M.FAISAL FAROOQ
. +92-032*-*******, acepbs@r.postjobfree.com
. Apt # D-508, Rufi Lake Drive, Block 18, Gulistan-e-Jauhar, Karachi,
Pakistan.
WORK EXPERIENCE :
PROJECT: 220MW CCPP Extension Project - 28 MW HRSG & STG INSTALLATION &
INTEGRATION
EMPLOYER: KESC CLIENT: KESC CONTRACTOR: IEG PROJECT
DURATION: JAN 2013 - AUG 2014
. Electrical Engineer - Power ( JULY 2013 - TO DATE )
Job Profile
Electrical Engineer for Execution of Installation, Startup, Commissioning
& Performance Testing of following electrical equipments
- 220KV Gas Insulated Switchgear (SIEMENS) -
220/11.5 KV Step Up Transformer 40MVA (GE)
- 35MVA Generator (GE)
- 11.5/6.6KV Transformer 5MVA (GE)
- 6.6/0.4KV Distribution Transformer 2 MVA (GE) -
11.5 KV, 6.6KV & 0.4KV Switchgears (ABB, GE)
- 6.6KV, 0.4 KV Motors, Actuators, Vibration Sensors -
220KV, 11KV, 0.4KV Cable laying
- AEG & A2B DC & UPS System
. Undertake the professional management and execution of contract and
project works including observation of work to identify industry
standards are applied
. Construction supervision of all activities performed by Contractor
pertaining to Electrical.
. Inspection on various stages of the project as per QA/QC Plan and ITPs.
. Review of Project Schedule and Follow up with Planning Engineer and
Project Manager .
. Detail Design Reviews and necessary modifications/changes by
correspondance with Design Consultant (ZEL) & EPC Contractor (IEG ) to
fulfill all necessary requirements of systems,equipments & other
accessaries
. Basic Design review,Contracts,Scope of Work etc
PROJECT: 9.0 MW POWER HOUSE INSTALLATIONS & COMMISSIONING
EMPLOYER: RAFEY ASSOCIATES CLIENT: SOORTY ENTERPRISE PROJECT DURATION:
AUG 2012 - MAY 2013
[pic] Electrical Commissioning Engineer (November, 2012 - May, 2013)
Job Profile
[pic] Executed Installation & Commissioning of (Two) 12 V 32 WARTSILLA
ENGINES.
[pic] Executed Commissioning of (Two) 5750 KVA STROMBERG HSG 900
ALTERNATORS.
[pic] Executed Installation & Commissioning of Generator &
Synchronization Control Panels.
. Executed Commissioning of SUNROD Water Tube Exhaust Gas Boilers.
[pic] Modification, Installation & Commissioning of Substation including
(Two) 15KV PEL Generator Panels
(Two) 6.3KV PEL Power Transformer Panels
(One) PEL Transformer Panel.
. Installation & Testing of LV Control panels & Power cabling for Engine
Auxiliaries.
. Installation of control cabling for Alternators & DC System.
. Adjustment & Testing of Engine Safeties, Alternator Safeties.
. Executed Commissioning of 2*Westphalia Lube Oil Separators.
. Executed Commissioning of 2* Westphalia Fuel Oil Separators.
M.FAISAL FAROOQ
PROJECT: 232MW KAYABEY POWER PLANT COMMISSIONING & O&M
EMPLOYER: ORIENT ENERGY SYSTEMS (PVT) LTD
. Assistant Engineer - Electrical & Instrumentation (Feb 2011 -
Oct 2012)
Job Profile
. Strengthened KARKEY Commissioning Team from Feb 3rd - April 9th in
preparing KPS-1 Engines for commissioning
. Meggering of Alternators etc.
. Installing and testing Engine Auxiliaries,
. Installing and testing Feeder Panels
. Worked as a supporting staff with POWER TECH (Vendor for Engine
Control Panel and Generator Control Panel Commissioning) in cabling
and testing of ECP & GCP of KPS-1&5.
[pic] Troubleshooting electrical issues on Engine Auxiliaries, Engine
Sensors, AVR,DEGO and MV& LV equipment
. Switching operation of 132kv lines in case of tripping or
scheduled/forced maintenance on HV lines
SIEMENS Pakistan (March 2010 - February 2011)
Management Trainee - Corporate Quality & Process Excellence Management
Department.
EDUCATION
NED UNIVERSITY OF ENGINEERING & TECHNOLOGY, KARACHI.
Bachelors in Electrical Engineering 3.0 GPA
2009
AGA KHAN HIGHER SECONDARY SCHOOL, KARACHI
Intermediate (Pre-Engineering) 81%
2005
THE EDUCATIONAL CENTER, KARACHI
O level
80% 2003
SKILLS
[pic] Excellent Conflict Management, Resource, Planning & organizational
Skills.
[pic] Fluent communication skills.
. Self driven, Proactive, Goal-Oriented, Team player and Ingrained with
hardworking, discipline, versatile and dedicated personality.
TECHNICAL SKILLS
Project Management & Framework Tools (30 credit hour)
Microcontroller Programming &Interface (30 credit hour)
Programmable Logic Controller (30 Credit hour)
EXTRA-CURRICULAR ACHIEVEMENTS
[pic]Winner All Pakistan Inter University Basketball Championship 2009 as
Captain.
[pic]Winner Inter-Departmental Basketball Championship 2009 as Captain.
Inter-Departmental Table Tennis Winner 2009[pic]