CURRICULUM VITAE
[pic]
Name: ANTONIO BATTISTI
Born Bitonto (BA) Italy
Date 15/01/1947
Status Married
Contact
Antonio Battisti
OIL AND GAS Construction/Project Management
CONSULTANT
No.24, Jalan BRP 2/1c
Bukit Rahman Putra
47000 Sg. Buloh
Selangor - Malaysia
Tel / Fax : (60-036*******
Mobile : (60-012*******
aceqje@r.postjobfree.com
Education:
Electrical Engineer (1968)
Other titles and training:
Training in Site Safety Management in Milan, Italy, 1999
Knowledge of Languages:
Mother tongue Italian, fluent in English, good in French and Spanish,
Russian basic
PC software:
Excel, WinWord, Winproject, Power Point.
:
Qualifications
JOB ENGINEERING VARIOUS PLANT
COSTRUCTION COMMISSIONING AS SITE CONSTRUCTION MANAGER OF POWER GENERATION
SIMPLE CICLE AND COGENERATION PlANT UP TO 1200 MW PLANT,Thermal Power Plant
and Ammonia,fertilizer and LNG OIL AND GAS
PROJECT MANAGING
Strengths
ACT WITH UNYIELDING INTEGRITY IN BUSINESS TRANSATION,CONFORM TO PROMOTE
COMPANY POLICIES
Career Interests
Regional Manager
Site Construction manager/Project Director for large project
General Manager for large project Power CoGeneration Plants and Oil and
Gas Plant
Director for Long therm assistance maintenance LNG PLANT as Resident
Engineer
WORK ESPERIENCE
1 st January 2014
Ready to take any opportunity on site managing or project managing inside
and outside Malaysia
January 2011 till 31/12/2013
Consultant for customer Bidding a Coogeneration plant in SABA (Malaysia)
100MW /keddah Malaysia 1500 MW
July 2010 till December 2010
Company ALSTOM
Mechanical Construction Manager PIPING Power Block
3 x400 MW Thermal Cogeneration power Plant
Shoaiba SAUDI ARABIA Phase 3 I was managing all the Turbo block Piping
activity and part of the BOP plant,I have been called by Alstom to boost
this activity that was jeopardizing all project with 6 month contract
january2010 -June 2010
Consultant to various customer for bidding in power plant Malaysia
June 2009 till December 2009
Company: INITEC
Site manager
BOP Thermal cogeneration Power plant 2x 350 MW Gas /Oil fire unit El
tebbin Cairo Egypt I was managing more than 40 supervisors two construction
manager and 1 Commissioning manager and Construction company with 1000
employees
May 2008 -June 2009
Consultant various customer
JUNE 2007 till may 2008
Company: Foster Wheeler Singapore
Coogeneration Power Plant Area manager in Brunei (customer BLNG)
Cogeneration PowerPlant consisting 1 Frame 5 +HRSG and all piping
including civil and structure work I was area manager managing all the
activity related to the Coogeneration Turbo group (Gas turbine + Generator
Boiler + Steam turbine and Generator and all BOP we were Client
Representative .
Company: Shinryo (M) Sdn Bhd(EPCC)
2005 -2007
CCPP Construction Manager in Malaysia(Melaka) (customer PETRONAS ) in a
contract of Engineering/Procurement/Erection/Commissioning/Start up of a CO-
GENERATION Power Plant, 4 Frame 5 Units+ Generators,1 Steam
turbine+Generator,4 HRSG and balance of plant
Company: GE Energy
2004
Bintulu Malaysia LNG (PETRONAS ) as Site Director for daily trouble
shutting maintenance and planned maintenance all LNG turbo gas modules of
SATU DUA and TIGA plant Managing the overall shutdown .
Company: GE Oil and GAS /Nuovo Pignone
2002 -2003
Malaysia as a Resident Project Manager for all erection/commissioning
/start up activities in Far East area including trouble shooting and
planned revision in Turbo Compressors and Turbo Generators Plant and
Cogeneration Plants Supplyed BY GENERAL ELECTRIC in the Far East area(From
China to Australia)
Company: Nuovo Pignone
2000-2001
CCPP Site Manager in Singapore (customer Shell Seraya) in a contract of
erection/commissioning/start up of a Gas Turbine Power Plant, 2 Frame 5
Units rated 2x27 MW plus balance of plant
Company: Nuovo Pignone
1999 - 2000
Site Manager in Kertih Malaysia (customer Petronas) in a contract of
erection/commissioning/start up of an CO2/Ammonia Plant, 3 steam turbine
plus 5 Compressor and balance of plant
Company: Nuovo Pignone
1999
Site Manager in El Morell Spain (customer Repsol) in a turn key contract of
erection/commissioning/start up of a Gas Turbine coo-generation Power
Plant, 1 Frame 3 + generator and 1 steam turbine plus Generator and balance
of plant
Company: Nuovo Pignone (Turbotecnica)EPCC
1997 - 1999
CCPP Site Manager in Sarroch Italy (Customer Saras) in a turn key contract
from engineering phase till erection/commissioning/start up of a LARGE
PROJET of Gas Turbine coo-generation Power Plant N. 3 Train of Frame 9 Gas
Turbine rated 110 MW each in line with a steam turbine Supplied By General
Electric in this particular job we were in consortium with Snamprogetti
that was supplying the fuel gas treatment parts.
