fan, Cooling Coil, Air Filter, drain pan etc..)
Witnesses all piping construction verifications hydrostatic testing and
Leak Test for duct work.
Assists client, control Subcontractor in planing and scheduling work to
obtain maximum efficiency
Forming and maintaining good working relationship with Client,
Consult and the Company team personnel.
Position Mechanical Engineer
Go Dau LPG Storage Project- Petro Construction Company from
March 2008 to September 2009
9 Project
(2 LPG Spherical Tanks Fabrication And Installation -1500 tons; over
3000 M3 )
Familirization to the relevant code and specification, procedure (welding
procedure specification, post weld heat treatment, non-destructive testing
procedures and report), check welding equipment and calibration certificates.
Material identification, size, type and condition. Consumables type, size,
condition, storage and handling. Review WPS. Check joint preparation,
Check pre-heating before welding.
Check weather condition, clearance for welding, welder identification,
Task/
Responsibility check consumables as per WPS used, welding parameters, Check distortion
control, travel speed, Check interpass cleaning, interpass temperature, check
usage of line up clamps, maintain daily log book.
Perform visual inspection, check weld and welder identification, post
weld heat treatment. Non-destructive testing witness, Acceptance standards
of NDT, repair, dimention check as per drawings
Writing request NDT, review and restore NDT reports from NDT
Department. Document Control-welding reports.
Welding Inspector
Position
Cu Lao Tao Oil Storage Project- Petro Construction Company from may
10 Project 2007 to march 2008
(Process and Fire Fighting Piping System Fabrication, Installation)
To get and Interpret P&ID, Isometric, layout drawings and specifications
for used
Calculates quatity of equipment, material for purchasing department
Preparing and ordering labours ( Engineer, Foremans, welder, fitter,
painter working equipments and materials (welding machines, electrodes,
Task/ ovens, quiver, welding cables, welding clip, clamps, jig tool for fit up joint,
Responsibility grinding machines, cutting machines, grinding and cutting wheels, oxy, gas
catridger, misalignment gauges, multi purpose welding gauge, temperature
gun, rollers, brushs, paint tool transportation and lifting machines
(dumptruck, crane, sideboom
Monitors physical installations to ensure that work is installed in
accordance with drawings, specifications and applicable codes (special fire
water pump station and process pump station)
PTSC Offshore Services Page 7 of 8
CURRICULUM VITAE Vuong Tat Thang
Verifies corect welding of piping with all components ( Fitting, supports,
Flexible joint, hangers, valve, filter, Foam tank, Fire cock, Fire pump and
process pump, meter etc..)
Control, Witnesses all piping construction activities (Fit up, welding,
NDT, PWHT, Hydrostatic Testing, Coating)
Assurance for planing and scheduling work to obtain maximum efficiency
Attended the progress meetings with the consultant, Client for
Mechanical discipline with correctional actions for time schedule and the
target completion
Position Construction Manager
Dung Quat refinery Project-Petro Construction Company from June 2006
11 Project
to may 2007
Prepared for ITP, FQCP, Quality procedure (Welding control, welding
Consumable, Surface preparing & painting, NDT, PWHT, Hydrostatic
testing, quality plan, welding qualification, welder qualification, register)
Interprets piping P&ID’s; GA’s; Piping Layouts; Isometrics drawings and
specifications for used
Supervise quality activities (Fit Up, Welding, NDT, PWHT, Hydrostatic
Testing, Coating)
Task/
Responsibility Monitors physical spool fabrication and piping, valve, instrument
installation to ensure that work is installed in accordance with drawings,
specifications and applicable codes
Assists contractor in planing and scheduling work to obtain maximum
efficiency
Prepare of inspection reports such as RFI, QC form, Realease note, Test
pack, daily report, weekly progress reports, informational status of
mechanical activities
QA/QC Engineer
Position
I declare that the information provide in this form is correct. I will take all responsibilities for the
above information.
Date 1st June. 2014
Applicant
VUONG TAT THANG
PTSC Offshore Services Page 8 of 8