Post Job Free

Resume

Sign in

Power Plant Manager

Location:
Kuala Lumpur, Federal Territory of Kuala Lumpur, Malaysia
Posted:
June 26, 2014

Contact this candidate

Resume:

CURRICULUM VITAE

[pic]

Name: ANTONIO BATTISTI

Born Bitonto (BA) Italy

Date 15/01/1947

Status Married

Contact

Antonio Battisti

OIL AND GAS Construction/Project Management

CONSULTANT

No.24, Jalan BRP 2/1c

Bukit Rahman Putra

47000 Sg. Buloh

Selangor - Malaysia

Tel / Fax : (60-036*******

Mobile : (60-012*******

E-mail

aceqje@r.postjobfree.com

Education:

Electrical Engineer (1968)

Other titles and training:

Training in Site Safety Management in Milan, Italy, 1999

Knowledge of Languages:

Mother tongue Italian, fluent in English, good in French and Spanish,

Russian basic

PC software:

Excel, WinWord, Winproject, Power Point.

:

Qualifications

JOB ENGINEERING VARIOUS PLANT

COSTRUCTION COMMISSIONING AS SITE CONSTRUCTION MANAGER OF POWER GENERATION

SIMPLE CICLE AND COGENERATION PlANT UP TO 1200 MW PLANT,Thermal Power Plant

and Ammonia,fertilizer and LNG OIL AND GAS

PROJECT MANAGING

Strengths

ACT WITH UNYIELDING INTEGRITY IN BUSINESS TRANSATION,CONFORM TO PROMOTE

COMPANY POLICIES

Career Interests

Regional Manager

Site Construction manager/Project Director for large project

General Manager for large project Power CoGeneration Plants and Oil and

Gas Plant

Director for Long therm assistance maintenance LNG PLANT as Resident

Engineer

WORK ESPERIENCE

1 st January 2014

Ready to take any opportunity on site managing or project managing inside

and outside Malaysia

January 2011 till 31/12/2013

Consultant for customer Bidding a Coogeneration plant in SABA (Malaysia)

100MW /keddah Malaysia 1500 MW

July 2010 till December 2010

Company ALSTOM

Mechanical Construction Manager PIPING Power Block

3 x400 MW Thermal Cogeneration power Plant

Shoaiba SAUDI ARABIA Phase 3 I was managing all the Turbo block Piping

activity and part of the BOP plant,I have been called by Alstom to boost

this activity that was jeopardizing all project with 6 month contract

january2010 -June 2010

Consultant to various customer for bidding in power plant Malaysia

June 2009 till December 2009

Company: INITEC

Site manager

BOP Thermal cogeneration Power plant 2x 350 MW Gas /Oil fire unit El

tebbin Cairo Egypt I was managing more than 40 supervisors two construction

manager and 1 Commissioning manager and Construction company with 1000

employees

May 2008 -June 2009

Consultant various customer

JUNE 2007 till may 2008

Company: Foster Wheeler Singapore

Coogeneration Power Plant Area manager in Brunei (customer BLNG)

Cogeneration PowerPlant consisting 1 Frame 5 +HRSG and all piping

including civil and structure work I was area manager managing all the

activity related to the Coogeneration Turbo group (Gas turbine + Generator

Boiler + Steam turbine and Generator and all BOP we were Client

Representative .

Company: Shinryo (M) Sdn Bhd(EPCC)

2005 -2007

CCPP Construction Manager in Malaysia(Melaka) (customer PETRONAS ) in a

contract of Engineering/Procurement/Erection/Commissioning/Start up of a CO-

GENERATION Power Plant, 4 Frame 5 Units+ Generators,1 Steam

turbine+Generator,4 HRSG and balance of plant

Company: GE Energy

2004

Bintulu Malaysia LNG (PETRONAS ) as Site Director for daily trouble

shutting maintenance and planned maintenance all LNG turbo gas modules of

SATU DUA and TIGA plant Managing the overall shutdown .

Company: GE Oil and GAS /Nuovo Pignone

2002 -2003

Malaysia as a Resident Project Manager for all erection/commissioning

/start up activities in Far East area including trouble shooting and

planned revision in Turbo Compressors and Turbo Generators Plant and

Cogeneration Plants Supplyed BY GENERAL ELECTRIC in the Far East area(From

China to Australia)

