Objective: To provide material, welding specialist
Highlights
. 9 years working experience in QC, NDE,welding inspector
. A self-motivated, multitasking team leader
Certificates
. International welding engineer (IWE) From IIW
. European welding engineer (EWE) From EWF
. Welding Inspection CSWIP 3.1 from TWI Co.
. Certified welding Inspector (CWI certificate expired and in process of
renew it)
. RTI/UT/MT level I&II (SNT-TC-1A)
. WPS & PQR from I.W.R.E.C.
. In process of getting CGSB UT and RTi
. In process of getting CWB level II by end of July
. In process of getting P.Eng.
Skills
. Develop and control WPS and PQR activities;
. Supervise field engineers and inspectors at site;
. Resolve problems and make appropriate recommendations to improve
quality, productivity and equipment performance;
. Interpret Radiography films per ASME B31.3;
. Perform and inspect welding for dissimilar materials such as stainless
steels to carbon steels or creep resistance steels.
Education
. B.A.Sc. in Metallurgy Engineering
Professional Experience
. Quality Control @ Al-Nabaa Al-Yaqeen (NYCO) Iraq, June., 2013-
Feb.2014
KHORMALA POWER PLANT PROJECT
I supervised the piping inspection team. I managed to meet the project
deadline and client satisfaction without compromising the quality. I
achieved these by instructing and assisting the team members takes
proper action in a timely manner and holding regular meetings with
client.
I developed WPS and PQR, inspection method of BUS DUCT and radiography
film interpretation.
. Welding Inspector @ Iran Shipbuilding Offshore Industrial Complex
Company (ISOICO)- IR, May., 2012- June., 2013
South Pars Gas Field Development Project, Phase 14 (Offshore) -
Client: POGC
I was in charge of QC for the construction of topside equipment. I
performed inspections according to the following codes and standards:
ASME Sec. II, V& IX, AWS D1.1, API 5L & 1104, EN 287& 288 and NACE
MR0175 ISO 15156.
I provided welding and quality instructions to vendors per project
requirements which enhanced project progress (time saving) and
quality; and reduced cost
. Site Inspector @ BUREAU VERITAS -,IR, July., 2010- May., 2012
South Pars Gas Field Development Project, Phase 12 (Offshore) -
Client: PPL Co.
I was inspector for construction of SKID SHOE and site facilities.
I effectively administered PQR and WQT tests and trained staff to
incorporate necessary knowledge developing well-defined welding
processes. I issued final version of project QA/QC plan as well as
inspection reports, procedures, test results and graphs to client.
. Welding Inspector @ MEHR ARAZAN IR, April., 2008- June., 2010
Steel Structure Project
I successfully performed welding and dimensional inspection for the
construction of a high rise steel structure as per AWS D1.1 and
controlled surface preparation and painting. I ensured weld procedures
are followed and weld mapping and other construction drawings are
progressively completed.
. Welding engineer @ RAHAB Consulting Engineers IR, Nov., 2006- April.,
2008
Sour Gas Transmission from ASALOUYE to AGHAJARI-5th pipe line
I conducted material and welding inspection as per API 5L and API
1104, reviewed manufacturing processes, implemented proper changes in
welding processes and issued non-conformities as required.
. Welding inspector @ Pars Welding Inspectors IR, Jun., 2004- Nov., 2006
Subway Steel Structure Project
I performed NDT (VT, PT and MT) as well as dimensional check on welded
structures and reported to the client.
Reference
References are available upon request