Post Job Free

Resume

Sign in

Quality Control Project

Location:
Ba Ria - Vung Tau, Vietnam
Salary:
2200
Posted:
July 01, 2014

Contact this candidate

Resume:

PETROVIETNAM TECHNICAL SERVICES CORPORATION

PTSC OFFSHORE SERVICES JSC

CURRICULUM VITAE

Full Name: Vuong Tat Thang

Address: 65A- 30-4 Road -Thang Nhat Ward, VungTau, S. R. Vietnam

Res Phone: (+84) 64.3515758

Fax: (+84) 64.3515759

PERSONAL DATA:

Full Name : Vuong Tat Thang

Date of Birth : 18/02/1983

Place of Birth : Ha Noi City

Permanent Address : 199 Nam Ki Khoi Nghia Street-03 Ward, Vung

Tau City, Ba Ria Vung Tau Province, Viet Nam S.R

Nationality : Vietnamese

Sex : Male

Marital Status : Married

ID Card No. : 111611872

Phone Number : +084.(0)984.731.591

Gmail : aces2y@r.postjobfree.com

Health : Good (Height: 1.74m – Weight: 70kg – Blood group: O)

Interest : Music, Sport

Languages : English, Vietnamese

EDUCATION:

University : Graduated from the Ha Noi University of Mining And

Geology.

Period Major : (Falcuty: Mechanical)

TRAINING:

* Training course of Welding Inspector level 2 (CSWIP 3.1) held by TWI, UK.

CSWIP Cer No. 83037

* Training course of Welding Inspector (WI: AWS-QC1) held by CTWEL, Viet Nam.

Certificate No. CWI CTWEL 1108.02

* Training course of Radiographic Interpretation (RI: SNT-TC-1A Level II) held by NDE,

Vietnam.

Certificate No. NDE/087-14/RI

PTSC Offshore Services Page 1 of 8

CURRICULUM VITAE Vuong Tat Thang

* Re-training course of Liquid Penetration Testing (PT: SNT-TC-1A Level II) held by NDE,

Vietnam.

* Certificate No. NDE/087-14/PT

Training course of Magnetic Particle Testing (MT: SNT-TC-1A Level II) held by NDE, Vietnam.

Certificate No. NDE/198-11/MT

* Training course of Liquid Penetration Testing (PT: SNT-TC-1A Level II) held by NDE, Vietnam.

Certificate No. NDE/198-11/PT

* Training course of Radiographic Testing (RT: SNT-TC-1A Level II) held by NDE, Vietnam.

Certificate No. NDE/198-11/RT

* Training course of Utrasonic Testing (UT: SNT-TC-1A Level II) held by NDE, Vietnam.

Certificate No. NDE/035-13/UT

* Training course of T BOSIET (Offshore Safety Induction and Emergency Training) held by PVD

Technical Training And Certification J.S.C, Certificate verified by OPITO, UK .

Certificate No. 550**********

PROFESSIONAL EXPERIENCE:

General

Good experience in Vessel, Piping & Structrural fabrication quality control execution at onshore site.

Good experience in Piping & Structural quality control execution at offshore hook up & modification

Good experience in Valve, Equipment, Machine, Vessel Installation Quality control

Good experience in NDT, PWHT, Hydrostatic Testing, Bolt tightening, Leak test

Good experience in prepare and review Quality Control Procedure

Good experience in Application technical code: AWS, ASME, API, ASTM, TCVN

Good experience in Onshore & Offshore project quality coordination and management.

EMPLOYMENT HISTORY:

Organization PTSC Offshore Services JSC

Petroleum Technical Service Company - Vietnam

Assigned Position QA/QC Engineer/Welding Inspector

Some major projects participated

No. Details Description

Su Tu Nau North-South project, Offshore hook up for Cuu Long JOC –

1 Project

From March 2014 to Now.

PTSC Offshore Services Page 2 of 8

CURRICULUM VITAE Vuong Tat Thang

Duties and responsibilities: Project Quality Control.

Project scope of work:

Review Project Specification and application Code, Standard

Interpreted P&ID, Isometric Drawing, Structural Drawing

Prepare Overall ITP, FQCP, Matric, HydostaticTestpacks, leak test

packs, Quality Procedures (Welding control procedure, welding

consumable procedure, welding qualification procedure, welder

qualification procedure, hydrostatic and flushing testing procedure,

painting procedure, PWHT procedure, NDT procedure, bolt tightening

procedure, Helium & Nitrogen leak testing procedure… For Submitted

to client

WPS, Welder Qualification

Supervise & inspect and review, witness all the project quality

activities at offshore hookup (Fit up, Weld, NDT, interpretation

radiographic, PWHT, Hydrostatic Test, Bolt Tightening, Leaktest,

Painting, Insulation)

Task/ Monitors physical all kind of valve as Swing check valve, Double

Responsibility block bleed valve, Ball valve, Gate valve, Pressure control valve,

Globe valve… and instruments such as restriction orifice plate, flange

orifice, sampling connection, corrosion coupon, pressure transmitter…

to ensure that work is installed in accordance with P&ID Approved

drawings, specifications.

