LEROY P. SHIREY 440-***-****
**** *** *****, ****** ** the Lake, Ohio 44060 E-mail: acek6z@r.postjobfree.com
OBJECTIVE: MAINTENANCE / PROJECT MANAGEMENT
To Manage Projects and Maintenance programs in a technically-oriented manufacturing environment by contributing proven
ability to:
Exceed High Standards & Goals by effectively prioritizing, scheduling and coordinating activities,
managing multiple operations and projects and developing innovative ideas and strategies.
Build Team Productivity & Morale by continually encouraging positive attitudes, openly and influentially
communicating ideas and interacting and developing training and motivational programs.
Quickly Resolve Operational Problems by providing hands-on expertise in machine and mechanical processes,
calmly adapting to transition and change and decisively responding to critical situations.
QUALIFICATIONS: A reliable, determined and multi-dimensional professional with clearly developed technical
aptitude and interest offering over 20 years relevant experience encompassing:
•Independent Project Management •Troubleshooting/Resolving •Detailed Follow-up/Through
•Team Leadership/Coordination •Collecting/Analyzing/Interpreting •Learning Quickly/Adapting
•Strong Interpersonal Rapport •Developing Systems/Procedures •Technical/Mechanical Expertise
ACHIEVEMENTS:
RESEARCHED / INTEGRATED OUTDATED MATERIAL LOADING SYSTEM with new resin blending
machinery by analyzing and designing methods for connection, thereby reclaiming scrap material and saving
$.40/lb in recycling costs.
IMPLEMENTED PREVENTIVE MAINTENANCE PROGRAM by coordinating personnel to perform
scheduled PM tasks and OEM recommended services, successfully updating procedures and saving $360/hr
in unplanned down time.
DEMONSTRATED EXCEPTIONAL ABILITY to learn quickly by efficiently adapting new machinery and
practices to meet production standards, resulting in a 15% reduction of overall time of implementation.
EXCELLED AS TEAM LEADER by creating good working relations and communication between
maintenance personnel, resulting in 100% project completions ahead of schedule.
CONDUCTED INDIVIDUALIZED TRAINING SESSIONS involving machine operations, maintenance
procedures and safety regulations, significantly improving reliability with a 20% increase in production
output.
IMPROVED MAINTENANCE DEPARTMENT PERFORMANCE by reorganizing records and
information cells, researching machines for problem areas and utilizing trend line analysis to predict probable
machine failures, resulting in 30% less unplanned down time and 50% decrease in repair time.
ESTIMATED / SCHEDULED / INSTALLED SECTIONS of large custom production machine by systematically
organizing sub assemblies of machine parts, completing a $2.5MM order 2 weeks ahead of 6-month dead line.
REENGINEERED / CONSTRUCTED AUTOMATED ASSEMBLY EQUIPMENT by utilizing local
resources of steel framing and electrical parts, resulting $2,600 saving per unit.
LEROY P. SHIREY Page 2
PROFESSIONAL EXPERIENCE:
MAINTENANCE MANAGER Burton Ind. 02/05-present
Mentor, OH
Interim Plant Manager directing more than 20 employees. Project Manager for new engineering projects.
Schedule general maintenance. Troubleshoot and repair production machinery. Upgrade and implement
preventive maintenance program. Installation and modification of machinery. Parts acquisitions.
MAINTENANCE REPAIRMAN Polychem corp. 10/03- 11/04
Mentor, OH
Perform general maintenance. Troubleshoot and repair production machinery. panel building. modification of
production machinery.
MAINTENANCE REPAIRMAN North American Packaging 03/01 - 10/03
Cleveland, OH
Perform general maintenance. Troubleshoot and repair production machinery. Control the design and
construction of custom machinery. Assembly of automation lines. Robotics updating, troubleshooting and repair.
Parts acquisitions. Maintain and update machinery blue prints and schematics.
LEAD MAINTENANCE TECHNICIAN The Garland Company 10/00 - 3/01
Cleveland, OH
Oversaw construction of custom production machinery. Performed general maintenance. Controlled design and
installation. Directed weekly fire system test and inspection.
LEAD MAINTENANCE TECHNICIAN / Royal Plastics, Inc. 9/97 - 10/00
MAINTENANCE MANAGER Mentor, OH
Performed maintenance on all machinery. Directed preventive maintenance program. Part acquisitions. Installed
and troubleshot all machinery. Performed light tool room work. Oversaw maintenance department record
keeping. Trained new maintenance personnel on use of new machinery. Conducted daily safety inspections.
PREVENTATIVE MAINTENANCE Plastek, Inc. 2/92 - 9/97
MECHANIC Erie, PA
Trained janitorial personnel. Performed preventive maintenance on production machinery. Parts room attendant.
Repaired production machinery. Conducted safety inspections. Oversaw construction of new or custom auxiliary
machinery.
SYSTEMS ANALYST Bricks, Inc. 10/89 - 4/91
Chicago, IL
Designed and implemented accounting software. Performed payroll calculations and check disbursement.
Managed inventory transactions and inventory audit.
EDUCATION / TRAINING:
B.S.M.E (Warren National University); Member of A.S.M.E; Coursework in Computer Programming (Erie
County Technical School) and Computer Science / Programming (DeVry Institute); Certificates of Completion:
Advanced Hydraulics; Advanced Industrial Electricity; Digital; Blueprint Reading; Maintenance Welding (Erie
County Tech Adult Education); experience in Tower and Chiller Systems, Air Compressors, 480VAC Bussway,
Overhead Lighting, Material Handling Systems, Inventory Control, Machine Installation. USNR Seabees
Construction Mechanic “A” School.