For the erection and commissioning of Cogeneration Power Plant we manage
more than 20 contractors and 70 Technical Advisors, Total Value 500 million
of USD
Company: Nuovo Pignone(Turbotecnica)EPCC
1997
Site Manager in Boffalora Italy in a turn key contract of
erection/commissioning/start up of a Gas Turbine Coo-generation Power
Plant, 1 Frame 6 Units -Boiler plus balance of plant
Company: Nuovo Pignone (Turbotecnica)EPCC
1995-1997
CCPP Site Manager In Taranto Italy (customer Ilva) in a turn key contract
of erection /commissioning /start up of N3 train consisting of N3 Frame 9
gas turbine with generator and in the same line N.2 centrifugal compressor
as booster for a low pressure gas fuel in this particular job we were in
consortium with Ansaldo that was supplying all coogeration parts including
foundation.
For the erection and commissioning of The Largest Recovery Waste
Cogeneration Power Plant we manage more than 20 contractors and 50
Technical Advisors
This job has been considered as first project of waste fuel recovery from a
steel plant
Company: Nuovo Pignone (Turbotecnica)EPCC
1993 -1995
Site Manager in Port Klang Kapar(Malaysia customer Tenaga) in a turn key
contract of a Fast Track project including erection/commissioning /start up
of N.3 Frame 9 gas turbine Rated 3X 110 MW including all the plant
activities (foundation, building, fuel oil tank, firefighting system.
The particular achievement of this project was to get the first Turbo
generator producing power in 11 months.
For the erection and commissioning we manage more than 10 contractors and
20 Technical Advisors
Company: Nuovo Pignone (Turbotecnica)EPCC
1991 -1993
CCPP Site Manager in kakinada India (customer Nagarjuna Fertilizer) in a
turn key contract of erection/commissioning/start up of a Gas Turbine Coo-
generation Power Plant, 2 Frame 3 Units -Boiler plus balance of plant
For the erection and commissioning we manage more than 10 Technical
Advisors and for the first time an Indian subcontractor
Company: Snamprogetti
1990
Site Manager in Porto Torres Italy in a turn key job of a Power Station
Revamping erection/commissioning /start up of a recovering system of
burning waste of conventional multi fuel boiler installation of a new
liquid coal fuel (called Slurry)
Company: Nuovo Pignone (Turbotecnica)EPCC
1988-1989
As a Site manager in the following project in Italy
Messina erection /commissioning/ start up of a Cogeneration Plant with
Recovery single tube Boiler System consisting of N. 3 recovery boiler N. 1
Steam Turbine driving a Centrifugal Compressor
San Nazzaro Coo-Generation Plant N.1 Frame 5 Gas Turbine + generator and
boiler
Company: Nuovo Pignone (Turbotecnica)EPCC
1985-1987
CCPP Site Manager in Namrup India (customer Hindustan Fertilizer) in a
contract of erection/commissioning/start up of a Gas Turbine CoGeneration
Power Plant, 2 Frame 5 Units rated 2x25 MW, Boiler plus balance of plant
Company: Nuovo Pignone
1983-1985
Site Coordinator Lipetz Russia (Customer GASPROM) coordination of all site
activities of N.3 Frame 5 double shaft gas turbine and PCL centrifugal
compressor including balance of plant
Managing more then 15 TA's
Company: Nuovo Pignone
1980 - 1983
Project Manager (technical) centrifugal compressor department
Managing various project related on technical aspect issuing specification
for purchasing auxiliary (sluiskil Olanda) -(Obiafu Obricon
Nigeria),CO2/Ammonia plant for BHL licence
Company: Nuovo Pignone
1971-1979
Employed by Nuovo Pignone as Mechanical Design Engineer, Design part of
Centrifugal Compressor, Steam Turbine, Gas Turbine and piping on the skid
-Trouble shooting for Centrifugal compressor,Trainer for licensing company
(BHL INDIA) on Ammonia /CO2 compressor Design