Post Job Free

Resume

Sign in

Project Manager Mechanical

Location:
United States
Posted:
June 24, 2014

Contact this candidate

Resume:

Warren T. Howard

P.O. Box *****

Baltimore, Md. *1213

443-***-****

KRYTI K aceo6m@r.postjobfree.com

Objective :

I’m looking for an opportunity to contribute my acquired skills to a winning

team.

Q ualifications :

I can read engineering prints as well as schematics. I’m an independent

worker and also a team player who can build and t roubleshoot from prints,

p rocesses, and drawings. I can make working processes for various types of

p rojects. I have t rained many employees in component assembly, wire

harness construction, continuity checks, and t roubleshooting,

E ducation

ACT (11/92 - 8/93) : received information processing certificate.

B CCC ( 9/07 - present) : majoring in computer information

systems

R elevant Experience :

Advantage/ KNORR BRAKE/WMTA, New Ca r rollton, M d.

E lect r ical/Mechanical Tech (11/12- P resent)

Duties include Build electrical compartments for WMTA 2k, 5k, and 6k, New

Jersey t ransit t rains, Washington Metro t rains, and New York t ransit t rains.

Becton Dickenson, Sparks, M d., P roduction

O perator I I (6/11- 5/12 )

M y duties include assembly of Bactec FX row racks, sub assemblies,

sample drawers, electronic drawers, as well as FX final instrumentation

assembly. My duties also included testing sample drawers, safety testing

F X final instrument, and t raining fellow employees in sub assemblies,

sample drawers, and electronic drawers.

Flight Fab, Beltsville, Md., Electrical /Mechanical

T echnician (10/06- 12/10)

My duties include solely assembling all electrical sub assemblies for the US

Navy PWP processing units, all electrical and mechanical assembly of the

US NAVY REE electronic display panel, electrical assemblies for the

i nternational radiation detection RASA units, as well as electrical and

mechanical assemblies for Northrop Gruman, Lockheed Mart in, and

General Dynamics projects.

Engineered Systems, Cockeysville, M d.,

E lectrical Technician (8/05 – 9/06)

M y duties includes t raining, electrically wi ring, and assembling load

s tation panel, vrl-f, vrl-p, and main panel for U.S. POST OFFICE sorting

machines.

A P I, Columbia, M d.,Elect rical /Mechanical Technician

(10/04 - 2/05)

My duties included disassembling and refit ting printer and computers for

t he federal government. I took the printers apart and refit ted all parts in

subassembly with government issued parts. I rebuilt the laser heads and

t he ink cart ridge with special reflective tape. I replaced all hardware to

adhere to government specs. I disassembled the computers taking only the

hard r ive and installing it in a new government issued housing. I had to

reroute the interior wi ring, install coated fit t ings, install government

issued laser eye, government issued memory, and reassemble and security

seal computers.

A AI CORPORAT ION, H U N T VALLEY, M D, Sr. Lead

E lect r ical/Mechanical Technician (2/99 - 9/03)

On the San Francisco Municipal bus project, I led a team that was

recognized for excellent work performance as well as meeting crucial

deadlines. I performed as well as t rained employees in wire harness

assembly, soldering, t roubleshooting, small and large component assembly.

I led the team that assembled municipal bus roof units which consisted of

h igh and low voltage wi ring. The team and I measured, cut crimped and

connected wire gauges ranging from 22 gauge to 315. I performed quality

assurance checks and routine inspections of roof units. I used engineering

d rawings and hands on inspection to make necessary structural changes to

roof units, drivers’ barrier, digital display housings, bus seatings, interior

l ighting, forward and aft doors, kieppe assembly to bus assembly, and

t ruck assembly and housing for New Jersey Comet t rains. I wrote the

detailed and complete process book for all roof unit area functions. I also

d id light tube bending and light steel cutting for various bus modifications.

I met with project manager on a routine basis to discuss and plan product

scheduling, delays, unit progress, and employee progress. I attended and

completed supervisory t raining. I consulted with engineers in making

changes that would better improve function ability, efficiency and overall

p roduct. I also consolidated a major portion of wires to make a complete

and whole harness which was used as a master harness given to an outside

vendor and copied to increase employee efficiency, speed, and make the

p rocess easier for all employees.

Staff Max I nc., Li thicum, M d., Elect rical Assembler

(11/97 - 2/99)

I assembled sensors, panels, and consoles. I used panduit crimpers to

c rimp terminal r ings on small gauge wires. I terminated wires in

connectors and performed continui ty checks on all terminations.

Colliflower I nc., Baltimore, M d., I nventory Control

M anager (3/94 - 11/97)

I assembled hydraulic lines and consulted with customers including

Lockheed Martin and many local companies to meet their needs in

determining proper hydraullic fi t tings. I was certified to assemble

hydraulic lines of up to 15,000 psi with fi t tings with the parkimp 2 from

Parker Hannifin. I reorganized and managed a workable inventory

system. I was on call 24 hours a day 7 days per week to meet the needs of

customers. I also ordered parts for customers with special needs. I did

i nside sales,as well as, over the phone sales. Another aspect of my duties

was steel tube bending.

References Available Upon Request



Contact this candidate