Coordinates disciplines with others when conflicts arise, resolved

problems and prevent delay.

Attended the Progress Meetings with the Subcontractors (PWHT, NDT,

Insulation), Client, Third Party for Piping & Structural discipline with

correctional actions for time schedule and the target completion.

Prepared & Completed final doc ( Reports, Records, Testpacks,

Procedures, Drawings mark up, Radiographic) for handover to Client

Position QA/QC Leader

RBDP-A Gaslift line project, Onshore Fabrication, Offshore hook up &

2 Project commissioning for Petronas Carligarli Vietnam Limited – From

Octorber 2013 to March 2014.

Duties and responsibilities: Project Quality Control.

Project scope of work:

Review Project Specification and application Code, Standard

Interpreted P&ID, Isometric Drawing, Structural Drawing

Prepare Overall ITP, FQCP, Maxtric, Testpacks, Project Quality

Procedures For Submit to client

Task/

WPS, Welder Qualification

Responsibility

Supervise & inspect, witness all the project quality activities at on

shore fabrication and offshore hookup (Fit up, Weld, NDT, PWHT,

Hydrostatic Test, Bolt Tightening, Leaktest, Painting)

Monitors physical all kind of valve as Swing check valve, Double

block bleed valve, Ball valve, Gate valve, Pressure control valve,

Globe valve and instruments such as restriction orifice plate, flange

PTSC Offshore Services Page 3 of 8

CURRICULUM VITAE Vuong Tat Thang

orifice, sampling connection, corrosion coupon, pressure transmitter to

ensure that work is installed in accordance with Approved drawings,

specifications.

Coordinates disciplines with others when conflicts arise, resolved

problems and prevent delay.

Attended the Progress Meetings with the Subcontractors, Client, Third

Party for Piping & Structural discipline with correctional actions for

time schedule and the target completion.

To actively participate in promotion of Client HSE Golden Rules and

other site HSE activities, helping to ensure a common understanding

with all project personnel

Prepared & Completed final doc( Reports, Records, Testpacks,

Documents, Drawings) for handover to Client

Position QA/QC Leader

THANG LONG-DONG DO offshore hook up & commissioning for

3 Project

LSJOC – From June 2013 to Octorber 2013.

Duties and responsibilities: Project Quality Control.

Project scope of work:

Review Project Specification and application Code, Standard

Interpreted Layout Drawing, P&ID Drawing, Isometric Drawing,

Structural Drawing

Establish Overall ITP, Maxtric, Project Quality Procedures For Submit

WPS, Welder Qualification

Supervise & control all the project quality activities at offshore location

Task/

(Fit up, Weld, NDT, PWHT, Hydrostatic Test, Bolt Tightening,

Responsibility

Leaktest, Insulation)

Coordinates disciplines with others when conflicts arise, resolved

problems and prevent delay.

Attended the Progress Meetings with the Subcontractors, Client, Third

Party for Piping & Structural discipline with correctional actions for

time schedule and the target completion.

Prepared & Completed Reports, Records, Testpacks, Documents,

Drawings for handover to Client

Position QA/QC Leader

BLOCK 12 DUA MODIFICATION PROJECT-EMAS

4 Project

CONSTRUCTION & ENGINEERING – From Sep 2012 to June 2013

Duties and responsibilities: Project Quality Control.

Project scope of work:

Kick off meeting of pre – inspection with Client

Review Project Specs, Drawings & application Code

Task/

Establish and revise ITP, Matrix, Quality Control Procedure for submit

Responsibility

WPS, Welder Qualification

Review Certificates, Inspect quality of income materials

Spool And Lifting Platform fabrication process quality control (Fit-Up,

Weld, NDT, PWHT, Hydrostatic Testing) at workshop

PTSC Offshore Services Page 4 of 8

CURRICULUM VITAE Vuong Tat Thang

Prepare and Complete Reports, Records, Testpack, Drawing document for

handover to client

Position QA/QC engineer

HAI SU TRANG-DEN offshore hook up & commissioning for TLJOC –

5 Project

From July 2012 to Sep 2012.

