KAMBIZ KESHVADI
#*** – *** Doris Ave., North York, Ontario, M2N 6W1, CANADA
aceni5@r.postjobfree.com
Objective
To obtain a position in the field of Mechanical Engineering that enables me to utilize my expertise to make a positive
contribution to the organization
Highlights
- Led the project of installation and setting up $17M Gearbox and Engine assembly lines
- Reduced the construction and facility setup cost by 21% by downsizing unnecessary activities
- Managed a $12M Engine assembly plant with annual volume of 300K Engines
- Well-versed in Project and Resources Management and Project Timing Analysis using MS Project
- Excellent knowledge of GD&T, PPAP, FMEA, APQP, ISO / TS16949
- Proven leadership abilities, well-versed in communicating & working with diverse teams
- Hands on experience with professional softwares including: Auto CAD, MS Office, MS Visio
Work Experiences
COMMERCIAL SPRING and TOOL (www.commercialspring.com), Mississauga, Canada
Project Engineer 08/2013 – Present
- Produced project definitions to include validated functional requirements, scope, roles, responsibilities, budgets,
timescales and resources
- Participated in design review and control of the part from prototyping and trial to final approval
- Provided technical support during program launches and prepared related process sheets, instructions and quality alerts
- Coordinated engineering, quality, design, tooling and purchasing teams
- Worked closely with APQP team
- Managed customer relations, production volume, PPAP and project timing schedule
- Ensured effective quality control processes are in place to monitor deliverables produced
RENAULT-NISSAN COMPANY (www.renault.co.ir), Tehran, Iran
Powertrain Engineering General Manager 07/2009 – 06/2013
- Supervised engineering department staff in order to achieve high performance and productivity
- Assigned and coached the project teams
- Managed all activities in Engine assembly plant (Engineering, Production, Purchasing, Quality and Finance)
- Managed activities of the process engineering team in line with the Renault worldwide standards for modification of
parts and processes resulted in better quality and reduced cost (assembly process & part production process)
- Overseen implementation of process modifications in different assembly lines
- Implemented quality standards, audited and validated procedures in suppliers' assembly lines
- Managed, coached and directed Homologation activities for all new projects
- Directed localization projects and localize parts for Gearbox, Driveshaft, External Shifter and Engine (Gears, Shafts,
Aluminum Housings, Clutch, Oil Pump, Water Pump, Plastic Parts, Blanking Parts, Casting Parts, …)
- Studied various Engine/Gearbox in order to use in future for Renault products with considering of emission level, fuel
consumption, price, …
- Extended Powertrain business in Iran by selling Renault Engines and Gearboxes directly to customers
- Supervised Cost Reduction Plan in Powertrain department
KAMBIZ KESHVADI 647-***-**** Page 2 of 2
Localization Manager 07/2007 – 06/2009
- Utilized Renault design tools (GDG, VPM, SIGNE and LUP) in line with Renault worldwide policies
- Validated and approved technical data (3D models and 2D drawings)
- Defined validation plan for all Powertrain localization projects
- Managed analysis of final customer’s quality problems in the sales network which are due to the design of products
- Finding the root cause of Engines or Driveline incidents which are claimed by customers
- Audited local suppliers for manufacturing of Engine Parts, Gearbox Parts, External Shifter and Driveshaft
Project Manager 07/2005 – 06/2007
- Improved efficiency of Engine assembly line (reducing the cycle time, …)
- Managed Engine production ramp-up
- Designed Gearbox assembly line for local suppliers based on Renault requirements
- Managed certification of vehicle in order to pass all safety and environmental regulations and standards (emission level,
fuel consumption, audible warning, …)
NIROO MOHAREKEH INDUSTRIAL COMPANY - NMI Co. (www.nmir.com/en), Tehran, Iran
Engineering Supervisor 07/2003 - 07/2005
- Overseen the preparation of control instructions of Peugeot 206 & 405 Gearbox parts
- Performed root cause analysis of final customer’s quality complaints through sales network
- Evaluated and selected European and Canadian automotive part suppliers
- Implemented Fine Blanking & Rotary Forging technology process for production of Gearbox parts
- Audited suppliers for manufacturing of the jigs and fixtures for assembly lines
- Planned the manufacturing process for Peugeot 206 & 405 Gearbox parts
Mechanical Engineer 04/1998 - 07/2003
- Assisted in setup and design of the assembly lines and prepared BOM, assembly manual and documentation of Peugeot
206 & 405 Gearbox parts
- Involved in design and implementation of the pneumatic and electric multi head nut runners, press and conveyor using
Bosch Co. (Germany) equipment
Education
1998 B.Sc. Mechanical Engineering, Iran University of Science and Technology (www.iust.ac.ir)
Trainings
2013 Gearbox assembly line Renault-Nissan Corp. Bursa, Turkey
2012 New methods for Engine/Gearbox assembly Renault-Nissan Corp. Paris, France
2012 Casting/Machining aluminum parts Renault-Nissan Corp. Portugal, Porto
2011 Homologation and Regulation Renault-Nissan Corp. Paris, France
2011 Engine assembly process Renault-Nissan Corp. Curitiba, Brazil
2011 Management, Strategic target setting Renault-Nissan Corp. Tehran, Iran
2009 Assembly process of Powertrain parts Renault-Nissan Corp. Valladolid, Spain
2006 External shifter (production and validation) Renault-Nissan Corp. Paris, France
2004 Fine Blanking Technology Sekam Technologies Kitchener, Canada
2004 Peugeot Gearbox parts manufacturing process PSA Peugeot Citroen Corp. Metz, France
References
Available upon request.