Company: Nuovo Pignone

2000-2001

CCPP Site Manager in Singapore (customer Shell Seraya) in a contract of

erection/commissioning/start up of a Gas Turbine Power Plant, 2 Frame 5

Units rated 2x27 MW plus balance of plant

Company: Nuovo Pignone

1999 - 2000

Site Manager in Kertih Malaysia (customer Petronas) in a contract of

erection/commissioning/start up of an CO2/Ammonia Plant, 3 steam turbine

plus 5 Compressor and balance of plant

Company: Nuovo Pignone

1999

Site Manager in El Morell Spain (customer Repsol) in a turn key contract of

erection/commissioning/start up of a Gas Turbine coo-generation Power

Plant, 1 Frame 3 + generator and 1 steam turbine plus Generator and balance

of plant

Company: Nuovo Pignone (Turbotecnica)EPCC

1997 - 1999

CCPP Site Manager in Sarroch Italy (Customer Saras) in a turn key contract

from engineering phase till erection/commissioning/start up of a LARGE

PROJET of Gas Turbine coo-generation Power Plant N. 3 Train of Frame 9 Gas

Turbine rated 110 MW each in line with a steam turbine Supplied By General

Electric in this particular job we were in consortium with Snamprogetti

that was supplying the fuel gas treatment parts.

For the erection and commissioning of Cogeneration Power Plant we manage

more than 20 contractors and 70 Technical Advisors, Total Value 500 million

of USD

Company: Nuovo Pignone(Turbotecnica)EPCC

1997

Site Manager in Boffalora Italy in a turn key contract of

erection/commissioning/start up of a Gas Turbine Coo-generation Power

Plant, 1 Frame 6 Units -Boiler plus balance of plant

Company: Nuovo Pignone (Turbotecnica)EPCC

1995-1997

CCPP Site Manager In Taranto Italy (customer Ilva) in a turn key contract

of erection /commissioning /start up of N3 train consisting of N3 Frame 9

gas turbine with generator and in the same line N.2 centrifugal compressor

as booster for a low pressure gas fuel in this particular job we were in

consortium with Ansaldo that was supplying all coogeration parts including

foundation.

For the erection and commissioning of The Largest Recovery Waste

Cogeneration Power Plant we manage more than 20 contractors and 50

Technical Advisors

This job has been considered as first project of waste fuel recovery from a

steel plant

Company: Nuovo Pignone (Turbotecnica)EPCC

1993 -1995

Site Manager in Port Klang Kapar(Malaysia customer Tenaga) in a turn key

contract of a Fast Track project including erection/commissioning /start up

of N.3 Frame 9 gas turbine Rated 3X 110 MW including all the plant

activities (foundation, building, fuel oil tank, firefighting system.

The particular achievement of this project was to get the first Turbo

generator producing power in 11 months.

For the erection and commissioning we manage more than 10 contractors and

20 Technical Advisors

Company: Nuovo Pignone (Turbotecnica)EPCC

1991 -1993

CCPP Site Manager in kakinada India (customer Nagarjuna Fertilizer) in a

turn key contract of erection/commissioning/start up of a Gas Turbine Coo-

generation Power Plant, 2 Frame 3 Units -Boiler plus balance of plant

For the erection and commissioning we manage more than 10 Technical

Advisors and for the first time an Indian subcontractor

Company: Snamprogetti

1990

Site Manager in Porto Torres Italy in a turn key job of a Power Station

Revamping erection/commissioning /start up of a recovering system of

burning waste of conventional multi fuel boiler installation of a new

liquid coal fuel (called Slurry)

Company: Nuovo Pignone (Turbotecnica)EPCC

1988-1989

As a Site manager in the following project in Italy

Messina erection /commissioning/ start up of a Cogeneration Plant with

Recovery single tube Boiler System consisting of N. 3 recovery boiler N. 1

Steam Turbine driving a Centrifugal Compressor

San Nazzaro Coo-Generation Plant N.1 Frame 5 Gas Turbine + generator and

boiler

Company: Nuovo Pignone (Turbotecnica)EPCC

1985-1987

CCPP Site Manager in Namrup India (customer Hindustan Fertilizer) in a

contract of erection/commissioning/start up of a Gas Turbine CoGeneration

Power Plant, 2 Frame 5 Units rated 2x25 MW, Boiler plus balance of plant

Company: Nuovo Pignone

1983-1985

Site Coordinator Lipetz Russia (Customer GASPROM) coordination of all site

activities of N.3 Frame 5 double shaft gas turbine and PCL centrifugal

compressor including balance of plant

Managing more then 15 TA's

Company: Nuovo Pignone

1980 - 1983

Project Manager (technical) centrifugal compressor department

Managing various project related on technical aspect issuing specification

for purchasing auxiliary (sluiskil Olanda) -(Obiafu Obricon

Nigeria),CO2/Ammonia plant for BHL licence

Company: Nuovo Pignone

1971-1979

Employed by Nuovo Pignone as Mechanical Design Engineer, Design part of

Centrifugal Compressor, Steam Turbine, Gas Turbine and piping on the skid

-Trouble shooting for Centrifugal compressor,Trainer for licensing company

(BHL INDIA) on Ammonia /CO2 compressor Design