Duties and responsibilities: Project Quality Control.

Project scope of work:

Review Project Specification and application Code, Standard

Interpreted Layout Drawing, Isometric Drawing, Structural Drawing

Prepare Overall ITP, FQCP, Maxtric, Project Quality Procedures For

Submit

WPS, Welder Qualification

Supervise & inspect, wittness all the project quality activities at

offshore location (Fit up, Weld, NDT, PWHT, Hydrostatic Test, Bolt

Tightening, Leaktest, Insulation)

Task/

Monitors physical valve, spool offshore hookup to ensure that work is

Responsibility

installed in accordance with drawings, specifications.

Coordinates disciplines with others when conflicts arise, resolved

problems and prevent delay.

Attended the Progress Meetings with the Subcontractors, Client, Third

Party for Piping & Structural discipline with correctional actions for

time schedule and the target completion.

To actively participate in promotion of Client HSE Golden Rules and

other site HSE activities, helping to ensure a common understanding

with all project personnel

Prepared & Completed Reports, Records, Testpacks, Documents,

Drawings for handover to Client

Position QA/QC Leader

TBVN FPSO Air Skid Fabrication-Cuulong JOC from April 2012 to

6 Project

July 2012

Be responsible to review and approve quality control procedure overrally

from subcontractor submit (ITP, Matrix, QC procedure)

Witness WPS, Welder qualification

Review/inspect Certificates of the Project income machine, equipment,

tool, material

Task/

Inspect/supervise the compilation and completion of Air Skid Vessel,

Responsibility

Spool, Support quality control process (Fit Up, Weld, NDT, PWHT,

Hydrostatic Testing)

Review and accept all of reports, records, documents, drawing from

Subcontractor for handover to Client

To update and issue the quality weekly report to Project Manager

Position QA/QC Engineer

DA NANG Project Management Board-Dragon Bridge Structural

7 Project

Fabrication From April 2011 to April 2012

Kick off meeting of pre – fabrication with contractor, consultant

Task/

Responsibility Review quality control document, code, standard of Project (Spec, AWS

D1.1, D1.5, ASTM, TCVN).

PTSC Offshore Services Page 5 of 8

CURRICULUM VITAE Vuong Tat Thang

Manage/supervise the contractor preparation quality of Tool, equipment,

material to meet the project Specs (Certificates, Sticky, Test Report)

Review/approve Structure ITP, Quality Procedure from contractor submit

Witness & approve Welder, WPS Qualification

Witness & supervise of (Plate, Beam, Channel, Angle) welding work &

mechanical work (Fit up check, weldment visual, NDT, Painting, Bolt

tightening)

Co-ordinate with Project Management Team on all quality execution-

related matters by establishing direct communication with all functional

department

Attended the Progress Meetings with Contractor, consultant, for

Mechanical discipline with correctional actions for time schedule and the

target completion

Position Structural QA/QC Engineer

Keang Nam Tower – Keangnam Enterprise (Korea) from September

8 Project

2009- April 2011

Reports directly to the Mechanical Manager

Responsible for coordination of all project mechanical activities and

leading project mechanical team to a safe and successful project completion.

Connect to HaNoi water drainage, Supply company for drainage,

supply permission.

Searching mechanical subcontractor, vendor for the Project, contact for

disscussion meeting

Interpret piping plan drawings, shop drawing, procedures, and

specifications for using

Supervise cutting, welding, Painting, insulation and field inspection in

the area of mechanical works ensuring these are implemented in

accordance with Shop drawing, design documentation and company's

procedures.

Verifies corect installation and of AC piping with all components and

equipment (Sleeves, fittings, traps, thread rod, supports,

Task/

hangers,(anchor, guide, spring) Vibrasion, isolation, valve, Pumps,

Responsibility

AHU, FCU, Chillers, steam boilers, cooling tower, Heat exchanger,

unit heater, water Tank, expansion tank, Filter etc..)

Verifies corect installation and of waste water treatment piping, water

supply piping, swimming pool piping with all components and

equipment (Sleeves, fittings, traps, thread rod, supports,

hangers,(anchor, guide, spring) Vibrasion, valve, micro filter, media

filter, carbon filter, UV sterilizer, balancing tank, hair and fiber trap,

ozone mixing chamber, exhaust ozone destroyer, PH sensor, CL

dosing pump, CL tank, reaction tank, multi media filter, etc..)

Verifies corect installation and of sprinkler piping system, outdoor

hydrant piping system, indoor hydrant piping system, with all

components and equipment (Sleeves, fittings, thread rod, supports,

hangers,Vibrasion, valve, flexsible joint, water hammer cushion,

sprinkler, hydrant cock, fire cabinet, fire pumps, water tank etc..)

Verifies corect installation of AC duct, Smoke control duct, ventilation

PTSC Offshore Services Page 6 of 8

CURRICULUM VITAE Vuong Tat Thang

duct with all components (fitting, Sound attenautor, sound chamber,

Volume dump, fire dump, back draft damper, insect screen, grill,

register, Louver, Fan, AHU ( Vibration isolator, casing, Frame, motor,

Supply fan, Exhaust fan, Cooling Coil, Air Filter, drain pan etc..)

Witnesses all piping construction verifications hydrostatic testing and

Leak Test for duct work.

Assists client, control Subcontractor in planing and scheduling work to

obtain maximum efficiency

Forming and maintaining good working relationship with Client,

Consult and the Company team personnel.

Position Mechanical Engineer

Go Dau LPG Storage Project- Petro Construction Company from

March 2008 to September 2009

9 Project

(2 LPG Spherical Tanks Fabrication And Installation -1500 tons; over

3000 M3 )

Familirization to the relevant code and specification, procedure (welding

procedure specification, post weld heat treatment, non-destructive testing

procedures and report), check welding equipment and calibration certificates.

Material identification, size, type and condition. Consumables type, size,

condition, storage and handling. Review WPS. Check joint preparation,

Check pre-heating before welding.

Check weather condition, clearance for welding, welder identification,

Task/

Responsibility check consumables as per WPS used, welding parameters, Check distortion

control, travel speed, Check interpass cleaning, interpass temperature, check

usage of line up clamps, maintain daily log book.

Perform visual inspection, check weld and welder identification, post

weld heat treatment. Non-destructive testing witness, Acceptance standards

of NDT, repair, dimention check as per drawings

Writing request NDT, review and restore NDT reports from NDT

Department. Document Control-welding reports.

Welding Inspector

Position

Cu Lao Tao Oil Storage Project- Petro Construction Company from may

10 Project 2007 to march 2008

(Process and Fire Fighting Piping System Fabrication, Installation)

To get and Interpret P&ID, Isometric, layout drawings and specifications

for used

Calculates quatity of equipment, material for purchasing department

Preparing and ordering labours ( Engineer, Foremans, welder, fitter,

painter working equipments and materials (welding machines, electrodes,

Task/ ovens, quiver, welding cables, welding clip, clamps, jig tool for fit up joint,

Responsibility grinding machines, cutting machines, grinding and cutting wheels, oxy, gas

catridger, misalignment gauges, multi purpose welding gauge, temperature

gun, rollers, brushs, paint tool transportation and lifting machines

(dumptruck, crane, sideboom

Monitors physical installations to ensure that work is installed in

accordance with drawings, specifications and applicable codes (special fire

water pump station and process pump station)

PTSC Offshore Services Page 7 of 8

CURRICULUM VITAE Vuong Tat Thang

Verifies corect welding of piping with all components ( Fitting, supports,

Flexible joint, hangers, valve, filter, Foam tank, Fire cock, Fire pump and

process pump, meter etc..)

Control, Witnesses all piping construction activities (Fit up, welding,

NDT, PWHT, Hydrostatic Testing, Coating)

Assurance for planing and scheduling work to obtain maximum efficiency

Attended the progress meetings with the consultant, Client for

Mechanical discipline with correctional actions for time schedule and the

target completion

Position Construction Manager

Dung Quat refinery Project-Petro Construction Company from June 2006

11 Project

to may 2007

Prepared for ITP, FQCP, Quality procedure (Welding control, welding

Consumable, Surface preparing & painting, NDT, PWHT, Hydrostatic

testing, quality plan, welding qualification, welder qualification, register)

Interprets piping P&ID’s; GA’s; Piping Layouts; Isometrics drawings and

specifications for used

Supervise quality activities (Fit Up, Welding, NDT, PWHT, Hydrostatic

Testing, Coating)

Task/

Responsibility Monitors physical spool fabrication and piping, valve, instrument

installation to ensure that work is installed in accordance with drawings,

specifications and applicable codes

Assists contractor in planing and scheduling work to obtain maximum

efficiency

Prepare of inspection reports such as RFI, QC form, Realease note, Test

pack, daily report, weekly progress reports, informational status of

mechanical activities

QA/QC Engineer

Position

I declare that the information provide in this form is correct. I will take all responsibilities for the

above information.

Date 1st June. 2014

Applicant

VUONG TAT THANG

PTSC Offshore Services Page 8 of 8



Contact this candidate